301 CMR 11.02
Definitions
(1) Undefined Terms. As used in 301 CMR 11.00, any term not defined in accordance with
301 CMR 11.02(2) shall have the meaning given to the term by any statutes, regulations,
executive orders or policy directives governing the subject matter of the term. Examples include
a term pertaining to:
(a)
wetlands, which is defined by the Massachusetts Wetlands Protection Act,
M.G.L. c. 131, § 40, and its implementing regulations, 310 CMR 10.00: Wetlands
Protection, and 33 USC 1341 and 314 CMR 9.00: 401 Water Quality Certification for
Discharge of Dredged or Fill Material, Dredging, and Dredged Material Disposal in Waters
of the United States within the Commonwealth regarding Water QualityCertification, as well
as other statutes, regulations, executive orders, or policy directives that govern wetlands
issues; and
(b)
roadways or traffic, which is defined by the Massachusetts Department of
Transportation Highway Division at 700 CMR 13.00: Approval of Access to Massachusetts
Department of Transportation Highways and Other Property.
(2) Defined Terms. As used in 301 CMR 11.00, the following terms shall have the following
meanings:
Agency.
(a) Any agency, department, board, commission, or authority of the Commonwealth.
(b) Agency shall not be considered to include a Federal, municipal, or regional agency,
department, board, commission or authority, unless it is:
1.
a municipal redevelopment agency created or acting in accordance with
M.G.L. c. 121A or M.G.L. c. 121B; or
2. any other authority of any political subdivision of the Commonwealth that is created
or acting specifically as an authority in accordance with applicable statutes.
Agency Action.
(a) In the case of a Project undertaken by an Agency, any formal and final authorization,
appropriation, execution of a contract or other decision by the Agency to proceed to
Commencement of a Project.
(b) In the case of a Project undertaken by a Person, any formal and final action taken by an
Agency in accordance with applicable statutes and regulations that grants a Permit, provides
Financial Assistance, or closes a Land Transfer.
(c) Agency Action is not final if the Permit, contract or other relevant document approving
or allowing the Agency Action contains terms such as a condition or restriction that provides
that such Agency Action shall be deemed not to have taken place, unless and until the
Secretary has determined that:
1. no EIR is required; or
2. a single or final EIR is adequate and 60 Days have elapsed following publication of
notice of the availability of the single or final EIR in the Environmental Monitor in
accordance with 301 CMR 11.15(2), provided that the Agency shall reconsider and
confirm or modify the Agency Action and any conditions thereof following completion
of MEPA review.
(d) Agency Action is final even if subject to subsequent judicial or administrative appeal.
Archaeological Site. Any location of a significant event, prehistoric or historic occupation or
activity, or building or structure, whether standing, ruined, or vanished, where the location itself
maintains historical or archaeological value, regardless of the value of any existing building or
structure.
Capacity.
(a) Design capacity, i.e., the maximum capacity for which a facility or system is designed
and at which a facility or system can operate, regardless of statutory, regulatory, contractual
or other conditions or restrictions.
(b) Daily Capacity shall be considered maximum Capacity on any given Day of operation
and not an annual average.
Carbon Dioxide (CO2) Equivalent. The amount of carbon dioxide by weight that would produce
the same amount of global warming impact as a given weight of another greenhouse gas, based
on the best available science, including information from the Intergovernmental Panel on
Climate Change.
Commonwealth. The Commonwealth of Massachusetts.
Commencement of Construction.
(a) Initiation of on-site physical or construction work or activity.
(b) Research, design, or other work or activity necessary to evaluate a Project for purposes
of MEPA and 301 CMR 11.00 and other environmental statutes or regulations shall not be
considered Commencement of Construction.
Commencement of a Project.
(a) The earliest of:
1. initiation of the operational phase of the Project;
2. Commencement of Construction; or
3. initiation of any preparatory phase of the Project, including any action or expenditure
of funds on the financing, marketing, or development of the Project.
(b) Research, design, or other work or activity necessary to evaluate a Project for purposes
of MEPA and 301 CMR 11.00 and other environmental statutes or regulations shall not be
considered Commencement of a Project.
Damageto the Environment. Anydestruction or impairment(notincludinginsignificant damage
or impairment), actual or probable, to any of the natural resources of the Commonwealth
including, but not limited to, air pollution, GHG emissions, water pollution, improper sewage
disposal, pesticide pollution, excessive noise, improper operation of dumping grounds, reduction
of groundwater levels, impairment of water quality, increases in flooding or storm water flows,
impairment and eutrophication of rivers, streams, flood plains, lakes, ponds or other surface or
subsurface water resources, destruction of seashores, dunes, marine resources, underwater
archaeological resources, wetlands, open spaces, natural areas, parks, or historic districts or sites.
Day.
(a) Calendar day.
(b) If the deadline for the Secretary to issue a certificate, determination, or other document,
or for an Agency to take Agency Action, or for any Agency or Person to file comments,
notices, or review documents in accordance with MEPA and 301 CMR 11.00 falls on a
Saturday, Sunday or legal holiday, the deadline shall be considered to fall on the next
business day.
Designated Geographic Area.
(a) With respect to a Project, the area within one mile of the Project; or, for a Project that
meets or exceeds MEPA review thresholds at 301 CMR 11.03(8)(a) and (b) or that generates
150 or more New adt of diesel vehicle traffic over a duration of one year or more, excluding
public transit trips, the area within five miles of the Project.
(b) With respect to an Environmental Justice Population, the area within one mile of the
Environmental Justice Population; or, for a Project that meets or exceeds MEPA review
thresholds at 301 CMR 11.03(8)(a) and (b) or that generates 150 or more New adt of diesel
vehicle traffic over a duration of one year or more, excluding public transit trips, the area
within five miles of the Environmental Justice Population.
Ecological Restoration Project. Any Project defined as an Ecological Restoration Project under
310 CMR 10.00: Wetlands Protection. For the purposes of 301 CMR 11.00, this term does not
include an Ecological Restoration Limited Project.
Ecological Restoration Limited Project. Any Project defined as an Ecological Restoration
Limited Project under 310 CMR 10.00: Wetlands Protection and described in 310 CMR
10.24(8) and 10.53(4).
Environmental Benefits. Access to clean natural resources, including air, water resources, open
space, constructed playgrounds and other outdoor recreational facilities and venues, clean
renewable energy sources, environmental enforcement, training and funding disbursed or
administered by the executive office of energy and environmental affairs.
Environmental Burden. Any destruction, damage or impairment (not including insignificant
destruction, damage or impairment) of any of the natural resources of the Commonwealth,
resulting from intentional or reasonably foreseeable causes including, but not limited to, climate
change, air pollution, water pollution, improper sewage disposal, dumping of solid wastes and
other noxious substances, excessive noise, activities that limit access to natural resources and
constructed outdoor recreational facilities and venues, inadequate remediation of pollution,
reduction of ground water levels, impairment of water quality, increased flooding or storm water
flows, and damage to inland waterways and waterbodies, wetlands, marine shores and waters,
forests, open spaces, and playgrounds from private industrial, commercial or government
operations or other activity that contaminates or alters the quality of the environment and poses
a risk to public health.
Environmental Justice Population.
(a) A Neighborhood that meets one or more of the following criteria:
1. the annual median household income is not more than 65% of the statewide annual
median household income;
2. minorities comprise 40% or more of the population;
3. 25% or more of households lack English language proficiency;
4. minorities comprise 25% or more of the population and the annual median household
income of the municipality in which the neighborhood is located does not exceed 150%
of the statewide annual median household income; or
(b)
a geographic portion of a Neighborhood designated by the Secretary as an
Environmental Justice Population pursuant to M.G.L. c. 30, § 62; provided, however, that
a Neighborhood or a geographic portion of a Neighborhood that the Secretaryhas determined
shall not be designated an Environmental Justice Population pursuant to M.G.L. c. 30, § 62
shall not be considered an Environmental Justice Population under 301 CMR 11.00.
Environmental Justice Principles. Principles that support protection from environmental
pollution and the ability to live in and enjoy a clean and healthy environment, regardless of race,
color, income, class, handicap, gender identity, sexual orientation, national origin, ethnicity or
ancestry, religious belief or English language proficiency, which includes:
(a)
the meaningful involvement of all people with respect to the development,
implementation and enforcement of environmental laws, regulations and policies, including
climate change policies; and
(b) the equitable distribution of energy and environmental benefits and environmental
burdens.
Expansion. Anymaterial increase in Capacity, demand on infrastructure, or physical dimensions
of a Project or frequency of activity associated with the Project.
Financial Assistance.
(a) Any direct or indirect financial aid to any Person provided by any Agency including, but
not limited to, mortgage assistance, special taxing arrangements, grants, issuance of bonds,
loans, loan guarantees, debt or equity assistance, and the allocation of Commonwealth or
Federal funds.
(b) Financial Assistance shall not be considered to include:
1.
the grant of aid for medical services or personal support, such as welfare or
unemployment funds, to an individual or third-party on behalf of an individual;
2.
pass-through of Federal funds or issuance of bonds solely on behalf of a local
economic development or financing agency, without allocation by an Agency; or
3. routine staff assistance.
Greenhouse Gas (GHG). Includes all of the following gases: carbon dioxide, methane, nitrous
oxide, hydrofluorocarbons, perfluorocarbons, and sulfur hexafluoride.
HistoricStructureorDistrict. Anyhistoric property, landmark, building,structure, or district that
is significant to the history or prehistory of the Commonwealth, its counties, or municipalities.
Land Transfer.
(a) The execution and delivery by an Agency of any deed, lease, license or other document
that transfers real property or an interest in real property.
(b) For purposes of review thresholds, Land Transfer shall not be considered to include the
execution and delivery of a deed, lease or license to continue a preexisting lawful use on a
Project site, or amendments or extensions thereof.
MEPA Office. The Secretary's staff that carries out day-to-day administration of MEPA and
301 CMR 11.00.
Neighborhood. A census block group as defined by the United States Census Bureau, excluding
people who live in college dormitories and people who are under formallyauthorized, supervised
care or custody, including federal, state or county prisons.
New. Any work or activity that is not:
(a) existing;
(b) being carried out currently as part of, used by, or generated by a previous, actual or
permitted use of the Project site; or
(c) being carried out within three years since the later of discontinuance of the previous use
or issuance of the relevant Permit.
ParticipatingAgency. AnyAgencyto which the Proponent hasmade or will make an application
for a Permit, Financial Assistance, or a Land Transfer.
Permit.
(a) Any permit, license, certificate, variance, approval, or other entitlement for use, granted
by an Agency for or by reason of a Project.
(b) Permit shall be considered to include an entitlement for use granted by an Agency in
accordance with delegated authority in accordance with Federal environmental statutes or
regulations (including certification of compliance with the statutes and regulations).
(c) Permit shall not be considered to include a general entitlement to a Person to carry on
a trade or profession, or to operate mechanical equipment which does not depend upon the
location of such trade or operation.
(d) For purposes of review thresholds, Permit shall not be considered to include:
1.
a consent order or agreement to the extent it addresses noncompliance with
applicable statutes and regulations and does not allow or approve a New Project or an
Expansion of a Project;
2. a general or programmatic permit, license, certificate, variance or approval applying
to a category of Projects rather than to each individual Project;
3. a permit, license, certificate, variance or approval by rule or by self-certification of
compliance; and
4. a permit, license, certificate, variance, or approval to continue a preexisting lawful
use on a Project site, or amendments or extensions thereof.
Person. Any individual, corporation, partnership, trust, association, or other business or non
profit organization, or any Federal, municipal, or regional governmental, intergovernmental or
other entity that is not an Agency.
Project. Any work or activity that is undertaken by:
(a) an Agency; or
(b) a Person and requires a Permit or a Land Transfer, or seeks the provision of Financial
Assistance.
Proponent. AnyAgencyor Person, includinga designee orsuccessor in interest, that undertakes,
or has a significant role in undertaking, a Project.
Replacement Project. Any Project to repair, replace, or reconstruct a previously authorized use
of or Project on a Project site that does not:
(a) increase potential environmental impacts or need additional or changed environmental
Permits for the increased impacts; or
(b) result in any substantial (10% or more) Expansion of the use or Project, provided that
the previous use or Project has not been discontinued for more than three years and that the
Expansion does not meet or exceed any review thresholds.
Routine Maintenance. Any maintenance work or activity carried out on a regular or periodic
basis in a manner that has no potential for Damage to the Environment or for which performance
standards have been developed that avoid, minimize, or mitigate potential environmental impacts
to the maximum extent practicable.
Scope. The written certificate issued bythe Secretaryin accordancewith 301 CMR 11.06(7) that
specifies the form, content, level of detail, and alternatives required for an EIR.
Secretary. The Secretary of Energy and Environmental Affairs.
Section 61 Findings. The determinations and findings that an Agency shall make in accordance
with M.G.L. c. 30, § 61, and 301 CMR 11.12(5) prior to or when taking Agency Action on a
Project for which the Secretary required an EIR.
Stationary Source. Any individual stationary piece of equipment from which any air pollutant
or greenhouse gas is emitted to the ambient air, or any other stationary emission point.
(3) Abbreviations and Acronyms. As used in 301 CMR 11.00, the following abbreviations and
acronyms shall have the following meanings:
adt
Average Daily Trips.
ACEC
Area of Critical Environmental Concern.
CAC
Citizens Advisory Committee.
CO2
Carbon dioxide.
cy
Cubic yards.
EEA
Executive Office of Energy and Environmental Affairs.
ENF
Environmental Notification Form.
EIR
Environmental Impact Report.
GHG
Greenhouse Gas.
gpd
Gallons per day.
HAP
Hazardous Air Pollutant.
kv
Kilovolts.
MEPA
The Massachusetts Environmental Policy Act, M.G.L. c. 30,
§§ 61through 62L.
MW
Megawatts.
Nox
Oxides of Nitrogen.
NPC
Notice of Project Change.
PM10
Particulate matter less than or equal to 10 microns in diameter.
PM 2.5
Particulate matter less than or equal to 2.5 microns in diameter.
sf
Square feet.
SO2
Sulfur Dioxide.
tpd
Tons per day.
tpy
Tons per year.
VOC
Volatile Organic Compound.