R 325.1664
R 325.1664 Abandonment of wells; plugging materials.
Cite as Mich. Admin. Code R 325.1664
Rule 164. Abandoned well or dry hole plugging materials shall be placed as follows:
(a) Bentonite chips or bentonite pellets shall be poured slowly into the top of the well or
dry hole to prevent bridging in the casing or borehole. Fine bentonite particles that
accumulate in the shipping container shall not be used. The plugging operation shall
continue until the bentonite chips or bentonite pellets appear at the ground surface. Upon
completion of the plugging operation, water shall be placed into the casing or borehole to
promote expansion of the bentonite above the static water level.
(b) Neat cement, concrete grout, or bentonite grout shall be placed through a tremie pipe
from the bottom of the well or dry hole to the ground surface.
(c) Other materials and methods may be used if the materials and methods proposed to be
used will plug the abandoned well or dry hole to prevent them from acting as a channel
for contamination or the escape of subterranean gases and if prior approval is given by a
health officer.