Justis AI
Product
Solutions
Use cases
Resources
Pricing
Sign In
Book Now
US law
Massachusetts
Regulations
522 CMR โ Board of Boiler Rules
522 CMR 7.00 โ Air tanks
Massachusetts ยท Regulations
522 CMR 7.00 โ Air tanks
7 sections
7 sections
522 CMR 7.01
Scope
522 CMR 7.02
Construction
522 CMR 7.03
Installation
522 CMR 7.04
Inspections and Certificates
522 CMR 7.05
Pressure Relief Valves
522 CMR 7.06
Gauges and Drains
522 CMR 7.07
Welded Repairs, Major Repairs, Alterations