105 CMR 120.661
Construction Monitoring and Acceptance Testing
The requirements of 105 CMR 120.661 must be met for irradiators whose construction began
after July 1, 1993. The requirements must be met prior to loading sources.
(A) Shielding: For panoramic irradiators, the licensee shall monitor the construction of the
shielding to verify that its construction meets design specifications and generally accepted
building code requirements for reinforced concrete.
(B) Foundations: For panoramic irradiators, the licensee shall monitor the construction of the
foundations for verify that their construction meets design specifications.
(C) Pool Integrity: For pool irradiators, the licensee shall verify that the pool meets design
specifications and shall test the integrity of the pool. The licensee shall verify that outlets and
pipes meet the requirements of 105 CMR 120.653(B).
(D) Water Handling System: For pool irradiators, the licensee shall verify that the water
purification system, the conductivity meter, and the water level indicators operate properly.
(E) Radiation Monitors: For all irradiators, the licensee shall verify the proper operation of the
monitor to detect sources carried on the product conveyor system and the related alarms and
interlocks required by 105 CMR 120.649(A). For pool irradiators, the licensee shall verify the
proper operation of the radiation monitors and the related alarm if used to meet 105 CMR
120.679(B). For underwater irradiators, the licensee shall verify the proper operation of the over-
the-pool monitor, alarms, and interlocks required by 105 CMR 120.649(B).
(F) Source Rack: For panoramic irradiators, the licensee shall test the movement of the source
racks for proper operation prior to source loading; testing must include source rack lowering due
to simulated loss of power. For all irradiators with product conveyor systems, the licensee shall
observe and test the operation of the conveyor system to assure that the requirements in 105
CMR 120.655 are met for protection of the source rack and the mechanism that moves the rack;
testing must include tests of any limit switches and interlocks used to protect the source rack and
mechanism that moves that rack from moving product carriers.
(G) Access Control: For panoramic irradiators, the licensee shall test the completed access
control system to assure that it functions as designed and that all alarms, controls, and interlocks
work properly.
(H) Fire Protection: For panoramic irradiators, the licensee shall test the ability of the heat and
smoke detectors to detect a fire, to activate alarms, and to cause the source rack to automatically
become fully shielded. The licensee shall test the operability of the fire extinguishing system.
(I) Source Return: For panoramic irradiators, the licensee shall demonstrate that the source
racks can be returned to their fully shielded positions without offsite power.
(J) Computer Systems: For panoramic irradiators that use a computer system to control the
access control system, the licensee shall verify that the access control system will operate
properly if offsite power is lost and shall verify that the computer has security features that
prevent an irradiator operator from commanding the computer to override the access control
system when it is required to be operable.
(K) Wiring: For panoramic irradiators, the licensee shall verify that the electrical wiring and
electrical equipment that were installed meet the design specifications.