10 CSR 20-8.160
Settling
PURPOSE: This rule specifies the minimum standards for the design of settling operations that are part of wastewater collection
and treatment systems. This rule is to be used with rules 10 CSR
20-8.110 through 10 CSR 20-8.210. It does not address all aspects
of design, and the design engineer may refer to other appropriate
reference materials so long as these minimum standards set forth
in this rule are met.
Editor’s Note: The secretary of state has determined that the publication of this rule in its entirety would be unduly cumbersome
or expensive. The entire text of the material referenced has been
filed with the secretary of state. This material may be found at the
Office of the Secretary of State or at the headquarters of the agency
and is available to any interested person at a cost established by
state law.
(1) Applicability. Wastewater systems that utilize settling shall
be designed based on criteria contained in this rule, published
standards, applicable federal and state requirements, standard
textbooks, current technical literature, and applicable safety
standards. In the event of any conflict between the above criteria, the requirement in this rule shall prevail.
(A) This rule shall not apply to treatment units covered in 10
CSR 20-8.300.
(B) This rule shall not apply to treatment units covered in 10
CSR 20-8.500.
(2) General Considerations.
(A) Number of Units. Multiple settling units capable of independent operation are desirable and shall be provided in all
wastewater treatment facilities where design flows exceed one
hundred thousand (100,000) gallons per day (gpd). Wastewater
treatment facilities without multiple settling units shall be
designed to include other provisions to assure continuity of
treatment.
(B) Flow Distribution. Effective flow splitting devices and
control appurtenances (e.g. gates and splitter boxes) shall be
provided to permit proper proportioning of flow and solids
loading to each settling unit, throughout the expected range
of flows.
(3) Design.
(A) Side Water Depth. The minimum side water depth shall
be as follows in Table 160-1 below:
(B) Surface Overflow Rates.
1. Primary settling tanks. Calculate the surface overflow
rates for both design average flow and design peak hourly flow
from Table 160-2 below. The larger area shall determine the size
of the settling tank.
2. Final settling tanks – attached growth biological reactors. Surface overflow rates for settling tanks following
attached growth biological reactors shall not exceed one thousand two hundred gallons per day per square foot (1,200 gpd/
ft2) based on the design peak hourly flow.
3. Final settling tanks – activated sludge. The following
design criteria in Table 160-3, included herein, shall not be
exceeded:
(C) Weirs.
1. General. Overflow weirs shall be readily adjustable over
the life of the structure to correct for differential settlement of
the tank.
2. Design rates. The following weir loadings in Table 160-4,
below, shall not be exceeded:
(D) Submerged Surfaces. The underside and the tops of
troughs, beams, and similar submerged construction elements
shall have a minimum slope of one vertical to one horizontal
(1:1) to prevent the accumulation of scum and solids.
(E) Freeboard. Walls of settling tanks shall extend at least six
inches (6") above the surrounding ground surface and shall
provide not less than twelve inches (12") of freeboard.
(4) Sludge Removal.
Table 160-1. Minimum Side Water Depth.
Type of Settling Tank
Minimum Side
Water Depth
(ft)
Primary (>100,000 gpd)
10
Primary (<100,000 gpd)
7
Final following activated sludge
process
12
Final following attached growth
biological reactor (>100,000 gpd)
10
Table 160-2. Maximum Primary Settling Tank Surface Overflow Rates.
Type of Primary
Settling Tank
Surface Overflow Rates1:
At Design Average Flow
(gpd/ft2)
At Design Peak
Hourly Flow
(gpd/ft2)
Tanks not receiving waste
activated sludge
1,000
3,000
Tanks receiving waste
activated sludge
700
1,700
Chemically enhanced
1,400
1,500
1 Calculate surface overflow rates with all flows received at the settling tanks.
Table 160-4. Maximum Weir Loading Rates.
Average Wastewater Treatment Facility
Capacity (million gallons per day or
MGD)
Loading Rate at Design
Peak Hourly Flow
(gpd/lf)
Less than 0.1
10,000
0.1 through 1.0
20,000
Greater than 1.0
30,000
Table 160-3. Maximum Activated Sludge Final Settling Tank
Rates.
Treatment Process
Surface Overflow
Rate at Design
Peak Hourly Flow1
(gpd/ft2)
Peak Solids
Loading
Rate2
(lb/day/ft2)
With diurnal flow
equalization3
1,000
35
Without diurnal flow
equalization3
150 x Peaking
Factor4
35
Conventional,
Step Aeration,
Complete Mix,
Contact Stabilization,
Carbonaceous Stage of
Separate Stage
Nitrification
1,200 5
40
Extended Aeration
Single-Stage
Nitrification
1,000
35
Multi-Stage
Nitrification
800
35
Activated Sludge with
Chemical addition to
Mixed Liquor for
Phosphorus Removal
900
35
1 Based on influent flow only.
2 Calculate the peak solids loading rate based on the design maximum
day flow rate plus the design maximum return sludge rate requirement
and the design mixed liquor suspended solids under aeration.
3 Applicable to wastewater treatment facilities with a design average flow
of less than one hundred thousand gallons per day (100,000 gpd).
4 To determine the peaking factor use 10 CSR 20-8.110(3) Equation 110-1.
5 Wastewater treatment facilities needing to meet twenty milligrams per
liter (20 mg/L) suspended solids or less should reduce the surface overflow
rate to one thousand gallons per day per square foot (1,000 gpd/ft2).
(A) Settling floor. The minimum slope of the settling floor
shall be one vertical to twelve horizontal (1:12) for conventional
settling tanks and one vertical to one hundred ninety-two horizontal (1:192) for suction style settling tanks.
(B) Sludge hopper. The minimum slope of the sludge hopper
side walls shall be one and seven tenths vertical to one horizontal (1.7:1) (i.e., sixty degrees (60°) above the horizontal).
(C) When used, dual sludge hoppers shall provide a minimum water depth of two feet (2') over the connecting wall that
is between hoppers.
(5) Protective and Service Facilities.
(A) Operator Protection. Safety features shall appropriately
include machinery covers, life lines, handrails on all stairways
and walkways, and slip resistant surfaces. For additional safety
follow the provisions listed in 10 CSR 20-8.140(8).
(B) Mechanical Maintenance Access. The design shall provide
for convenient and safe access to routine maintenance items
such as gear boxes, scum removal mechanism, baffles, weirs,
inlet stilling baffle areas, and effluent channels.
(C) Electrical Equipment, Fixtures, and Controls. For electrical equipment, fixtures, and controls in enclosed settling
basins and scum tanks, where hazardous concentrations of
flammable gases or vapors may accumulate, follow the provisions in 10 CSR 20-8.140(6)(B). The fixtures and controls shall be
conveniently located and safely accessible for operation and
maintenance.
AUTHORITY: section 644.026, RSMo 2016.* Original rule filed Aug.
10, 1978, effective March 11, 1979. Amended: Filed June 15, 2018,
effective Feb. 28, 2019.
*Original authority: 644.026, RSMo 1972, amended 1973, 1987, 1993.