R 299.2356
R 299.2356 Blowout prevention equipment.
Cite as Mich. Admin. Code R 299.2356
Rule 2356. (1) All wells shall be equipped with the following equipment during drilling:
(a) A double ram blowout preventer, including pipe and blind rams, and an annular-type
blowout preventer or other equivalent control system as approved by the supervisor of
mineral wells or authorized representative of the supervisor of mineral wells.
(b) Accessible controls both on the rig floor and at a safe remote location.
(c) A kelly valve.
(d) A drill pipe safety valve.
(e) A flow line of the proper size and working pressure.
(f) Blowout prevention equipment that has a rated working pressure which equals or
exceeds the maximum anticipated surface pressure of the well.
(2) The blowout preventers shall be installed above ground level. The entire control
equipment shall be in good working condition at all times. All outlets, fittings, and
connections on the casing, blowout preventers, choke manifold, and auxiliary wellhead
equipment that may be subjected to wellhead pressure shall be of a material and
construction that will withstand the anticipated pressure. The lines from outlets on or
below the blowout preventers shall be securely installed, anchored, and protected from
damage.
(3) Blowout preventers, accumulators, and pumps shall be certified as operable under
the product manufacturer's minimum operational specifications. Certification shall
include the proper operation of the closing unit valving, the pressure gauges, and the
manufacturer's recommended accumulator fluids. Certification shall be obtained through
an independent company that tests blowout preventers, stacks, and casings. Certification
shall be required annually and shall be posted on the rig floor. In addition to the primary
closing system, including an accumulator system, the blowout preventers shall have a
secondary system. A combination of any 2 of the following secondary closing systems is
acceptable:
(a) Electric-operated pump.
(b) Air-operated pump.
(c) Hand-operated pump.
(d) Nitrogen-operated pump.
Extensions that have hand wheels are not mandatory. Blowout preventer rams shall be of
a proper size for the drill pipe being used or production casing being run in the well or
shall be variable-type rams that are of the proper size range.
(4) Blowout prevention equipment shall be tested to a pressure commensurate with the
expected formation pressure, but not less than 1,000 psig at surface for not less than 20
minutes, before drilling the plug on the surface casing, intermediate casing, and the
production casing and before encountering all high-pressure formations and at other
intervals as approved or requested by the supervisor of mineral wells. If requested, an
authorized representative of the supervisor of mineral wells shall be notified before the
commencement of a test. A record of each test, including test pressures, times, failures,
and each mechanical test of the casings, blowout preventers, surface connections, surface
fittings, and auxiliary wellhead equipment shall be entered in the logbook, signed by the
driller, and kept available for inspection by the supervisor of mineral wells or authorized
representative of the supervisor of mineral wells.
(5) A trip tank, or an accurate drilling fluid monitoring system, and a gas buster and
flare system shall be in place when penetrating the A2 Carbonate or any known or
suspected overpressured formations. Permission to change or modify the requirements
specified in this subrule may be granted by submitting a written request to the supervisor
of mineral wells or authorized representative of the supervisor of mineral wells. The
requirements may be changed or modified only after submission of a written request and
receipt of written approval from the supervisor of mineral wells or authorized
representative of the supervisor of mineral wells.
(6) An exception to all or part of this rule may be granted by the supervisor of mineral
wells or authorized representative of the supervisor of mineral wells when drilling in
shallow low-pressure formations. The supervisor of mineral wells or authorized
representative of the supervisor of mineral wells may grant an exception upon receipt of
an application for a permit that is accompanied by a written request and supportive data.