10 CSR 26-2.047
Alternative Methods of Release Detection for Bulk Underground Piping
PURPOSE: This rule contains the new
options for release detection for the previously deferred field-constructed tanks and airport hydrant fuel distribution piping systems.
(1) Owners and operators of bulk underground piping associated with any airport
hydrant fuel distribution systems and fieldconstructed tanks greater than fifty thousand
(>50,000) gallons may use one (1) or a combination of the following alternative methods
of release detection:
(A) Perform a biannual or annual bulk line
tightness test at or above operating pressure
in accordance with the table below. Bulk piping segments greater than or equal to one
hundred thousand (≥100,000) gallons not
capable of meeting the maximum three (3.0)
gallons-per-hour leak rate for the biannual
test may be tested at a leak rate up to six (6.0)
gallons-per-hour:
Substance Storage Tanks
Maximum Detectable Leak Rate Per Test Section Volume
Test Section
Volume
(Gallons)
Biannual Test Maximum
Detectable Leak Rate
(Gallons-Per-Hour)
Annual Test
Maximum Detectable
Leak Rate (GallonsPer-Hour)
< 50,000
1.0
0.5
• 50,000 to < 75,000
1.5
0.75
• 75,000 to < 100,000
2.0
1.0
• 100,000
3.0
1.5
(B) Perform vapor monitoring, with an
added tracer chemical, conducted in accordance with 10 CSR 26-2.043(1)(F), capable
of detecting a one-tenth- (0.1-) gallon-perhour leak rate at least every two (2) years;
(C) Perform inventory control, conducted
in accordance with Department of Defense
Directive 4140.25; ATA Airport Fuel Facility
Operations and Maintenance Guidance
Manual, at least every thirty (30) days that can
detect a leak equal to or less than one-half percent (0.5%) of flow-through. When using this
method, the following must also be met:
1. Perform a line tightness test in accordance with the biannual test threshold in subsection (A) of this section at least every two
(2) years; or
2. Perform vapor monitoring or groundwater monitoring in accordance with 10 CSR
26-2.043 subsection (1)(F) or (G), respectively, at least every thirty (30) days;
(D) Another method approved by the
department if the owner and operator can
demonstrate that the method can detect a
release as effectively as any of the methods
allowed in subsections (A) through (C). In
comparing methods, the department shall consider the size of release that the method can
detect and the frequency and reliability of
detection. If the method is approved, the
owner and operator must comply with any
conditions imposed by the department on its
use.
AUTHORITY: sections 319.105, 319.107, and
319.137, RSMo 2016.* Original rule filed
Aug. 15, 2016, effective May 30, 2017.
*Original authority: 319.105, RSMo 1989; 319.107, RSMo
1989, amended 1994; and 319.137, RSMo 1989, amended
1993, 1995, 2004.