LAC 43:XIII.1315

LAC 43:XIII.1315. Preparation for Welding [49 CFR 192.235]

Last amended: 2004Year: 2026Length: 57 wordsOfficial source

Cite as La. Admin. Code tit. 43, pt. XIII, § 1315

A. Before beginning any welding, the welding surfaces must be clean and free of any material that may be detrimental to the weld, and the pipe or component must be aligned to provide the most favorable condition for depositing the root bead. This alignment must be preserved while the root bead is being deposited. [49 CFR 192.235]
LAC 43:XIII.1315: LAC 43:XIII.1315. Preparation for Welding [49 CFR 192.235] | Justis AI