330 CMR 27.09
Review of Plans for Construction or Remodeling of Milking Centers
When a milking center or potable water source is to be constructed or extensively remodeled,
or an existing structure is to be converted for use as a milking center, properly prepared plans and
specifications for such construction, remodeling or alteration, showing layout, arrangement and
construction materials of work areas, and the location, size and type of fixed equipment and
facilities, shall be submitted to the Department, or the appropriate out-of-state regulatory
authority for approval before such work is begun.