10 CSR 26-2.043
Methods of Release Detection for Tanks
PURPOSE: This rule contains the requirements that specific underground storage tank
leak detection methods must meet.
(1) Methods of release detection for underground storage tanks (USTs) used to meet the
requirements in 10 CSR 26-2.041 must be
conducted as follows:
(A) Inventory Control. Regulated substance inventory control (or another test of
equivalent performance) must be conducted
monthly to detect a release of at least one
percent (1%) of flow through plus one hundred thirty (130) gallons on a monthly basis
in the following manner:
1. Inventory volume measurements for
regulated substance inputs, withdrawals, and
the amount still remaining in the tank are
recorded each operating day on forms provided by the department or on forms previously
approved by the department;
2. The equipment used is capable of
measuring the level of regulated substance
over the full range of the tank’s height to the
nearest one-eighth inch (1/8");
3. The regulated substance inputs are
reconciled with delivery receipts by measurement of the tank inventory volume before and
after delivery;
4. Deliveries are made through a drop
tube that extends to within one foot (1') of the
tank bottom;
5. Product dispensing is metered and
recorded within the local standards for meter
calibration or an accuracy of six (6) cubic
inches for every five (5) gallons of product
withdrawn;
6. The measurement of any water level
in the bottom of the tank is made to the nearest one-eighth inch (1/8") at least once a
month; and
7. The practices described in the
American Petroleum Institute Publication
1621, Recommended Practice for Bulk Liquid
Stock Control at Retail Outlets, revised 2001,
may be used, where applicable, as guidance
in meeting the requirements of this subsection;
(B) Statistical Inventory Reconciliation
(SIR), which is a statistical inventory analysis
method that tests for the loss of a regulated
substance. SIR must meet the following
requirements:
1. Report a quantitative result with a calculated leak rate;
2. Be able to detect a two-tenths (0.2)
gallon-per-hour leak rate from any portion of
the tank system that routinely contains a regulated substance;
3. Must be conducted for each independent tank system;
4. Be done in conjunction with inventory control that meets the requirements in 10
CSR 26-2.043(1)(A);
5. Use a threshold that does not exceed
one-half (1/2) the minimum detectible leak
rate;
6. Be conducted in accordance with the
National Work Group on Leak Detection
Evaluations listing and the manufacturer’s
requirements. To obtain copies of equipment
listings, contact the National Work Group on
Leak Detection Evaluations, www.nwglde.org;
and
7. The SIR analysis report must include
the supporting data, inventory measurements
of the regulated substance and water, delivery
data, and analysis or reporting date;
(C) Manual Tank Gauging. Manual tank
gauging must meet the following requirements:
1. Tank liquid level measurements are
taken at the beginning and ending of a period
of at least thirty-six (36) hours during which
no liquid is added to or removed from the
tank;
2. Level measurements are based on an
average of two (2) consecutive stick readings
at both the beginning and ending of the period;
3. The equipment used is capable of
measuring the level of regulated substance
over the full range of the tank’s height to the
nearest one-eighth inch (1/8");
4. A leak is suspected and subject to the
requirements of 10 CSR 26-2.050–10 CSR
26-2.053 if the variation between beginning
and ending measurements exceeds the following weekly or monthly standards:
A. Tanks of five hundred fifty- (550-)
gallon capacity or less are allowed a weekly
standard of ten (10) gallons per reading and a
monthly average of five (5) gallons per reading, with a minimum test duration of thirtysix (36) hours;
B. Five hundred fifty-one to one thousand- (551–1,000-) gallon capacity tanks are
allowed a difference of thirteen (13) gallons
per week and a monthly average of seven (7)
gallons, with a minimum test duration of thirty-six (36) hours, and when combined with a
tank tightness test in accordance with subsection (D) of this section;
C. One thousand one to two thousand- (1,001–2,000-) gallon capacity tanks
are allowed a difference of twenty-six (26)
gallons per week and a monthly average of
thirteen (13) gallons, with a minimum test
duration of thirty-six (36) hours, and when
combined with a tank tightness test in accordance with subsection (D) of this section;
D. Five hundred fifty-one to one
thousand- (551–1,000-) gallon capacity tanks
with a diameter no greater than sixty-four
inches (64") are allowed a difference of nine
(9) gallons per week and monthly average of
four (4) gallons, provided that a period of at
least forty-four (44) hours during which no
liquid is added to or removed from the tank is
allowed to pass between tank liquid level
measurements, without requiring an additional tank tightness test; and
E. Five hundred fifty-one to one thousand- (551–1,000-) gallon capacity tanks with
a diameter no greater than forty-eight inches
(48") are allowed a difference of twelve (12)
gallons per week and a monthly average of
six (6) gallons, provided that a period of at
least fifty-eight (58) hours during which no
liquid is added to or removed from the tank is
allowed to pass between tank liquid level
measurements, without requiring an additional tank tightness test; and
F. Tanks of greater than two thousand
(2,000) gallons nominal capacity may not use
this method for release detection;
(D) Tank Tightness Testing. Tank tightness
testing (or similar test) must be capable of
detecting a one-tenth- (0.1-) gallon-per-hour
leak rate from any portion of the tank that
routinely contains regulated substance while
accounting for the effects of thermal expansion or contraction of the regulated substance, vapor pockets, tank deformation,
evaporation or condensation, and the location
of the water table;
(E) Automatic Tank Gauging. Equipment
for automatic tank gauging that tests for the
loss of regulated substance and conducts
inventory control must meet the following
requirements:
1. The automatic regulated substance
level monitor test can detect a two-tenths-
(0.2-) gallon-per-hour leak rate from any
portion of the tank that routinely contains a
regulated substance;
2. The test must be performed with the
automatic tank gauging system operating in
Substance Storage Tanks
one of the following modes:
A. In-tank static testing conducted at
least once every thirty (30) days; or
B. Continuous in-tank leak detection
operating on an uninterrupted basis or operating within a process that allows the system
to gather incremental measurements to determine the leak status of the tank at least once
every thirty (30) days; and
3. Inventory control (or equivalent test)
meeting the requirements in 10 CSR 262.043(1)(A) is conducted;
(F) Vapor Monitoring. Testing or monitoring for vapors within the soil gas of the excavation zone must meet the following requirements:
1. The materials used as backfill are sufficiently porous and permeable (for example,
gravel, sand, or crushed rock) to readily
allow diffusion of vapors from releases into
the excavation area;
2. The stored regulated substance, or a
tracer compound placed in the tank system, is
sufficiently volatile (for example, gasoline) to
result in a vapor level that is detectable by the
monitoring devices located in the excavation
zone in the event of a release from the tank;
3. The measurement of vapors by the
monitoring device is not rendered inoperative
by the groundwater, rainfall, or soil moisture
or other known interferences so that a release
could go undetected for more than thirty (30)
days;
4. The level of background contamination in the excavation zone will not interfere
with the method used to detect releases from
the tank;
5. The vapor monitors are designed and
operated to detect any significant increase in
concentration above background of the regulated substance stored in the tank system, a
component(s) of that substance, or a tracer
compound placed in the tank system;
6. In the UST excavation zone, the site
is assessed to ensure compliance with the
requirements in paragraphs (1)(F)1.–4. of
this rule and to establish the number and
positioning of monitoring wells that will
detect releases within the excavation zone
from any portion of the tank that routinely
contains a regulated substance;
7. Monitoring wells are clearly marked
and secured to avoid unauthorized access and
tampering; and
8. After July 1, 2020, use a tracer chemical and the method is listed by the National
Work Group on Leak Detection Evaluations
as a tank tightness test;
(G) Groundwater Monitoring. Testing or
monitoring for liquids on the groundwater
may only be used as a release detection
method until July 1, 2020, and must meet the
following requirements:
1. The regulated substance stored is
immiscible in water and has a specific gravity
of less than one (1);
2. The groundwater is within twenty feet
(20') from the ground surface and the
hydraulic conductivity of the soil(s) between
the UST system and the monitoring wells or
devices is at least one hundredth centimeter
per second (0.01 cm/sec) (for example, the
soil should consist of gravels, coarse to medium sands, coarse silts, or other permeable
materials);
3. The slotted portion of the monitoring
well casing must be designed to prevent
migration of natural soils or filter pack into
the well and to allow entry of regulated substance on the water table into the well under
both high and low groundwater conditions;
4. Monitoring wells shall be sealed from
the ground surface to the top of the filter
pack;
5. Monitoring wells or devices shall
intercept the excavation zone or are as close
to it as is technically feasible;
6. The continuous monitoring devices or
manual methods used can detect the presence
of at least one-eighth inch (1/8") of free product on top of the groundwater in the monitoring wells;
7. The site is assessed within and immediately below the UST system excavation
zone to ensure compliance with the requirements in paragraphs (1)(G)1.–5. of this rule.
The site assessment also establishes the number and positioning of monitoring wells or
devices that will detect releases from any portion of the tank that routinely contains a regulated substance; and
8. Monitoring wells are clearly marked
and secured to avoid unauthorized access and
tampering;
(H) Interstitial Monitoring. Interstitial
monitoring must monitor between the walls
of a double-walled tank or, for piping, is
designed to detect a release from the primary
piping, including all fittings, and contain it
until it can be detected. The entire piping secondary containment must be leak tight.
Interstitial monitoring must be installed to
detect a leak from any portion of the tank that
routinely contains a regulated substance and
also meets the following requirements:
1. The groundwater, soil moisture, or
rainfall will not render the testing or sampling method used inoperative so that a
release could go undetected for more than
thirty (30) days;
2. For new UST systems installed after
July 1, 2017, interstitial monitoring must be
conducted electronically by a system with a
report-generating capability; and
3. For UST systems using continuous
vacuum, pressure, or liquid-filled methods of
interstitial monitoring, the method must be
capable of detecting a breach in both the
inner and outer walls of the tank and/or piping; and
(I) Other Methods. Any other type of
release detection method, or combination of
methods, can be used if—
1. It can detect a two-tenths- (0.2-) gallon-per-hour leak rate or a release of one
hundred fifty (150) gallons within a month
with a probability of detection of ninety-five
percent (95%) and a probability of false
alarm of five percent (5%); or
2. The department may approve another
method if the owner and operator can demonstrate that the method can detect a release as
effectively as any of the methods allowed in
subsections (1)(C)–(H) of this rule. In comparing methods, the department shall consider the size of release that the method can
detect and the frequency and reliability with
which it can be detected. If the method is
approved, the owner and operator must comply with any conditions imposed by the
department on its use to ensure the protection
of human health and the environment.
(2) Owners and operators of field-constructed
or airport hydrant fuel distribution system
tanks may not use vapor monitoring or
groundwater monitoring, described in subsections (F) and (G) of this rule as their sole
method of detection, but may use them in
conjunction with 10 CSR 26-2.046.
AUTHORITY: sections 319.105, 319.107, and
319.137, RSMo 2016.* This rule originally
filed as 10 CSR 20-10.043. Original rule filed
April 2, 1990, effective Sept. 28, 1990.
Amended: Filed Aug. 3, 1993, effective April
9, 1994. Moved and amended: Filed April
15, 2011, effective Dec. 30, 2011. Amended:
Filed Aug. 15, 2016, effective May 30, 2017.
*Original authority: 319.105, RSMo 1989; 319.107, RSMo
1989, amended 1994; and 319.137, RSMo 1989, amended
1993, 1995, 2004.