19 CSR 20-3.060
Minimum Construction Standards for On-Site Sewage Disposal Systems
PURPOSE: This rule establishes minimum
construction standards for on-site sewage disposal systems. In accordance with the authority granted in section 701.040, RSMo, this
rule establishes the minimum standards and
criteria for the design, location, installation
and repair of individual on-site sewage disposal systems to promote the public health
and general welfare and to protect the surface
and ground waters of the state.
PUBLISHER’S NOTE: The secretary of state
has determined that the publication of the
entire text of the material which is incorporated by reference as a portion of this rule
would be unduly cumbersome or expensive.
Therefore, the material which is so incorporated is on file with the agency who filed this
rule, and with the Office of the Secretary of
State. Any interested person may view this
material at either agency’s headquarters or
the same will be made available at the Office
of the Secretary of State at a cost not to
exceed actual cost of copy reproduction. The
entire text of the rule is printed here. This
note refers only to the incorporated by reference material.
(1) General.
(A) Definitions. Definitions as set forth in
Chapter 701, RSMo, On-Site Sewage
Disposal Law shall apply to those terms when
used in this rule unless the context clearly
requires otherwise or as noted in this subsection. For the purposes of these standards, certain terms or words used here shall be interpreted as follows. The word shall is mandatory and the words should and may are permissive. All distances, unless otherwise specified, shall be measured horizontally:
1. Administrative authority—The governing body which may include, but is not
limited to, county health departments, planning and zoning commissions, county building departments, county public works department, sewer districts, municipalities and the
Missouri Department of Health which has, as
authorized by statute, charter or other form of
enabling authority, adopted these standards
for individual on-site sewage disposal systems;
2. Aeration unit—Any sewage tank
which utilizes the principle of oxidation in the
decomposition of sewage by the introduction
of air into the sewage;
3. Alluvium—Soil parent material
which was transported and deposited in a
running water setting;
4. Alternative—An individual sewage
disposal system employing methods and
devices as presented in section (6) of this
rule;
5. Approved—Considered acceptable by
the administrative authority;
6. Baffle—A device installed in a septic
tank for proper operation of the tank and to
provide maximum retention of solids. This
includes vented sanitary tees and submerged
pipes in addition to those devices normally
called baffles;
7. Bedrock—That layer of geologic
material which is consolidated;
8. Bedroom—Any room within a
dwelling that might reasonably be used as a
sleeping room. The number of bedrooms in a
residence as given by an appraiser will be
used in determining volumes in the sizing of
on-site sewage disposal systems;
9. Black water—Liquid-carried waste
from a dwelling or other establishment,
which contains organic wastes, including excreta or other body wastes, blood or other
body fluids, and garbage;
10. Building sewer—That part of the
drainage system which extends from the end
of the building drain and conveys its discharge to an on-site sewage disposal system;
11. Capacity—The liquid volume of a
sewage tank using inside dimensions below
the outlet;
12. Color—The moist color of the soil
based on the Munsell soil color system;
13. Distribution pipes—Perforated rigid
pipes that are used to distribute sewage tank
effluent in a soil treatment system;
14. Dosing chamber (or pump pit or wet
well)—A tank or separate compartment following the sewage tank which serves as a
reservoir for the dosing device;
15. Dosing device—A pump, siphon or
other device that discharges sewage tank
effluent from the dosing chamber to the soil
treatment system;
16. Dwelling—Any building or place
used or intended to be used by human occupants as a residential unit(s);
17. Effluent—The liquid discharge of a
septic tank or other sewage treatment device;
18. Gravelless system—An absorption
system recognized by the administrative
authority as an acceptable method of subsurface disposal of sewage without the required
use of gravel. The following are examples:
A. Large diameter, eight inch (8")
and ten inch (10") corrugated, perforated
plastic pipe, wrapped in a sheath of spunbonded filter wrap;
B. Chamber system; and
C. Drip irrigation;
19. Gray water—Liquid waste, specifically excluding toilet, hazardous, culinary
and oily wastes, from a dwelling or other
establishment which is produced by bathing,
laundry or discharges from floor drains;
20. Grease trap—A device designed and
installed so as to separate and retain oils and
fats from normal wastes while permitting
normal sewage or wastes to discharge into the
drainage system by gravity;
21. Ground absorption sewage treatment
and disposal system—A system that utilizes
the soil for the subsurface disposal of partially treated or treated sewage effluent. The following are examples:
A. Chamber system—A system that
uses an open bottom structure which forms
an underground chamber over the soil's infiltrative surface. The wastewater is discharged
into the chamber through a central weir,
trough or splash plate and is allowed to flow
over the infiltrative surface in any direction;
B. Conventional soil absorption system—A system that distributes effluent by
gravity flow from the septic or other treatment tank and applies effluent to the soil
through the use of a seepage trench or bed;
C. Dosing soil absorption system—A
system that distributes effluent by a pump or
AND SENIOR SERVICES
Public Health
automatic siphon to elevate or distribute
effluent to the soil through the use of a seepage trench or bed;
D. Drip soil absorption system—An
experimental system that distributes effluent
through drip lines in a grid pattern (also
known as trickle irrigation); and
E. Pressure distribution system—A
soil absorption system that distributes effluent by a pump and smaller diameter distribution piping with small diameter perforations
to distribute effluent;
22. Hazardous waste—Any waste or
combination of wastes, as determined by the
Hazardous Waste Commission by rules,
which, because of its quantity, concentration,
or physical, chemical or infectious characteristics, may cause or significantly contribute to an increase in mortality or an
increase in serious irreversible, or incapacitating reversible, illness, or pose a present or
potential threat to the health of humans or the
environment;
23. High ground water—Zones of soil
saturation which include: perched water
tables, shallow regional groundwater tables
or aquifers, or zones that are seasonally, periodically or permanently saturated;
24. High-water level—The highest
known flood water elevation of any lake,
stream, pond or flowage or the regional flood
elevation established by a state or federal
agency;
25. Holding tank—A watertight tank for
temporary storage of sewage until it can be
transported to a point of approved treatment
and disposal;
26. Horizon—A layer of soil, approximately parallel to the surface, that has distinct characteristics relative to adjacent layers;
27. Individual sewage disposal system—
A sewage disposal system, or part of a system, serving a dwelling(s) or other establishment(s), which utilizes subsurface soil treatment and disposal;
28. Intermittent sand filters—Intermittent sand filters are beds of granular materials twenty-four to thirty-six inches (24–36")
thick underlain by graded gravel and collecting pipe. Waste water is applied intermittently to the surface of the bed through distribution pipes or troughs and the bed is underdrained to collect and discharge the final
effluent. Uniform distribution is normally
obtained by dosing so as to flood the entire
surface of the bed. Filters may be designed to
provide free access (open filters) or may be
buried in the ground (buried filters or subsurface sand filters);
29. Matrix color—The dominant color
of a soil material;
30. Mottling—Spots or splotches of
color interspersed in the dominant (or matrix
color) of a soil material. Mottles may be of a
wide variety of colors;
31. Mound system—A system where the
soil treatment area is built above the ground
to overcome limits imposed by proximity to
water table or bedrock or by rapidly or slowly permeable soils;
32. Non-ground absorption sewage disposal system—A facility for waste treatment
designed not to discharge to the soil, land
surface, or surface waters, including, but not
limited to, incinerating toilets, mechanical
toilets, composting toilets and recycling systems;
33. Other establishment—Any public or
private structure other than a dwelling which
generates sewage;
34. Pan—A soil horizon compacted,
hard or very high in clay content. These horizons are usually very slowly permeable.
Common pans in Missouri are claypans and
fragipans;
35. Perched water table—A saturated
zone above and separated from the water
table by a horizon which is unsaturated;
36. Percolation rate—The time rate of
drop of a water surface in a test hole as specified in subsection (2)(C) of this rule and
expressed in minutes per inch;
37. Permeability—The ease with which
liquids and gases move within the soil or
rock;
38. Plastic limit—A soil moisture content below which the soil may be manipulated for purposes of installing a soil treatment
system and above which manipulation will
cause compaction, puddling and smearing, as
determined by the administrative authority.
This is not to be confused with plastic limit
as used or defined in the Unified Soil
Classification System;
39. Privy—An outhouse or structure
used for receiving human excrement in a container or vault beneath the structure;
40. Registered geologist—A person who
meets the requirements of Chapter 256,
RSMo;
41. Restrictive horizon—A soil horizon
that is capable of perching groundwater or
sewage effluent and that is brittle and strongly compacted or strongly cemented with iron,
aluminum, silica, organic matter or other
compounds. Restrictive horizons may occur
as fragipans, iron pans or organic pans and
are recognized by their resistance in excavation or in use of a soil auger;
42. Rock fragments—The percentage by
volume of rock fragments in a soil that are
greater than two millimeters (2 mm) in diameter or retained on a No. 10 sieve which may
include, but is not restricted to, chert, sandstone, shale, limestone or dolomite;
43. Sanitarian—A person registered
either as a sanitarian or environmental health
professional by the National Environmental
Health Association or the Missouri Board of
Certification for Environmental Health Professionals or employed as a sanitarian or
environmental health professional by the
administrative authority;
44. Seepage bed—An excavated area
larger than three feet (3') in width which contains a bedding of aggregate and has more
than one (1) distribution line;
45. Seepage trench—An area excavated
one to three feet (1–3') in width which contains a bedding of aggregate and a single distribution line;
46. Septage—Those solids and liquids
removed during periodic maintenance of a
septic or aeration unit tank or those solids
and liquids removed from a holding tank;
47. Septic tank—Any watertight, covered receptacle designed and constructed to
receive the discharge of sewage from a building sewer, separate solids from liquid, digest
organic matter, store liquids through a period
of detention and allow the clarified liquids to
discharge to a soil treatment system;
48. Setback—A separation distance
measured horizontally;
49. Severe geological limitations—Sitespecific geologic conditions which are indicative of rapid recharge of an aquifer and likely groundwater contamination. Locations
with significant groundwater contamination
potential should be investigated by a registered geologist to determine if the site has
severe geological limitations. Standardized
criteria for determination of severe geological
limitations are available in the form
Assessment of Individual On-Site Waste
Disposal Geological Limitations from the
Department of Natural Resources, Division
of Geology and Land Survey;
50. Sewage—Any water-carried domestic waste, exclusive of footings and roof
drainage. Domestic waste includes, but is not
limited to, liquid waste produced by bathing,
laundry, culinary operations, liquid wastes
from toilets and floor drains and specifically
excludes animal waste and commercial process water. Also known as wastewater;
51. Sewage flow—Flow as determined
by measurement of actual water use or, if
actual measurements are unavailable, as estimated by the best available data provided by
Table 2A in subsection (1)(E) of this rule;
52. Sewage tank—A watertight tank
used in the treatment of sewage which
includes, but is not limited to, septic tanks
and aeration units;
AND SENIOR SERVICES
Public Health
53. Sewage tank effluent—That liquid
which flows from a septic tank or aeration
unit under normal operation;
54. Significant groundwater contamination potential—Any condition which would
cause or indicate rapid recharge of an aquifer.
This includes, but is not limited to, the following conditions or parameters: a water
sample from an on-site well which exceeds
drinking water standards with respect to fecal
coliform; a hydrologic connection is established between the on-site waste disposal system and any well; a disposal field to be
placed in Class V soils or soils with a percolation rate less than ten minutes per inch (10
min./in.); a disposal field within one hundred
feet (100') of the topographic drainage of a
sinkhole; or a sewage tank with fifty feet
(50') of the topographic drainage of a sinkhole;
55. Sinkhole—A land surface depression
that is hydraulically connected with a subterranean passage developed by a solution or
collapse into the underlying bedrock, or
both;
56. Site—The area bounded by the
dimensions required for the proper location
of the soil treatment system;
57. Slope—The ratio of vertical rise or
fall to horizontal distance;
58. Soil—The naturally occurring,
unconsolidated mineral or organic material of
the land surface developed from rock or other
parent material and consisting of sand, silt
and clay-sized particles and variable amount
of organic materials;
59. Soil characteristics, limiting—Those
soil characteristics which preclude the installation of a standard system, including, but not
limited to, evidence of water table or bedrock
closer than three feet (3') to the ground surface and percolation rates slower than one
hundred twenty minutes per inch (120
min./in.);
60. Soil saturation—The condition that
occurs when all the pores in a soil are filled
with water;
61. Soil scientist—An individual who
has a minimum of fifteen (15) semester credit hours of soils course work including a minimum of three (3) hours in the area of soil
morphology and interpretations, and has a
minimum of two (2) years of field experience;
62. Soil textural classification—Soil particle sizes or textures specified in this rule
refer to the soil textural classification in the
Soil Survey Manual Handbook No. 18,
United States Department of Agriculture,
1993;
63. Soil treatment area—That area of
trench or bed bottom which is in direct contact with the trench rock of the soil treatment
system;
64. Soil treatment system—A system
where sewage tank effluent is treated and disposed of below ground surface by filtration
and percolation through the soil. It includes
those systems commonly known as seepage
bed, trench, drainfield, disposal field and
includes mound and low pressure pipe systems;
65. Standard system—An individual
sewage disposal system employing a building
sewer, sewage tank and the soil treatment system commonly known as seepage bed or
trenches, drainfield or leachfield;
66. Toilet waste—Fecal matter, urine,
toilet paper and any water used for flushing;
67. Trench rock—Clean rock, washed
creek gravel or similar insoluble, durable and
decay-resistant material free from dust, sand,
silt or clay. The size shall range from one
inch to two and one-half inches (1"–2 1/2").
If limestone, dolomite or other crushed white
rock is used, it shall be washed and be a minimum size of one and one-half inches (1
1/2");
68. Valve box—Any device which can
stop sewage tank effluent from flowing to a
portion of the soil treatment area. This
includes, but is not limited to, caps or plugs
on distribution or drop box outlets, divider
boards, butterfly valves, gate valves or other
mechanisms;
69. Very slowly permeable—Soils,
bedrock and soil horizon or layer having a
vertical permeability less than one inch (1")
in twenty-four (24) hours;
70. Wastewater—same as sewage as
defined in paragraph (1)(A)50. of this rule;
71. Wastewater stabilization pond—A
sealed earthen basin which uses the natural
unaided biological processes to stabilize
wastewater (also known as a sewage lagoon);
72. Water table—The highest elevation
in the soil or rock where all voids are filled
with water, as evidenced by presence of water
or soil mottling or other information. This
includes perched water tables or perched
zones of saturation; and
73. Watertight—Constructed so that no
water can get in or out below the level of the
outlet.
(B) Applicability. For this rule, on-site
wastewater treatment and disposal system
means all equipment and devices necessary
for proper conduction, collection, storage,
treatment and disposal of wastewater from a
dwelling or other facility producing sewage of
three thousand gallons (3000 gals.) or less
per day. Included within the scope of this rule
are building sewers, septic tanks, subsurface
absorption systems, mound systems, intermittent sand filters, gravelless systems, aeration
unit wastewater treatment systems and single
family wastewater stabilization ponds. Commercial or industrial facilities and developers
of subdivisions must first contact the Department of Natural Resources concerning compliance with the Missouri Clean Water Law
and Regulations before applying for any
approvals or permits under this rule.
(C) Responsibilities.
1. The design, construction, operation
and maintenance of sewage treatment and disposal systems, whether septic tank systems,
privies or alternative systems, shall be the
responsibility of the designer, owner, developer, installer or user of the system.
2. Actions of representatives of the
administrative authority engaged in the evaluation and determination of measures required
to effect compliance with the provisions of
this rule shall in no way be taken as a guarantee or warranty that sewage treatment and
disposal systems approved and permitted will
function in a satisfactory manner for any
given period of time. Due to the development
of clogging mats, which adversely impact the
life expectancy of normally functioning
ground absorption sewage treatment and disposal systems and variables influencing system function which are beyond the scope of
this rule, no guarantee or warranty is implied
or given that a sewage treatment and disposal
system will function in a satisfactory manner
for any specific period of time.
3. Prior to the issuance of a permit to
install or effect major repair of an on-site
sewage disposal system as regulated by
Chapter 701, RSMo, plans and specifications
shall be required for review. Approval by the
administrative authority shall be required
for—
A. Plans for absorption field showing
the following:
(I) Field locations with slope(s)
indicated or with contour lines based on field
measurement. If field areas are essentially
flat or of uniform grade, spot elevations will
be required for alternate systems;
(II) Field layout, length, spacing,
connection, pipe sizes and cleanout details,
invert elevations of flow distribution devices
and laterals, valves and appurtenances;
(III) Trench plan and profile drawings and flow distribution device details;
(IV) Location and design of associated surface and ground water drainage systems;
(V) Name, address and telephone
number of the person(s) drafting the plans;
and
(VI)
Any
other
information
required by the administrative authority; and
B. Alternative systems whether or not
specifically described in this rule.
4. The entire sanitary sewage system
shall be on property owned or controlled by
the person owning or controlling the system.
Necessary easements shall be obtained permitting the use and unlimited access for
inspection and maintenance of all portions of
the system to which the owner and operator
do not hold undisputed title. Easements shall
remain valid as long as the system is required
and shall be recorded with the county
recorder of deeds.
(D) Minimum Set-Back Distances. All onsite wastewater treatment and disposal systems shall be located in accordance with the
distances shown in Table 1.
AND SENIOR SERVICES
Public Health
(E) Sewage Flow Rates. Table 2A or 2B
shall be used to determine the minimum
design daily flow of sewage required in calculating the design volume of sanitary sewage
systems to serve selected types of establishments. The minimum design volume of
sewage from any establishment shall be one
hundred gallons (100 gals.) per day. Design
of sewage treatment and disposal systems for
establishments not identified in this rule shall
be determined using available flow data,
water-using fixtures, occupancy or operation
patterns and other measured data.
1. Volume determination. In determining the volume of sewage from single family
dwellings, the minimum flow rate shall be
one hundred twenty gallons (120 gals.) per
day per bedroom. The minimum volume of
sewage from each single family dwelling shall
be two hundred forty gallons (240 gals.) per
day. When the occupancy of a single family
dwelling exceeds two (2) persons per bedroom, the volume of sewage shall be determined by the maximum occupancy at a rate of
sixty gallons (60 gals.) per person per day.
2. Other establishments. For establishments or housing developments other than a
single family residence, either Table 2A shall
be used to estimate the sewage flow rate or
actual measured flow rate for existing systems
may be used. Values for estimated sewage
flow for establishments having food service
operations shall be increased by a factor of
one and one-half (1.5) to compensate for the
high organic strength. Grease traps shall be
required at food service facilities, meat markets and other places of business where the
accumulation of grease or oils can cause premature failure of a soil absorption system.
The following design criteria shall be met:
A. The grease trap shall conform to
Plumbing & Drainage Institute Standard PDIG101 or equivalent;
B. The grease trap shall be plumbed
to receive all wastes associated with food
handling and no toilet wastes;
C. The grease trap liquid capacity
shall be sufficient to provide for at least five
gallons (5 gals.) of storage per meal served
per day, at least two-thirds (2/3) of the
required septic tank liquid capacity, or a
capacity as determined in accordance with
the following:
LC = D × GL × ST × HR/2 × LF
where LC = grease trap liquid capacity
(gallons)
D
= number of seats in dining area
GL = gallons of wastewater per
meal
(1.5 single-service; 2.5 full-
service)
ST = storage capacity factor = 2.5
HR = number of hours open
LF = loading factor (1.25 interstate
highway
= 1.0 other highways and recreational areas
= 0.8 secondary roads);
D. Two (2) or more chambers must be
provided, with total length-to-width ratio at
least two to one (2:1). Chamber opening and
outlet sanitary tee must extend down at least
fifty percent (50%) of the liquid depth;
E. Access manholes, with a minimum
diameter of twenty-four inches (24”), shall be
provided over each chamber and sanitary tee.
The access manholes shall extend at least to
finished grade and be designed and maintained to prevent surface water infiltration.
The manholes shall also have readily removable covers to facilitate inspection and grease
removal; and
F. Where it has been demonstrated
that specially designed grease interceptors
will provide improved performance, the
grease trap liquid capacity may be reduced by
up to fifty percent (50%).
AND SENIOR SERVICES
Public Health
AND SENIOR SERVICES
Public Health
3. Population to be served. Unless satisfactory justification can be given for using
lower per-unit occupancies, the figures in
Table 2B shall be used in determining the
population for which to design the sewage
works.
4. Reduction in sewage flow. Reductions
in design sewage flow rates may be allowed
by the administrative authority on a case-bycase basis depending upon water conservation
plans. Sewage flow rates may be reduced up
to forty percent (40%) for gray water systems
where the toilet wastes are discharged to a
holding tank and disposed of off-site or
where waterless toilets are utilized.
(2) Site Evaluation.
(A) All proposed sites for on-site sewage
treatment and disposal systems shall be evaluated for the following:
1. Either percolation tests or soil conditions, properties and permeability as determined by a soil morphology examination; a
profile pit shall be required for all new installations in order to conduct soil morphology
examination;
2. Slope;
3. The existence of lowlands, local surface depressions, rock outcrops and sinkholes;
4. All required setback distances as
required in subsection (1)(D) of this rule;
5. Surface water flooding probability
and depth to water table;
6. Location of easements and underground utilities;
7. Amount of available area for the
installation of the system and an area for
replacement;
8. Location of homesite or dwelling as
well as management of surface runoff water
from those buildings;
9. Any other cultural feature, such as
roads, streets and the like in the surrounding
areas which influences surface and subterrainal flow of water on or near the proposed
site; and
10. Any significant groundwater contamination potential.
(B) Preliminary Soils Information. During
a site evaluation reference may be made of
county soil survey reports which are available
from the United States Department of
Agriculture (USDA) Natural Resources
Conservation Service (NRCS) for a majority
of the counties in Missouri. NRCS soil survey reports should not be used as sole final
determination for a specific site, but only as
a guide to which soils are expected in a given
area.
(C) Soil Permeability and Soil Percolation.
Soil permeability and soil percolation are two
(2) different soil features with no direct correlation.
1. Soil permeability is that quality that
enables soil to transmit water or air. It can be
measured quantitatively in terms of rate of
flow of water through a unit cross section of
saturated soil in unit time under specified
temperature and hydraulic conditions.
2. Soil percolation rate is based on a
standard method which includes a twentyfour (24)-hour presoak in a six to eight inch
(6–8") diameter hole to the depth of the proposed absorption field. After the presoak,
water is poured into the hole to a level of
eight inches (8") above the bottom. The drop
in water level is then measured at thirty (30)-
minute intervals until a stabilized rate is
obtained. Results are recorded as minutes per
inch (min./in.) for the water level to drop.
(D) Procedures for Percolation Tests and
Profile Holes. Two (2) types of site evaluations are acceptable. Each type depends upon
the technical expertise of the individual conducting the evaluations. When percolation
tests are slower than sixty minutes per inch
(60 min./in.), the design must be drafted and
signed by a registered engineer unless site
suitability and system sizing has been determined by soil evaluation in accordance with
section (7) of this rule. This would apply to
all systems except for lagoons or other systems that do not use the soil for treatment.
When percolation tests are slower than one
hundred and twenty minutes per inch (120
min./in.), on-site sewage disposal systems
shall not be permitted, except for lagoons or
other systems designed in accordance with
sections (6) and (7) of this rule. The administrative authority will determine which
method(s) is to be used. The types of site
evaluations are described as follows:
1. Percolation tests only. This type of
site evaluation is where site suitability and
sizing of the soil absorption system is made
by percolation tests and there is no other evaluation of soil characteristics. This type of site
evaluation can be used only for siting and sizing standard systems in areas which are not
classified as having significant groundwater
contamination potential. When using this
type of evaluation, only percolation rates
between ten minutes and sixty minutes per
inch (10–60 min./in.) will be acceptable.
Percolation tests shall be conducted by an
engineer, sanitarian, registered geologist, soil
scientist or a person who has been trained
and certified by the Department of Health in
accordance with section 701.040(2), RSMo.
These tests shall be performed in accordance
with the following procedure:
A. A minimum of four (4) percolation
test holes are required with three (3) of the
holes around the periphery within the proposed soil absorption site and one (1) in the
middle of the proposed soil absorption site;
B. Each test hole shall be six to eight
inches (6–8") in diameter, have vertical side
walls and be bored or dug to a depth of the
bottom of the proposed soil absorption system;
C. The bottom and sides of the hole
shall be carefully scratched to remove any
smearing and to provide a natural soil surface
into which water may penetrate. All loose
material shall be removed from the bottom of
the test hole and two inches (2") of one-fourth
to three-fourths inch (1/4–3/4") washed gravel shall be added to protect the bottom from
scouring;
D. The hole shall be carefully filled
with clear water to a minimum of twelve
inches (12") over the soil bottom of the test
hole and maintained for no less than four (4)
hours. The hole shall then be allowed to swell
for at least twenty-four (24) hours. In sandy
soils, the saturation and swelling procedure
shall not be required and the test may proceed
if one (1) filling of the hole has seeped away
in less than ten (10) minutes;
E. In sandy soils, the water depth
shall be adjusted to eight inches (8") over the
soil bottom of the test hole. From a fixed reference point, the drop in water level shall be
measured in inches to the nearest one-eighth
inch (1/8") at approximately ten (10)-minute
intervals. A measurement can also be made
by determining the time it takes for the water
level to drop one inch (1") from an eight-inch
(8") reference point. If eight inches (8") of
water seeps away in less than ten (10) minutes, a shorter interval between measurements shall be used but in no case shall the
water depth exceed eight inches (8"). The test
shall continue until three (3) consecutive percolation rate measurements vary by a range of
no more than ten percent (10%);
F. In other soils, the water depth shall
be adjusted to eight inches (8") over the soil
at the bottom of the test hole. From a fixed
reference point, the drop in water level shall
be measured in inches to the nearest oneeighth inch (1/8") at approximately thirty
(30)-minute intervals, refilling between measurements to maintain an eight-inch (8")
starting head. The test shall continue until
three (3) consecutive percolation rate measurements vary by a range of no more than
ten percent (10%). The percolation rate can
also be made by observing the time it takes
the water level to drop one inch (1") from an
eight-inch (8") reference point if a constant
water depth of at least eight inches (8") has
been maintained for at least four (4) hours
prior to the measurement;
G. Percolation rate shall be calculated
as follows:
(I) The time interval shall be divided by the drop in water level to obtain the
percolation rate in minutes per inch;
(II) The slowest percolation rate of
the four (4) tests shall be used to determine
the final soil treatment system design. Where
the slowest percolation rate varies by more
than twenty minutes per inch (20 min./in.)
from the other tests, a detailed soils morphology evaluation must be conducted to justify a design based upon the average percolation rate; and
(III) For reporting the percolation
rate, worksheets showing all calculations and
measurements shall be submitted; and
H. Depth to bedrock or other restrictive layer shall be determined in areas where
it is known that bedrock may exist at depths
less than ten feet (10'); and
2. Soil morphology. This evaluation
shall be conducted by a soil scientist unless
an engineer, registered geologist or sanitarian
has had special training and field experience
to determine the required soil characteristics.
This type of evaluation is recommended for
sites that are classified as having significant
groundwater contamination potential, severe
geological limitations or severe limitations
relating to restrictive layers. Section (7) of
this rule contains criteria for this type of site
evaluation. Since this type of soil analysis
pertains to the factors that relate directly to
permeability, no percolation test is required,
however the administrative authority may
retain the option of requiring percolation tests
for additional information in determining site
suitability.
(3) Building Sewers. Building sewers used to
conduct wastewater from a building to an onsite wastewater treatment and disposal system
shall be constructed of material meeting the
minimum requirements of American Society
for Testing and Materials (ASTM) Standards
and listed by that agency for such use.
Suitable materials meeting ASTM standards
include: Acrylonitrile, butadiene styrene
(ABS), cast iron pipe, concrete pipe, copper
or copper-alloy tubing, polyvinyl chloride
(PVC) or vitrified clay pipe. Although listed
by ASTM, asbestos cement pipe will not be
accepted due to potential health hazards to
installers. Building sewer specifications are
as follows:
(A) Size. Building sewers shall not be less
than four inches (4") in diameter;
(B) Slope. Building sewers shall be laid to
the following minimum slope:
1. Four-inch (4") sewer—twelve inches
(12") per one hundred feet (100'); and
2. Six-inch (6") sewer—eight inches
(8") per one hundred feet (100');
(C) Cleanouts. A cleanout shall be provided at least every one hundred feet (100') and
at every change in direction or slope if the
change exceeds forty-five degrees (45°). A
cleanout should be provided between house
and tank; and
(D) Connection to Sewage Tank. The pipe
going into and out of the sewage tank shall be
schedule 40 PVC or cast iron and shall
extend a minimum of two feet (2') beyond the
hole of excavation for the sewage tank.
(4) Sewage Tanks.
(A) General. All liquid waste and washwater with the following exceptions shall discharge into the sewage tank. Roof, garage,
footing, surface water, drainage, cooling
water discharges and hazardous wastes shall
be excluded from the sewage tank. Backwash
from water softeners and swimming pool filtration systems may be excluded from the
sewage tank. In such event of excluding
swimming pool filter backwash, the Department of Natural Resources shall be contacted
for applicability of a discharge permit. All
sewage tank effluent shall be discharged to a
soil absorption system that is designed to
retain the effluent upon the property from
which it originated. All tanks regardless of
material or method of construction shall—
1. Be watertight and designed and constructed to withstand all lateral earth pressures under saturated soil conditions with the
tank empty;
2. Be designed and constructed to withstand a minimum of two feet (2') of saturated
earth cover above the tank top; and
3. Not be subject to excessive corrosion
or decay. Metal sewage tanks shall not be
used unless specifically allowed by the
administrative authority on a case-by-case
basis. The tank shall be thoroughly coated
inside and out with a bituminous or other
suitable coating. Any damage to the bituminous coating shall be repaired by recoating.
Additionally, plastic sanitary tees shall be
used for the inlet and outlet for the sewage
tank. The administrative authority shall use
Table 3 regarding minimum gauge thickness
for metal sewage tanks.
AND SENIOR SERVICES
Public Health
(B) Septic Tanks. Septic tanks, regardless
of material or method of construction, shall
conform to the following criteria:
1. The liquid depth of any septic tank or
its compartment shall be not less than thirtysix inches (36"). A liquid depth greater than
six and one-half feet (6 1/2') shall not be considered in determining tank capacity;
2. No tank or compartment shall have an
inside horizontal dimension less than twentyfour inches (24");
3. Inlet and outlet connections of the
tank shall be protected by baffles or sanitary
tees as defined in paragraph (4)(B)6. of this
rule;
4. The space in the tank between the liquid surface and the top of the inlet and outlet
baffles shall not be less than twenty percent
(20%) of the total required capacity, except
that in horizontal cylindrical tanks, this space
shall be not less than fifteen percent (15%) of
the total required liquid capacity;
5. Inlet and outlet baffles shall be constructed of acid-resistant concrete, acid-resistant fiberglass or plastic;
6. Sanitary tees shall be affixed to the
inlet or outlet pipes with a permanent waterproof adhesive. Baffles shall be integrally
cast with the tank, affixed with a permanent
waterproof adhesive or with stainless steel
connectors top and bottom;
7. The inlet baffle shall extend at least
six inches (6") but no more than twenty percent (20%) of the total liquid depth below the
liquid surface and at least one inch (1") above
the crown of the inlet sewer;
8. The outlet baffle and the baffles
between compartments shall extend below the
liquid surface a distance equal to forty percent (40%) of the liquid depth, except that the
penetration of the indicated baffles or sanitary tees for horizontal cylindrical tanks shall
be thirty-five percent (35%) of the total liquid depth. They also shall extend above the
liquid surface as required in paragraph
(4)(B)4. of this rule. In no case shall they
extend less than six inches (6") above the liquid surface;
9. There shall be at least one inch (1")
between the underside of the top of the tank
and the highest point of the inlet and outlet
devices;
10. The inlet shall be not less than three
inches (3") above the outlet;
11. The inlet and outlet shall be located
opposite each other along the axis of maximum dimension. The horizontal distance
between the nearest points of the inlet and
outlet devices shall be at least four feet (4');
12. Sanitary tees shall be at least four
inches (4") in diameter. Inlet baffles shall be
no less than six inches (6") or no more than
twelve inches (12") measured from the end of
the inlet pipe to the nearest point on the baffle. Outlet baffles shall be six inches (6")
measured from beginning of the outlet pipe to
the nearest point on the baffle;
13. Access to the septic tank shall be as
follows:
A. Manholes. Access shall be provided over both the inlet and outlet devices and
to each tank compartment by means of either
a removable cover or a manhole. Where the
top of the tank is located more than eighteen
inches (18") below the finished grade, manholes and inspection holes shall extend to
approximately eight inches (8") below the
finished grade. The extension can be made
using riser of approved material and fitted
with tight covers of heavy metal or concrete.
Proper attention must be given to the accident
hazard involved when manholes are extended
close to the ground surface. Manhole risers
are not required when the top of the tank is
within eighteen inches (18") of final grade.
All manhole openings must be provided with
a substantial, fitted, water-tight cover of concrete, cast iron or other approved material.
All manhole covers which terminate below
grade shall be covered with at least six inches (6") of earth. Manhole covers which terminate above grade shall have either an effective locking device or otherwise be adequately sealed in a manner to prevent accidental
access; and
B. A six-inch (6") inspection port
shall be provided over the inlet and outlet baffles of each tank and terminate at or above
grade. An inspection port shall not be used as
a pumpout access. A manhole cover at or
above grade may also serve in place of
inspection ports;
14. Compartmentation of single tanks
shall be in accordance with the following:
A. Septic tanks larger than fifteen
hundred gallons (1500 gals.) and fabricated
as a single unit shall be divided into two (2)
or more compartments;
B. When a septic tank is divided into
two (2) compartments, not less than one- half
(1/2), nor more than two-thirds (2/3), of the
total volume shall be in the first compartment;
C. When a septic tank is divided into
three (3) or more compartments, one-half
(1/2) of the total volume shall be in the first
compartment and the other half equally
divided in the other compartments;
D. Connections between compartments shall be baffled so as to obtain effective retention of scum and sludge. The submergence of the inlet and outlet baffles of
each compartment shall be as specified in
paragraphs (4)(B)7. and 8. of this rule;
E. Adequate venting shall be provided
between compartments by baffles or by an
opening of at least fifty (50) square inches
near the top of the compartment wall; and
F. Adequate access to each compartment shall be provided by one (1) or more
manholes with a minimum opening twenty
inches (20") square or in diameter and located within six feet (6') of all walls of the tank;
15. The use of multiple tanks shall conform with the following:
A. Where more than one (1) tank is
used to obtain the required liquid volume, the
tanks shall be connected in series;
B. Each tank shall comply with all
other provisions of this section;
C. No more than three (3) tanks in
series can be used to obtain the required liquid volume; and
D. The first tank shall be no smaller
than any subsequent tanks in series;
16. The liquid capacity of a septic tank
serving a dwelling shall be based upon the
number of bedrooms contemplated in the
dwelling served and shall be at least as large
as the capacities given in Table 4.
Table 4—Dwelling Septic Tank Capacity*
Number
of
Minimum Liquid
Bedrooms
Capacity
(gallons)
1–3
1000
4
1250
5
1500
*These figures provide for use of
garbage grinders, automatic clothes
washers and other household appliances. Garbage grinders are not
recommended due to the introduction of fats and other high organic
loads.
A. For six (6) or more bedrooms, the
septic tank shall be sized on the basis similar
to an establishment. See paragraph (4)(B)17.
of this rule.
B. No tank shall be designed to retain
less than two (2) days’, forty-eight (48)
hours’ flow; and
17. Individual residences with more
than five (5) bedrooms, multiple-family residences, individual septic tank systems serving
two (2) or more residences or any place of
business or public assembly where the design
sewage flow is greater than one thousand gallons per day (1000 gpd), the liquid capacity
of the septic tank shall be designed in accordance with the following:
V = 1.5Q + 500
where V = the liquid capacity of the sep
tic tank and
Q = the design daily sewage flow.
The minimum liquid capacity of a septic tank
serving two (2) or more residences shall be
fifteen hundred gallons (1500 gals.).
(C) Location. Location of the sewage tank
shall include the following:
1. The sewage tank shall be placed so
that it is accessible for the removal of liquids
and accumulated solids;
2. The sewage tank shall be placed on
firm and settled soil capable of bearing the
weight of the tank and its contents; and
3. The sewage tanks shall be set back as
specified in subsection (1)(D) of this rule.
(D) Solids Removal. The owner of any septic tank or his/her agent shall regularly
inspect and arrange for the removal and sanitary disposal of septage from the tank whenever the top of the sludge layer is less than
twelve inches (12") below the bottom of the
outlet baffle or whenever the bottom of the
scum layer is less than three inches (3")
above the bottom of the outlet baffle. Yearly
inspections of septic tanks are recommended
and tanks shall be pumped whenever the bottom of the scum layer is within three inches
(3") of the bottom of the outlet device or the
sludge level is within eight inches (8") of the
bottom of the outlet device.
(E) Aeration Units. An aeration unit
wastewater treatment plant utilizes the principle of oxidation in the decomposition of
sewage by the introduction of air into the
sewage. An aeration unit may be used as the
primary treatment unit instead of a septic
tank except where special local conditions
may limit their use. All aeration unit type
treatment systems shall comply with the general requirements for sewage tanks set forth in
subsection (4)(A) of this rule and with the
following:
1. Limitations. Special conditions where
aeration units should not be used may
include, but not be limited to, the following:
A. Where intermittent use (interruptions allowing more than five (5) days without continuous flow) will adversely affect the
functioning of the plant; and
B. Where local ordinances restrict
their use;
2. General. The aeration unit shall be
located where it is readily accessible for
inspection and maintenance. Set-back distances for aeration units shall be in accordance with subsection (1)(D) of this rule;
3. Design. All aeration units shall comply with National Sanitation Foundation
Standard No. 40 or as required by the administrative authority. In addition, all aeration
unit treatment plants shall comply with the
requirements stipulated in this section. The
aeration unit shall have a minimum treatment
capacity of one hundred twenty gallons per
bedroom per day (120 gals./pbd) or five hundred gallons (500 gals.), whichever is
greater;
4. Effluent disposal. Effluent from an
aeration unit shall be discharged into a soil
absorption system or other final treatment
system in accordance with section (6) of this
rule. No reductions in the area of soil absorption systems or other final treatment systems
shall be permitted because of the use of an
aeration unit instead of a septic tank; and
5. Operation and maintenance. Where
aeration units are used in institutional or
administrative arrangements to control their
use, operation and maintenance are recommended. Aeration units should be inspected
at least one (1) time each year and pumped
when mixed liquor solids concentrations
result in excessive clarifier loading.
(5) Absorption Systems. The common design
of absorption systems is the use of absorption
trenches, each separate from the other and
each containing a distribution pipe. This type
system should be used whenever practical.
Other types of absorption systems may be
used as alternatives where the site conditions
meet the specific design requirements of the
alternative systems. Installation shall not be
made while the soil is wet or moist. This is
to prevent smearing and destroying the structure of the soil. All absorption systems should
have curtain drains, terraces or use of other
flow diversion methods to minimize surface
or ground water from loading the absorption
field.
(A) Absorption Trenches. The absorption
trench gives additional treatment to the
sewage from the treatment tank. Regardless
of its appearance of clarity or transparency,
the outflow or effluent from a sewage tank is
a dangerous source of contamination. The
satisfactory operation of the sewage disposal
system is largely dependent upon the proper
site selection, design and construction of the
absorption trench.
1. Absorption trenches should not be
constructed in soils having a percolation rate
slower than sixty minutes per inch (60
min./in.) and in no case shall absorption
trenches be constructed in soils with percolation rates slower than one hundred twenty
minutes per inch (120 min./in.) or where
rapid percolation may result in contamination
of water-bearing formations or surface
waters.
2. The absorption trench shall be located on the property to maximize the vertical
separation distance from the bottom of the
absorption trench to the seasonal high
groundwater level, as determined by the presence of mottling, bedrock or other limiting
layer. The vertical separation between the
bottom of the absorption trench and limiting
layer or seasonal high water table shall be no
less than one foot (1') for standard systems.
Greater vertical separation may be required
where water-bearing formations are in danger
of contamination.
3. Absorption trenches shall not be constructed in unstabilized fill or ground which
has become severely compacted due to construction equipment.
4. The minimum area in any absorption
trench system shall be in accordance with
Table 5. Absorption trenches in these highly
permeable soils shall have a minimum vertical separation of four feet (4') between the
absorption trench bottom and seasonal high
groundwater table or bedrock. Cherty clays
may have percolation rates between zero (0)
and sixty (60) minutes per inch. Cherty clay
soils located in areas of severe geological limitations shall have less than fifty percent
(50%) rock fragments and a vertical separation distance of four feet (4') or more
between the absorption trench bottom and
bedrock. Unlined absorption trenches shall
not be installed in cherty clays when the field
evaluation indicated the presence of large
voids. Regardless of the percolation rate,
absorption trenches installed in areas of
severe geological limitations with cherty
clays should be designed for a maximum
loading rate of forty-five hundredths gallons
per square foot (0.45 gals/sq. ft.) or a minimum of two hundred sixty-five square feet
per bedroom (265 sq. ft./bedroom).
Table 5 Minimum Absorption Area
Absorption
Percolation
Loading
Loading
Rate
Area
Rate
(sq. Ft./
(gal./sq.
(min./in.)
bedroom)
ft.)*
£10**
150
1.0
11-30
200
0.8
31-45
265
0.45
46-60***
300
0.4
61-120 Æ***
600
0.2
* Gallons of sewage tank effluent per day
per square foot of trench bottom.
** Soils with percolation rates of one to
ten minutes per inch (1 10 min./in.) or less
shall either be evaluated for severe geological
AND SENIOR SERVICES
Public Health
limitations by a registered geologist or a soil
morphology examination shall be required.
*** Note: When percolation rate is greater
than forty-five minutes per inch (45
min./in.), backfill above infiltration barrier
shall be sand, loamy sand or sandy loam
when available. Two to four inches (2 4”) of
loamy soil shall be used to cap the sandy
backfill. This is to keep rainwater from entering the system.
Æ Must be designed and approved by a Missouri registered engineer.
5. Each absorption trench system shall
have a minimum of two (2) trenches with no
one (1) trench longer than one hundred feet
(100') unless approved by the administrative
authority on a case-by-case basis. The
absorption trenches shall be located not less
than three (3) times the trench width on centers with a minimum spacing of five feet (5')
on centers.
6. Absorption trenches shall be at least
eighteen inches (18") wide and no more than
thirty-six inches (36") wide. Thirty-six inch
(36") wide trenches should not be utilized in
soils with percolation rates slower than fortyfive minutes per inch (45 min./in.). The bottom of standard absorption trenches shall be
at least eighteen inches (18") and no more
than thirty inches (30") below the finished
grade except as approved by the administrative authority.
7. The pipe used between the sewage
tank and the absorption system shall be a
minimum of four-inch (4") inside diameter
equivalent to the pipe used for the building
sewer as set forth in section (3) of this rule.
The pipe shall have a minimum fall of not
less than one-eighth inch (1/8") per foot. All
joints shall be of watertight construction.
8. Gravity-fed absorption field distribution lines should be at least four inches (4")
in diameter. Perforated distribution line shall
have holes at least one-half inch (1/2") and no
more than three-fourths inch (3/4") in diameter.
A. Pipe used for distribution lines
shall meet the appropriate ASTM standard or
those of an equivalent testing laboratory.
Fittings used in the absorption field shall be
compatible with the materials used in the distribution lines.
B. When four-inch (4") or six-inch
(6") diameter corrugated plastic tubing is
used for distribution lines, it shall be certified
as complying with applicable ASTM standards. The corrugated tubing shall have
either two (2) or three (3) rows of holes, each
hole between one-half inch (1/2") and threefourths inch (3/4") in diameter and spaced
longitudinally approximately four inches (4")
on centers. Coiled tubing shall not be used.
9. The absorption trenches shall be constructed as level as possible, but in no case
shall the fall in a single trench bottom exceed
one-fourth inch (1/4") in ten feet (10'). The
ends of distribution lines should be capped or
plugged, or when they are at equal elevations,
they shall be connected.
10. Rock used in soil absorption systems
shall be clean gravel or crushed stone, and
graded or sized between one and one-half and
three inches (1 1/2 3") with no more than ten
percent (10%) material to pass through a onehalf inch (1/2") screen. The rock shall be
placed a minimum of twelve inches (12")
deep with at least six inches (6") below the
pipe and two inches (2") over the pipe and
distributed uniformly across the trench bottom and over the pipe. Limestone and
dolomite shall be avoided when possible.
Before placing soil backfill over the trenches,
the gravel shall be covered with one (1) of the
following:
A. Unfaced, rolled, three and onehalf inch (3 1/2") thick fiberglass insulation;
B. Untreated building paper;
C. Synthetic drainage fabric; or
D. Other material approved by the
administrative authority laid as to separate
the gravel from the backfill.
11. Complex slope patterns and slopes
dissected by gullies shall not be considered
for installation of absorption trenches.
Uniform slopes under fifteen percent (15%)
shall be considered suitable slope for installation of absorption trenches. When slopes are
less than two percent (2%), provisions shall
be made to insure adequate surface drainage.
When slopes are greater than four percent
(4%), the absorption trenches shall follow the
contour of the ground. Uniform slopes
between fifteen percent (15%) and thirty percent (30%) should not be used for installation
of absorption trenches unless the soils are
three feet (3') or more below the trench bottom. Slopes within this range may require
installation of interceptor drains upslope from
the soil absorption system to remove all
excess water that might be moving laterally
through the soil during wet periods. Usable
areas larger than minimum are ordinarily
required in this slope range. Slopes greater
than thirty percent (30%) shall not be utilized
for installation of absorption trenches unless
the following requirements can be met and
approval is obtained from the administrative
authority:
A. The slope can be terraced or otherwise graded or the absorption trenches can
be located in naturally occurring soil so as to
maintain a minimum ten foot (10') horizontal
distance from the absorption trench and the
top edge of the fill embankment;
B. The soil is permeable and no
restrictive layers or water tables occur at a
depth within two feet (2') of the trench bottom;
C. Surface water runoff is diverted
around the absorption trench field so that
there will be no scouring or erosion of the
soil over the field or to allow surface runoff
onto the field;
D. If necessary, groundwater flow
from heavy rainfall is intercepted and diverted to prevent that water from running into or
saturating the soil absorption system; and
E. There is sufficient ground area
available to install the absorption trench system with these modifications.
12. Effluent distribution devices, including distribution boxes, flow dividers and flow
diversion devices, shall be of sound construction, watertight, not subject to excessive corrosion and of adequate design as approved by
the administrative authority. Effluent distribution devices shall be separated from the
sewage tank by a minimum of two feet (2') of
undisturbed or compacted soil and shall be
placed level on a solid foundation of soil,
gravel or concrete to prevent differential settlement of the device. Distribution boxes provided with flow equalizers are recommended.
A. Each distribution line shall connect individually to the distribution box and
shall be watertight.
B. The pipe connecting the distribution box to the distribution line shall be of a
watertight construction laid on undisturbed
earth.
C. No more than four (4) distribution
lines should be connected to a distribution
box receiving gravity flow unless the ground
surface elevation of the lowest trench is above
the flow line elevation of the distribution box.
13. Stepdowns or drop boxes may be
used where topography prohibits the placement of absorption trenches on level grade.
Serial distribution systems should be limited
to a separation of at least three feet (3')
between the bottom of the absorption trenches and the limiting condition such as slow
permeability or zone of seasonal saturation as
evidenced by mottling. Whenever the design
sewage flow rate requires more than seven
hundred and fifty lineal feet (750 lin. ft.) of
distribution line in a stepdown or drop-box
type system, the absorption field shall be
divided into two (2) or more equal portions.
Stepdowns shall be constructed of two feet
(2') of undisturbed soil and constructed to a
height level with the top of the upper distribution line. The inlet to a trench should be
placed either in the center or as far as practical from the outlet (overflow) from the same
trench. Drop boxes shall be constructed so
AND SENIOR SERVICES
Public Health
that the inlet supply pipe is one inch (1")
above the invert of the outlet supply pipe
which is connected to the next lower drop
box. The top of the trench outlet laterals,
which allow effluent to move to the distribution lines, shall be two inches (2") below the
invert of the outlet supply line. It is recommended that drop boxes be designed to close
off the trench outlets to provide for periods of
resting when the absorption trench becomes
saturated.
14. Dosing is recommended for all systems except serial distribution systems and
shall be provided when the design sewage
flow requires more than five hundred lineal
feet (500 lin. ft.) of distribution line. When
the design sewage flow requires more than
one thousand lineal feet (1000 lin. ft.) of distribution line, the absorption field shall be
divided into two (2) equal portions and each
half dosed alternatively, not more than four
(4) times per day. Dosing may be accomplished by the use of a pump. Each side of the
system shall be dosed not more than four (4)
times per day. The volume of each dose shall
be the greater of the daily sewage volume
divided by the daily dosing frequency, or an
amount equal to approximately three-fourths
(3/4) of the internal volume of the distribution lines being dosed (approximately onehalf gallon per lineal foot (1/2 gal./lin. ft.) of
four-inch (4") pipe). Whenever dosed distribution box systems are utilized, the separation distance between the absorption trench
bottom and limiting condition should be at
least two feet (2').
15. Gravelless subsurface absorption
systems may be used as an alternative to conventional four-inch (4") pipe placed in gravel
filled trenches, however they cannot be used
in areas where conventional systems would
not be allowed due to poor permeability, high
groundwater or insufficient depth to bedrock.
Design approval for these systems may be
required from the administrative authority
prior to installation and all manufacturing
specifications and installation procedures
shall be closely adhered to. Gravelless trench
systems using fabric wrapped tubing shall not
be used, however, where wastes contain high
amounts of grease and oil, such as in restaurants.
A. The eight (8)-, ten (10)-, and
twelve (12)-inch (inner diameter) corrugated
polyethylene tubing used in gravelless systems shall meet the requirements of ASTM
F667, Standard Specification for Large
Diameter Corrugated Polyethylene Tubing.
For purpose of calculation, the eight-inch
(8") pipe may be considered equal to eighteen
inches (18") in width of a standard absorption
trench. The ten-inch (10") pipe may be considered equal to twenty-five inches (25") in
width of a standard absorption trench.
B. Two (2) rows of perforations shall
be provided located one hundred twenty
degrees (120°) apart along the bottom half of
the tubing, each sixty degrees (60°) from the
bottom centerline. The tubing shall be
marked with a visible top location indicator
one hundred twenty degrees (120°) away
from each row of holes. Perforations shall be
cleanly cut and uniformly spaced along the
length of the tubing and should be staggered
so that there is only one (1) hole in each corrugation. The tubing shall be marked with a
visible top location indicator. All gravelless
drainfield pipe shall be encased at the point of
manufacture with a filter wrap of spun-bonded nylon, spun-bonded polypropylene or
other substantially equivalent material
approved by the administrative authority.
C. Rigid corrugated tubing shall be
covered with filter wrap at the factory and
each joint shall be immediately encased in a
protective wrap that will prevent ultraviolet
light penetration which shall continue to
encase the large diameter pipe and wrap until
just prior to installation in the trench. Filter
wrap encasing the tubing shall not be exposed
to sunlight (ultraviolet radiation) for extended
periods. Rocks and large soil clumps shall be
removed from backfill material prior to being
used. Clayey soils (soil group IV) shall not be
used for backfill. The near end of the large
diameter pipe shall have an offset adapter
(small end opening at top) suitable for receiving the pipe from the septic tank or distribution device and making a mechanical joint in
the trench.
D. The trench for the gravelless system shall be dug with a level bottom. On
sloping ground, the trench should follow the
contour of the ground to maintain a level
trench bottom and to ensure a minimum
backfill of six inches (6"). It is recommended that the minimum trench width for the
gravelless system be eighteen inches (18") in
friable soils to ensure proper backfill around
the bottom half of the pipe. In cohesive soils,
the minimum width of excavation should be
twenty-four inches (24"). In clay soils, it is
recommended that the trench be backfilled
with sandy material, sandy loam, loam, clay
loam, silt loam or silty clay loam. The gravelless system may be installed at a trench bottom depth of eighteen inches (18") minimum
to thirty inches (30") maximum, but a more
shallow trench bottom depth of eighteen to
twenty-four inches (18–24") is recommended. To promote equal effluent and suspended
solids distribution, the slope of the drain pipe
should be from zero to one-half inch per one
hundred feet (0–1/2 in./100 ft.).
E. A gravelless chamber may be
installed based on bottom absorption area utilizing a reduction of up to twenty-five percent
(25%) in the size of a standard gravel absorption area based upon a soil morphology evaluation indicating the feasibility of a reduction. However, as described in Table 6, the
maximum loading rate provided for any particular soil group must not be exceeded when
sizing for the thirty-four inch (34") chamber.
For this purpose, the fifteen inch (15") chamber may be considered equal to twenty-four
inches (24") in width of a standard absorption
trench. The twenty-two inch (22") chamber
may be considered equal to twenty-eight
inches (28") in width of a standard absorption
trench. The thirty-four inch (34") chamber
may be considered equal to forty-two inches
(42") in width of a standard absorption
trench.
F. Installation of the chamber system
shall be in accordance with this rule except:
(I) The installation shall be made in
accordance with the manufacturer's specifications;
(II) The side walls of trenches
placed in Group IVa soils shall be raked to
open pores which were damaged or sealed
during excavation; and
(III) Chambers utilizing maximum
sidewall absorption features shall be installed
per the manufacturer's recommendations to
maximize the use of upper soil horizons; and
G. A reduction of up to twenty-five percent (25%) in the size of the absorption field
may be allowed based upon a soil morphology evaluation indicating the feasibility of a
reduction. However, as described in Table 6,
the maximum loading rate provided for any
particular soil group must not be exceeded.
Table—6 Loading Rate for Chamber
Systems*
Soil Group
Range for Chambers
(gpd/sq. ft)
I
1.0–1.2
II
0.7–0.8
III
0.5–0.6
IVa
0.3–0.4
IVb
Unsuitable
V**
0.4–0.6
* Note: All application rates are for area of
trench bottoms only.
** Note: No reduction is allowed for
chamber systems in Group V soils.
16. Dosing/alternating systems are
encouraged, especially in slowly permeable
soil conditions.
17. The administrative authority may
permit the use of a bed system on sites where
the minimum soil permeability is a percolation rate of forty-five minutes per inch (45
min./in.) and essentially meeting the other
requirements of this section, and only on lots
which are limited by topography, space or
other site planning considerations. In such
cases the number of square feet of bottom
area needed shall be increased by fifty percent (50%) over what would be required for
a trench system. Distribution lines shall be at
least eighteen inches (18") from the side of
the bed and shall have lines on three-foot (3')
centers and care must be taken to divert surface water away from the bed. When the
design volume of sewage exceeds six hundred
gallons (600 gals.) per day, adequate space
shall be provided to accommodate a trench
system for the absorption field. There shall
be no less than a two-foot (2') separation
between the bed bottom and the limiting layer
or seasonal high water table.
(B) Possible modifications to standard
absorption systems which may be utilized to
overcome selected soil and site limitations
and must be approved by the administrative
authority include the following:
1. Shallow placement of absorption
trenches shall be utilized where insufficient
depth to seasonally high or perched water
table or where insufficient soil thickness prevents the placement of conventional distribution lines in accordance with this section.
Shallow trenches shall be designed and constructed to provide a minimum of two feet
(2') of natural soil separation between the
trench bottom and the uppermost elevation of
the seasonally high or perched water table
and rock. Shallow trenches may be constructed by placing the top of the gravel at original
ground level and covering the absorption field
with loamy soil, (sandy loam, loam, clay
loam, silt loam or silty clay loam) to a depth
of eight to twelve inches (8–12") at the center. The cover over the absorption field shall
extend at least five feet (5') beyond the edge
of any trench and have a turf grass cover
established immediately after construction. If
an area is to be filled and the trenches constructed in the fill with the bottom of the
trenches in at least six inches (6") of natural
soil, the following procedures must be followed:
A. The fill material should be of a
sandy texture with a maximum clay content
of twenty percent (20%). The fill material
should not be hauled or worked wet. The area
to be filled must be protected from traffic and
small brush and trees removed prior to placement;
B. The soil surface must be loosened
with a cultivator or garden plow. This work
must be done when the soil is dry;
C. The fill is moved onto the site
without driving on the loosened soil. The fill
material is then tilled into the natural soil to
create a gradual boundary between the two
(2). The remaining fill is then added in layers
until the desired height is obtained with each
layer being tilled into the preceding layer; and
D. The site is then shaped to shed
water and fill all low spots before the absorption system is installed. After installation of
the absorption system, the site must have a
turf grass cover established as soon as possible;
2. Alternating dual field absorption systems may be utilized where soils are limited
by high clogging potentials, percolation rates
slower than sixty minutes per inch (60
min./in.) or high shrink/swell potential soils
and where the potential for malfunction and
need for immediate repair is required.
Alternating dual field absorption systems
shall be designed with two (2) complete
absorption fields, each sized a minimum of
seventy-five percent (75%) of the total area
required for a single field and separated by an
effluent flow diversion valve. The diversion
valve shall be constructed to resist five hundred pounds (500 lbs.) crushing strength,
structurally sound and shall be resistant to
corrosion. A valve placed below ground level
shall be constructed so that it may be operated from the ground surface; and
3. Sand-lined trenches may be used in
areas where the soil has greater than fifty
percent (50%) rock fragments and there are
severe geological limitations. For a maximum
loading rate of forty-five hundredths gallons
per day per square foot (.45 gpd/sq. ft.) or a
minimum of two hundred sixty-five square
feet per bedroom (265 sq. ft./bedroom), the
sand is not required to meet the requirements
for intermittent sand filters. The material
must be natural or manufactured sand and
have no more than fifteen percent (15%) clay
content. Manufactured sand shall be chat,
fines manufactured from igneous rocks or
chert gravel or manufactured from crushed
glass. Crushed limestone is not acceptable.
For higher loading rates, the sand must meet
the requirements for an intermittent sand filter.
A. In standard four-inch (4") pipe and
gravel trenches, the depth of liner material
must be twelve inches (12") below the gravel
and at least six inches (6") on the sides of the
gravel up to the top of the gravel. To place
sand on the sides of the trenches, the trench
walls must be excavated on a slope instead of
vertically. The side slopes should be two horizontal to one vertical (2:1) and in no case
steeper than one horizontal to one vertical
(1:1).
B. In gravelless pipe systems the minimum thickness of liner material is six inches (6") around the pipe.
C. The effluent to sand-lined systems
in areas of potential groundwater contamination should be equally distributed as much as
practically possible. Serial and drop-box systems shall not be used. As a minimum, a distribution box shall be used to evenly distribute the effluent to the trenches. Dosing is
recommended in order to more positively
assure even distribution.
D. The sand-lined trenches may be
used, with the approval of the administrative
authority, where the percentage of rock fragments is less than seventy percent (70%) for
at least four feet (4') below the trench bottom. For sand-lined trenches to function
properly, the permeability of the natural
material should be similar to the permeability of the liner material. Sand-lined trenches
must not be used over fragipans or other
restrictive layers which have potential to
perch water tables and could cause saturation
of the liner material.
(6) Alternative Systems.
(A) General. The intent of this section is to
provide minimum standards for the design,
location, installation, use and maintenance of
alternative sewage disposal systems in areas
of limiting soil characteristics, where a standard system cannot be installed or a standard
system is not the most suitable treatment.
Where these systems are employed, they shall
comply with all local codes and ordinances
and should be subject to timely inspections to
assure adherence to specifications. These systems, except for wastewater stabilization
ponds, shall be designed and stamped by a
licensed engineer. All absorption systems
should have curtain drains, terraces or use of
other flow diversion methods to minimize
surface or ground water from loading the
absorption field.
(B) Adoption and Use. Where this rule is
administered by an administrative authority,
those administrative authorities may adopt
this section in whole or in part as part of a
local code or ordinance. Further, nothing in
this rule or section shall require any administrative authority to allow the installation of
any system in this section.
(C) Low Pressure Pipe (LPP) System. A
low pressure, two- to four-foot (2–4') pressure head, pipe system may be utilized where
soil and site conditions prohibit the installation of a conventional or modified septic tank
system due to the presence of shallow soil
conditions, seasonally high water table conditions and slow soil permeability. The administrative authority may permit the use of a
LPP system where there are cherty clay soils,
severe geological limitations or both. The
separation distance in these areas of concern
for groundwater between the trench bottoms
and bedrock shall be at least four feet (4') or
more. The administrative authority may
require that the hydraulic design of LPP systems be designed by an engineer. The administrative authority may also require the LPP
trenches to be sand-lined if the soils have
severely diminished treatment capability due
to excessive rock content. The amount of
rock fragments shall be less than fifty percent
(50%) and in no case more than seventy percent (70%), unless the trenches are lined with
sand.
1. The LPP shall consist of the following basic components:
A. A network of one- to two-inch (1–
2") diameter perforated PVC, one hundred
sixty pounds per square inch (160 lbs./sq.
in.) pipe or equivalent placed in natural soil
at shallow depths, generally no more than
twelve inches (12"), in narrow trenches not
less than eight inches (8") in width and
spaced not less than five feet (5') on center.
Trenches shall include at least five inches
(5") of pea gravel, if available; or if necessary, no less than three-quarter inch (3/4")
crushed stone below the pipe and two inches
(2") above the pipe; and four inches (4") of
soil cover. The holes in the perforated pipe
should be spaced from two feet (2') to no
more than eight feet (8'). The minimum hole
size is five thirty-seconds inch (5/32");
B. A properly designed, two (2)-compartment septic tank or other approved pretreatment system and a pumping or dosing
tank. The pumping or dosing tank shall be a
minimum of five hundred gallons (500 gals.)
or have the capacity to store one (1) day's
flow above the pump on level, whichever is
greater. The tank shall be provided with a filter or screen capable of preventing the passage of suspended solids to the soil absorption system;
C. A submersible sewage effluent
pump (not a sump pump) with appropriate
on/off controls for controlled dosing and a
high water alarm or other approved pressure
dosing and distribution system; and
D. A watertight supply manifold pipe
for conveying effluent from the pump to the
low pressure network.
2. The soil and site criteria for low pressure pipe systems shall meet the following
minimum requirements:
A. LPP absorption fields shall not be
installed on slopes in excess of ten percent
(10%). LPP absorption fields may be
installed on slopes greater than ten percent
(10%), but require special design procedures
to assure proper distribution of effluent over
the absorption field;
B. There shall be at least twenty-four
inches (24") of separation between the naturally occurring soil surface and bedrock,
water-impeding formation, seasonally high
water table or evidence of chroma 2 mottles.
This twenty-four-inch (24") depth shall consist of permeable soils with percolation rates
less than or equal to sixty minutes per inch
(60 min./in.) or be classified as SUITABLE
or PROVISIONALLY SUITABLE in accordance with section (7) of this rule. The bottom of percolation test holes must be dug or
bored to the bottom of the proposed trenches.
The bottom of the proposed trenches must be
located a minimum of one foot (1') above
rock, water-impeding formation, seasonally
high water table or where there is evidence of
chroma 2 mottles. In areas where there are
severe geological limitations and the soils
have a high chert content, the bottom of the
proposed trenches shall be at least four feet
(4') above bedrock unless an evaluation by a
registered geologist determines that the separation distance may be reduced;
C. Components of the LPP shall not
be located in depressions or areas subject to
frequent flooding. Surface water, perched
ground water and other subsurface lateral
water movement shall be intercepted or
diverted away from all components of the
LPP. Final shape of the LPP distribution field
shall be such that rainwater or runoff is shed;
D. Location of the septic tank, pumping or dosing chamber and LPP absorption
field is subject to the same horizontal setbacks specified in subsection (1)(D) of this
rule. Horizontal setback distances in Table 1
shall be measured in the LPP absorption field
from a margin of two and one-half feet (2
1/2') beyond the lateral and manifold pipes;
E. An area that is at least equal in size
to the LPP distribution field area plus a two
and one-half foot (2 1/2') margin beyond the
lateral and manifold pipes and which meets
all other site and soil criteria shall be set
aside for a replacement field; and
F. There shall be no soil disturbance
to an approved site for an LPP system except
the minimum required for installation.
3. The following application rates shall
be used in determining the maximum application rate for low pressure pipe systems:
A. In calculating the number of
square feet for the absorption field (not
square footage of trench bottom), the design
sewage flow shall be divided by the application rate from Table 7. The lateral lines shall
have a minimum spacing of five feet (5') on
centers within the areas calculated for the
absorption field area; and
Table 7—Loading Rates
Loading Rates
Percolation
Absorption
Loading
Rate
Area
Rate*
(sq. ft./
(min. in.)
bedroom)
(gal./sq. ft.)
£10**
200
0.6
11–30
300
0.4
31–45
400
0.3
46–60
600
0.2
* Gallons of sewage tank effluent per day per
square foot of total area.
** In areas where there are severe geological
limitations and the soils consist of very gravelly soils of thirty-five or greater percent
(335%) gravels by volume, the loading rate of
two-tenths gallons per day per square foot
(0.2 gpd/sq. ft.) should be used even when
the percolation rate would indicate a higher
loading.
B. The systems shall be designed so
that the discharge from any one (1) lateral
line does not vary more than ten percent
(10%) from the other laterals. All laterals
shall have an envelope of trench rock surrounding the pipe. The trench rock shall be
placed to a minimum depth of four inches
(4") below the pipe and two inches (2") above
the pipe.
4. Design of the LPP shall comply with
accepted practices and be specifically
approved by the administrative authority. The
system shall be designed and bear the seal of
a Missouri registered engineer.
(D)
Wastewater
Stabilization
Ponds
(Lagoon). A waste stabilization pond can provide satisfactory sewage disposal in rural
areas where soils are not suited for absorption systems. Single residence wastewater stabilization ponds are not generally suitable in
subdivisions with lots less than three (3)
acres in size. No more than one (1) single
family residence will be allowed on one (1)
stabilization pond.
1. The following minimum separation
distances may be modified as necessary to
accommodate site requirements or local
codes:
A. The pond shall be located a minimum of seventy-five feet (75') from property
lines as measured from the adjoining pond
shoreline. However, this distance must be
increased where necessary to be sure that all
effluent is disposed upon the property from
which it originated;
B. The pond shall be located a minimum of two hundred feet (200') from the
nearest existing residence and a minimum of
one hundred feet (100') from the residence
that it serves;
C. The pond shall be located at least
one hundred feet (100') from a potable water
supply or pump suction line; and
D. The pond shall be located at least
fifty feet (50') from a stream, water course,
lake or impoundment.
2. Ponds may be utilized when there are
no significant limitations related to groundwater from their use and the soils have been
demonstrated to be very slowly permeable
such as percolation rates slower than one
hundred twenty minutes per inch (120
min./in.). There shall be either a minimum
separation distance between the pond bottom
AND SENIOR SERVICES
Public Health
and creviced bedrock of three feet (3') or
installation of a clay liner with a minimum
thickness of one foot (1') or a synthetic liner,
either of which must be acceptable to the
administrative authority. Percolation losses
from the pond shall not exceed one-eighth
inch (1/8") per day to prevent groundwater
contamination or nuisance conditions. Site
modifications may be accomplished to provide these soil requirements. In areas of
severe geological limitations, restrictive layers such as fragipans shall be a minimum of
twelve inches (12") thick and shall not be
breached during construction.
3. Steeply sloping areas should be avoided.
4. Selection of the pond site should consider a clear sweep of the surrounding area by
prevailing winds. Heavy timber should be
removed for a distance of fifty feet (50') from
the water's edge to enhance wind action and
prevent shading.
5. The administrative authority may
require that a properly sized and constructed
septic tank or aeration unit precede the pond.
If irrigation of the effluent is required to
maintain the wastewater on the property from
which it originated, a septic tank or aeration
unit should precede the pond. The use of a
septic tank or aeration unit should not be
used as a basis for reduction of the set-back
distances as set forth in subparagraphs
(6)(D)1.A.–D. of this rule.
6. The pond shall be designed on the
basis of four hundred forty square feet (440
sq. ft.) of water surface area per bedroom at
the three-foot (3') operating level. This
square footage may be reduced by a maximum of twenty percent (20%) if a septic
tank, aeration unit or other pretreatment
device precedes the pond. The minimum
water surface area at the three-foot (3') level
shall be nine hundred square feet (900 sq.
ft.).
7. A single cell is generally acceptable
for single residence pond systems. If multiple
cells are used for further polishing or storing
of the effluent, the secondary cell should be
one-half (1/2) the size of the primary cell.
8. The minimum embankment top width
shall be four feet (4'). The embankment
slopes shall not be steeper than three to one
(3:1) on the inner and outer slopes. Inner
embankment slopes shall not be flatter than
four to one (4:1). Outer embankment slopes
shall be sufficient to prevent the entrance of
surface water into the pond. Freeboard shall
be at least eighteen inches (18") and preferably twenty-four inches (24"). Additional
freeboard may be provided.
9. To minimize erosion and facilitate
weed control, embankments shall be seeded
with a locally hardy grass from the outside
toe to one foot (1') above the water line.
Alfalfa or similar long-rooted crops which
might interfere with the structure of the
embankment shall not be used. Rip rap may
be necessary under unusual conditions to provide protection of embankments from erosion.
10. The influent line shall be of a sound,
durable material of watertight construction of
SDR 35 or greater. The line shall have a minimum diameter of four inches (4") and be laid
on a firm foundation at a minimum grade of
one-eighth inch (1/8") per foot from the point
of entry into the pond. The influent line shall
discharge as far as practical from the possible
outlet side of the pond. A cleanout or manhole should be provided in the influent line
near the pond embankment. From this point
the line shall either be laid to the inner toe of
the embankment and then on the bottom of
the pond to the terminus point or the line
shall be supported and secured every five feet
(5'). A concrete splash pad three feet (3')
square should be placed under the terminus
of the pipe. The elevation of the cleanout or
manhole bottom should be a minimum of six
inches (6") above the high water level in the
pond.
11. The pond shall be shaped so there
are no narrow or elongated portions. Round,
square or rectangular cells are considered
most desirable. Rectangular cells shall have a
length not exceeding three (3) times the
width. No islands, peninsulas or coves shall
be permitted. Embankments should be rounded at corners to minimize accumulation of
floating materials.
12. The floor of the pond shall be
stripped of vegetation and leveled to the proper elevation. Organic material removed from
the pond area shall not be used in embankment construction. The wetted area of the
pond must be sealed to prevent excessive
exfiltration. Seals consisting of soils must be
adequately compacted by the construction
equipment.
13. Embankments shall be constructed
of impervious materials and compacted sufficiently to form a stable structure with very
little settlement.
14. Any effluent should be withdrawn
from six inches (6") below the water surface.
This can be accomplished by placing a tee on
the inlet end of the pipe or by placing the outlet pipe eight to ten inches (8–10") lower on
the inlet end than the outlet end of the pipe.
15. The pond area shall be enclosed
with a fence conforming to the following conditions:
A. The fence shall be at least four feet
(4') in height;
B. The fence shall be welded, woven
or chain link material with no smaller than
fourteen gauge (14 ga.) wire. Cattle or hog
panels can be substituted with a tee post
being used for a line post;
C. Fence posts shall be pressure-treated wood, galvanized and/or painted steel.
Fence posts shall be driven, tamped or set in
concrete. Line posts should be at least eighteen inches (18") deep and shall be spaced no
more than ten feet (10') apart. Corner posts
should be at least twenty-four inches (24")
deep and shall be properly braced;
D. The fence shall be of sound construction with no gaps or openings along the
bottom;
E. The fence shall be no closer than
the center of the berm to the water's edge at
the three-foot (3') deep operating level. Fence
set-backs should not exceed thirty feet (30')
from the water's edge;
F. A properly hinged four foot (4')
high gate or comparable materials shall be
installed and provided with an effective latching device. The gate should be thirty-six to
forty-eight inches (36–48") in width to
accommodate maintenance and mowing
equipment; and
G. The fence must be completed prior
to occupancy of the dwelling.
16. Effluent from a pond must be disposed of on the property from which it originated. This may be accomplished by locating
the outlet as far as practical from the property line and out of any natural drainage ditches or swales. The minimum distance from the
outlet to a property line shall be one hundred
feet (100'). Another method is to construct a
terraced swale with a minimum length of one
hundred fifty feet (150'). If these methods
are unsuccessful, or whenever there is less
than twelve inches (12") of permeable soil
over a restrictive layer, controlled surface
irrigation must be used. To utilize controlled
surface irrigation, the pond must be capable
of operating up to five feet (5') deep with one
foot (1') of freeboard or have a second cell
for storage. The administrative authority shall
approve the method of effluent disposal.
17. It may be necessary to introduce
water into the pond to facilitate start-up of the
biological processes, however, there shall be
no permanent connection of any roof drain,
footing drain or any source of rainwater to the
wastewater stabilization pond.
18. Odor problems caused by spring
turnover of water, temporary overloading, ice
cover, atmospheric conditions or anaerobic
conditions may be controlled by broadcasting
sodium or ammonium nitrate over the surface
of the pond. In general, the amount of sodium or ammonium nitrate should not exceed
AND SENIOR SERVICES
Public Health
two pounds (2 lbs.) per day until the odor dissipates.
(E) Elevated Sand Mounds. Elevated sand
mounds may be considered whenever site
conditions preclude the use of absorption
trenches. The construction of a mound shall
be initiated only after a site evaluation has
been made and landscaping, dwelling placement, effect on surface drainage and general
topography have been considered. Due to the
nature of this alternative system, actual selection of mound location, size of mound and
construction techniques must be carefully
considered and the criteria established in this
rule implicitly followed. A set-back distance
of fifty feet (50') from the downslope property line is recommended.
1. Elevated sand mounds shall not be
utilized on soils where the high groundwater
level as evidenced by mottling, bedrock or
other strata having a percolation rate slower
than one hundred twenty minutes per inch
(120 min./in.) occurs within twenty-four
inches (24") of natural grade. Up to four feet
(4') of soil thickness over bedrock may be
required in areas where there is a significant
potential for groundwater contamination.
Mounds shall be constructed only upon
undisturbed naturally occurring soils.
2. Elevated sand mounds are subject to
the setback distances required in subsection
(1)(D) of this rule.
3. The fill material from the natural soil
plowed surface to the top of the rock-filled
bed shall be sand, loamy sand or sandy loam.
Loading rates on the sand fill shall not exceed
the values in Table 8.
Table 8—Recommended Loading Rates
for Soil Textures
Suited to Use as Fill in a Mound System
Texture Loading Rate
(gal./sq. ft./day)
Medium to
coarse sand
1.2
Fine sand
1.0
Loamy sand
0.8
Sandy loam
0.6
Note: Rock fragments larger than one-sixteenth inch (1/16") shall not exceed fifteen
percent (15%) by volume of the material used
for sandy fill.
4. There shall be a minimum of one foot
(1') of fill material and two feet (2') of naturally occurring soils between the bottom of
the trench rock and the highest elevation of
the limiting conditions as defined in paragraph (6)(E)1. of this rule.
5. Whenever possible, mounds should
be located on flat areas or crests of slopes.
Mounds should not be located on natural
slopes of more than six percent (6%) if the
percolation rate is slower than sixty minutes
per inch (60 min./in.) to a depth of at least
twenty-four inches (24") below the sand
layer. Mounds may be located on slopes up to
a maximum of twelve percent (12%) if the
soil percolation rate is faster than sixty minutes per inch (60 min./in.) to a depth of twenty-four inches (24") below the sand layer.
6. In no case shall the width of the
trench rock in a single bed exceed ten feet
(10').
7. The required bottom area of the
trenches or bed and the effective basal area of
the mound shall be based on one hundred
twenty gallons per bedroom per day (120
gals./pbd). The basal area of the mound shall
have the minimum area as shown in Table 9.
Table 9—Loading Rate
Loading Rate
Percolation Rate of Basal Area
(min./in.)
(gpd/sq. ft.)
1–30
1.2
31–45
0.75
46–60
0.5
61–120
0.25
8. The area of sand fill shall extend
beyond the basal area and the sides shaped to
a three to one (3:1) or four to one (4:1) slope.
The sand fill shall be covered with six inches
(6") of fine textured soil and a final cap of six
inches (6") of good topsoil applied. Also the
mound shall be seeded with a hardy grass to
establish a turf grass cover as soon as possible. No shrubs shall be planted on the top of
the mound. Shrubs may be placed at the foot
and side slopes of the mound.
9. The land area fifty feet (50') down
slope of the elevated sand mound is the effluent dispersal area and the soil in this area may
not be removed or disturbed.
10. Dosing shall be required for all elevated sand mounds. The mound shall be
dosed not more than two (2) times per day.
The size of the dosing pump shall be selected
to maintain a minimum pressure of one
pound per square inch (1 psi), two and threetenths feet (2.3') of head, at the end of each
distribution line.
A. Perforation holes and hole spacing
shall be determined to insure equal distribution of the effluent throughout the bed or
trenches.
B. The perforated pipe laterals shall
be connected to a two-inch (2") diameter
manifold pipe with the ends capped. The laterals shall be spaced no farther than forty
inches (40") on center and no farther than
twenty inches (20") from the edge of the
trench rock. The perforated pipe laterals shall
be installed level with the perforations downward. There shall be a minimum of nine inches (9") of trench rock below the laterals and
two inches (2") above the laterals. The material used to cover the trench rock shall be
untreated building paper, six inches (6") of
compacted straw and three and one-half inch
(3 1/2") unbacked fiberglass insulation or a
geotextile.
C. The manifold pipe shall be connected to the supply pipe from the pump. The
manifold shall be sloped toward the supply
pipe from the pump. Antibackflow valves are
prohibited in the pump discharge line. The
pump discharge line shall be graded to permit
gravity flow to the absorption area or back to
the dosing tank. Proper air relief and antisiphon devices shall be installed in the piping
to prevent siphoning of effluent from the dosing tank or from the mound.
11. Prior to preparing the area selected
for the mound, aboveground vegetation must
be closely cut and removed from the ground
surface. Prior to plowing, the dosing pump
discharge line shall be installed from the
pump chamber to the point of connection
with the distribution manifold. The area shall
then be plowed to a depth of seven to eight
inches (7–8") parallel to the land contour
with the plow throwing the soil upslope to
provide a proper interface between the fill
and natural soils. A rubber-tired tractor may
be used for plowing but in no case shall a
rubber-tired tractor be used after the surface
preparation is completed. Tree stumps should
be cut flush with the surface and the roots
should not be pulled. The soil shall be plowed
only when the moisture content of a fragment
eight inches (8") below the surface is below
the plastic limit.
12. Mound construction shall proceed
immediately after surface preparation is completed.
A. A minimum of twelve inches (12")
of sand fill shall be placed where the trench
rock is to be located. A crawler tractor with
a blade shall be used to move the sand into
place. At least six inches (6") of sand shall be
kept beneath equipment to minimize compaction of the plowed layer. The sand layer
upon which the trench rock is to be placed
shall be level.
B. After hand leveling of the trench
rock, the distribution system shall be placed
and the pipes covered with two inches (2") of
rock. After installation of the distribution system, the entire mound is to be covered with
topsoil native to the area. The entire mound
shall be crowned by providing twelve inches
(12") of topsoil on the side slopes with a minimum of eighteen inches (18") over the center of the mound. The entire mound shall
then have a turf grass cover established to
assure stability of the installation.
C. The area surrounding the elevated
sand mound shall be graded to provide diversion of surface runoff waters.
(F) Holding Tanks. The use of holding
tanks is generally discouraged and their interim use should be limited to situations where
construction of satisfactory sewage treatment
and disposal systems will occur within one
(1) year. Use of a holding tank must be
specifically approved by the administrative
authority on a case-by-case basis which may
require stipulations in a signed agreement
regarding the use and the length of time for
use of the holding tank.
1. A holding tank shall be constructed of
the materials and by the same procedures as
those specified for watertight septic tanks.
2. A cleanout pipe of at least six inches
(6") diameter shall extend to the ground surface and be provided with seals to prevent
odor and exclude insects and vermin. A manhole of at least twenty inches (20") least
dimension shall extend through the cover to a
point within twelve inches (12") but no closer than six inches (6") below finished grade.
The manhole cover shall be covered with at
least six inches (6") of earth.
3. The tank shall be protected against
flotation under high water table conditions.
This shall be achieved by weight of the tank,
earth anchors or shallow bury depths.
4. For a residence, the size shall be one
thousand gallons (1000 gals.) or four hundred
gallons (400 gals.) times the number of bedrooms, whichever is greater. For permanent
structures, other than residences, the capacity shall be based on measured flow rates or
estimated flow rates. The tank capacity shall
be at least five (5) times the daily flow rate.
5. Holding tanks shall be located as follows:
A. In an area readily accessible to the
pump truck under all weather conditions;
B. As specified for septic tanks in
Table 1 set forth in subsection (1)(D) of this
rule; and
C. Where accidental spillage during
pumpage will not create a nuisance.
6. A contract for disposal and treatment
of the sewage wastes shall be maintained by
the owner with a pumper, municipality, agency or firm which possesses a current and
valid permit issued by the Department of
Natural Resources for such activity.
7. Holding tanks shall be monitored to
minimize the chance of accidental sewage
overflows. Techniques such as visual observation, warning lights or bells, or regularly
scheduled pumping shall be used. For commercial establishments, a positive warning
system shall be installed which allows twenty-five percent (25%) reserve capacity after
actuation.
8. Holding tanks used in conjunction
with permanent black water/gray water systems must conform to the requirements of
this section except that the minimum size tank
is one thousand gallons (1000 gals.). In these
situations, the holding tank is to receive toilet
wastes only.
(G) Sand Filters. Septic tanks or aeration
units and sand filters may be used along with
soil absorption systems in soils with percolation rates between sixty and one hundred
twenty minutes per inch (60–120 min./in.).
These systems must be specifically approved
by the administrative authority.
1. The septic tank and aeration units
must be in accordance with section (4) of this
rule. Setback distances as shown in Table 1
and as specified in subsection (1)(D) of this
rule shall apply except that the minimum distance to the downslope property line should
be fifty feet (50').
2. The following shall apply to gravity
flow sand filter systems:
A. All piping in a sand filter shall be
four inch (4") polyvinyl chloride (PVC).
Perforated pipe should be used for distribution and collection lines;
B. All sand filters shall be dosed at
two (2) times per day. Dosing shall provide
uniform distribution of wastewater throughout the filter cross-section and allow time for
reaeration of the pore spaces to occur. Dosing
may be accomplished by either pumps or
siphons;
C. Effluent from filter underdrains
must be collected and disposed of properly.
Effluent shall not discharge off the owner's
property;
D. Buried sand filters shall be in conformance with Table 10 of this rule. One (1)
collector line shall be provided for every six
feet (6') of bed width, with a minimum of
two (2) collector lines per bed. The collector
lines shall have a minimum grade of one percent (1%).
(I) Distribution lines shall be level
and spaced a maximum of three feet (3')
apart. Each distribution line must be vented
(downstream end) or connected to a common
vent. Vents should extend at least twelve
inches (12") above the ground surface with
the outlet screened or capped (perforated).
(II) Septic tank effluent shall be
applied to the filter through a distribution
box. Buried filters shall be dosed with a
pump or siphon. The dosing volume shall be
sufficient to fill the pore spaces in the gravel
to a depth of four inches (4"). For single bed
filters receiving septic tank effluent, the
hydraulic loading rate shall not exceed one
gallon per day per square foot (1 gpd/sq. ft.)
with a maximum organic loading of one and
three-fourths pounds (1 3/4 lbs.) of biological
oxygen demand (BOD) per day per one thousand square feet (1000 sq. ft.) of surface
area. Total surface area shall not be less than
two hundred square feet (200 sq. ft.); and
E. Open sand filters are similar to
buried filters with the exception that no soil
backfill or gravel is used on the top of the
sand and the filter must be enclosed within
concrete walls or other substantially equivalent material. Open sand filters shall be in
conformance with Table 10.
(I) Distribution of wastewater shall
be applied by pipes directly over the sand surface at the center of the bed or at the four corners. Splash plates beneath points of discharge must be used to prevent erosion of the
sand. Curbs around the splash plates or large
stones placed around the periphery of the
plate will help prevent scouring. All exposed
pipes shall slope to drain.
(II) Filter walls shall be concrete,
masonry, compacted clay, high density
polyethylene plastic with a minimum thickness of thirty (30) mil, or other material
acceptable to the administrative authority;
and extend six inches (6") above the sand and
six inches (6") above the adjacent ground
level.
(III) Dosing shall flood the bed to a
depth of two inches (2") with a hydraulic
loading of two to five gallons per day per
square foot (2–5 gpd/sq. ft.) (septic tank
effluent). Maximum organic loading is five
and thirteen-hundredths pounds (5.13 lbs.) of
BOD per day per one thousand square feet
(1000 sq. ft.) of surface area.
(IV) The filter may be covered to
provide protection against severe weather,
prevent growth of weeds and to keep children
and animals out of the filter. Such cover may
include six inches (6") of clean one to two
inch (1–2") gravel, if so designed by an engineer as part of the system. In such event, a
vent for the system would not be required if
so determined by the engineer.
AND SENIOR SERVICES
Public Health
3. The following shall apply to pressure
dosed sand filter systems:
A. Conventional pressure dosed sand
filters use an intermittent filter with two feet
(2') or more of medium sand designed to filter and biologically treat sewage tank effluent
from a pressure distribution system at an
application rate not to exceed one and twenty-five hundredths gallons per square foot
(1.25 gals./sq. ft.) sand surface area per day,
applied at a dose not to exceed one-half gallon (1/2 gal.) per orifice per dose. These
sand filters may be buried or open.
B. Recirculating pressure dosed sand
filters use a recirculating filter with two feet
(2') or more of medium filter media designed
to filter and biologically treat sewage tank
effluent from a pressure distribution system
at an application rate not to exceed five gallons per square foot (5 gals./sq. ft.) filter surface per day, applied at a dose not to exceed
two gallons (2 gals.) per orifice per dose.
These sand filters shall be uncovered and
open to the surface.
C. Minimum filter area for these filters shall be as follows:
(I) Conventional pressure dosed
sand filters for single family residences shall
be a minimum of three hundred and sixty
square feet (360 sq. ft.) in surface area with
a design sewage flow not to exceed six hundred gallons (600 gals.). If sand filter design
flows exceed an average of four hundred and
fifty gallons per day (450 gpd), the minimum
sand surface will be based on one and twenty-five hundredths gallons per day per square
foot (1.25 gpd/sq. ft.); and
(II) Pressure dosed sand filters for
commercial facilities shall be sized on the
basis of projected daily sewage flow. If the
waste strength is proposed to be greater than
residential strength waste, pretreatment shall
be required which will reduce the biological
oxygen demand to levels not to exceed three
hundred (300), total suspended solids to levels not to exceed one hundred-fifty (150), and
oil and grease to levels not to exceed twentyfive (25). The minimum sand surface will be
based on two to five gallons per day per
square foot (2–5 gpd/sq. ft.).
D. Design criteria shall include the
following:
(I) Sewage tanks shall be in accordance with section (4) of this rule. Set-back
distances as shown in Table 1 of subsection
(1)(D) and as specified in subsection (1)(E)
of this rule shall apply, unless a variance has
been allowed by the administrative authority.
Tanks shall be watertight and tested in the
field. The test shall be performed by filling
the tank two inches (2") above the riser inlet.
At the end of the first twenty-four (24)-hour
period, the tank water level should be
refilled. After another twenty-four (24)-hour
period, no more than one inch (1”) of water
should have dropped from the original reading. All sewage and pump tanks will be supplied with vandal-proof access risers to grade
over the pump units. Risers should have a
waterproof epoxy seal between the tank and
riser;
(II) Pumping systems for a pressure
dosed sand filter system should provide
pumping apparatus that is capable of filtering
gross solids larger than one-eighth inch
(1/8") and draw from the clear zone near the
outlet side of the sewage tank. This zone is
described as the layer of effluent between the
sludge and scum layers of the sewage tank.
Pumps should be able to deliver adequate
head pressure to control orifice plugging.
Pumps should be made of a corrosive resistant material such as Type 316 stainless steel,
suitable plastic, or 85-5-5-5 bronze. Screens
should have at least ten square feet (10 sq.
ft.) of surface area, with one-eighth inch
(1/8") openings;
(III) Operation controls should be
on a timer dose that distributes the average
daily flow over an eighteen (18)-hour period.
Recirculating filters will be set to recirculate
five (5) times the average daily flow over a
twenty-four (24)-hour period. Systems should
be designed with a high water alarm and light
signal. Control panels should be located on
an exterior location. Control operations
should be located in an area available for
maintenance;
(IV) Intermittent filter media shall
be a mixture of sand or durable inert particles
with one hundred percent (100%) passing the
three-eighths inch (3/8") sieve; ninety to one
hundred percent (90–100%) passing the No.
4 sieve; sixty-two to one hundred percent
(62–100%) passing the No. 10 sieve; fortyfive to eighty-two percent (45–82%) passing
the No. 16 sieve; twenty-five to fifty-five percent (25–55%) passing the No. 30 sieve; ten
percent (10%) or less passing the No. 60
sieve; four percent (4%) or less passing the
No. 100 sieve; or sand meeting the ASTM-C
33 concrete sand specification minus four
percent (4%) or less passing the No. 100
sieve. All drainage rock should be a river
washed, hardened and weathered rock. The
treatment media will be two inches (2") deep
and of a coarse media with an effective size
of one and one-half to three millimeters (1
1/2–3 mm) and a uniformity coefficient of
less than two (2). Limestone or dolomite is
not acceptable for drainage rock;
(V) Recirculating filter media shall
be a mixture of sand or durable inert particles
with one hundred percent (100%) passing the
three-eighths inch (3/8") sieve; seventy-nine
to one hundred percent (79–100%) passing
the No. 4 sieve; eight to ninety-two percent
(8–92%) passing the No. 8 sieve; zero to fifteen percent (0–15%) passing the No. 30
sieve; zero to one percent (0–1%) passing the
No. 50 sieve. All drainage rock should be a
river washed, hardened and weathered rock.
The treatment media will be two inches (2")
deep and of a coarse media with an effective
size of one and one-half to three millimeters
(1–1/2 3 mm) and a uniformity coefficient of
less than two (2). Limestone or dolomite is
not acceptable for drainage rock; and
(VI) Container designs may be concrete containers consisting of watertight walls
and floors to prevent groundwater from infiltrating or effluent from exfiltrating from the
filter. All penetrations through the walls shall
be watertight. Containers may also consist of
a thirty (30) mil polyvinyl chloride liner covering the sand filter bottom and side wall
areas. Polyvinyl chloride liners should be
supplied with repair kits and boots for passage through the liner wall. The bottom area
of the liner should be bedded in two inches
(2") of leveling sand. The liner should be
constructed to form a waterproof membrane
between the trench bottom and trench walls.
The polyvinyl liner should incorporate all
seams to be a chemically or heat bonded
waterproof seam.
E. The filter design criteria shall
include the following:
(I) The interior base of the filter
container shall be level or constructed at a
grade of one percent (1%) or less to the
underdrain pipe elevation;
(II) The underdrain piping shall
consist of a pipe with one-fourth inch (1/4")
grooves cut every four inches (4") along the
pipe length to a depth of one-half (1/2) of the
pipe diameter. The bottom of the filter container shall be covered with a minimum of six
inches (6") of drain media. The underdrain
pipe shall be enveloped in an amount and
depth of drainage rock to prevent migration of
the underdrain media into the pipe perforations;
(III) A minimum of twenty-four
inches (24") of approved filter media shall be
installed over the underdrain media. The
media shall be damp at the time of installation to insure compaction of the media. The
top surface of the media shall be level;
(IV) There shall be a minimum of
three inches (3") of clean drain media below
the distribution laterals, and sufficient media
above the laterals equal to or covering the orifice shields and/or pipe;
(V) Distribution laterals shall be
evenly spaced on minimum, thirty-inch (30")
centers. Orifices shall be placed such that
there is one (1) orifice or more on average
per six square feet (6 sq. ft.) of sand surface.
Orifice holes shall be one-eighth inch (1/8")
in diameter. The diameter of the piping manifold and lateral shall be no less than one-half
inch (1/2"). The ends of the distribution laterals should be constructed with a means to
perform flushing of the piping, collectively or
individually, through the operation of a flushing valve. The flushed effluent may be discharged to the sand filter;
(VI) The top of the intermittent
media in which the pressure distribution system is installed shall be covered with a
breathable nylon or polypropylene spun filter
fabric rated at eighty-five hundredths ounce
per square yard (0.85 oz./sq. yd.) to eliminate soil intrusion into the filter media.
Recirculating filters shall be open-topped;
(VII) The top of the intermittent
sand filter area shall be backfilled with a soil
cover, free of rocks, vegetation, wood waste,
etc. The soil cover shall have a textural class
of loamy sand. The soil cover shall have a
minimum depth of six inches (6") and a maximum depth of twelve inches (12").
Intermittent sand filters designs may delete
soil cover and incorporate three to six inches
(3–6") of a quality cypress or cedar mulch
over the entire filter area;
(VIII) Where the effluent from a
sand filter is to be discharged via a pump, the
pump and related apparatus shall be housed
in a vandal resistant vault designed to withstand the stresses placed upon it and not
allow the migration of drain media, sand or
underdrain media to its interior. The vault
shall have a durable, affixed floor. The vault
shall provide watertight access to the finished
grade with a diameter equal to that of a gravity discharge sand filter. The depth of the
underdrain and the operational level of the
pump cycle and alarm shall not allow effluent
to come within two inches (2”) of the bottom
of the sand filter media. The pump off level
shall be no lower than the invert of the perforations of the underdrain piping. The internal
sand filter pump shall be electrically linked to
the sand filter dosing apparatus in such a
manner as to prevent effluent from entering
the sand filter in event the internal sand filter
pump fails; and
(IX) Other sand filters which vary
in design from those described in this rule
may be authorized by the administrative
authority if they can be demonstrated to produce a comparable effluent quality.
F. Effluent from these sand filters
may discharge to the ground surface, provided the effluent is maintained on the owner’s
property and the following separation distances are maintained:
(I) The discharge shall be a minimum of one hundred feet (100') from private
water supply wells; one hundred-fifty feet
(150') from unplugged abandoned wells or
wells with less than eighty feet (80') of casing; and three hundred feet (300') from public water supply wells;
(II) The discharge shall be a minimum of one hundred feet (100') from
springs; five hundred feet (500') from the
edge of surficial sink holes; fifty feet (50')
from a classified stream; and twenty-five feet
(25') from a stream or open ditch; and
(III) The discharge shall be a minimum of seventy-five feet (75') from property
lines.
G. If effluent can not meet the minimum separation distances as described in
subparagraph (6)(G)2.F., then the effluent
must be disposed of into a soil absorption system. The required footage of the soil absorption system may be reduced by up to onethird (1/3) of that required for a conventional
soil absorption system. Shallow bury designs
should be utilized whenever possible to
achieve the best absorption rates.
(H) Drip Soil Absorption. Drip soil
absorption also known as trickle irrigation
may be approved by the administrative
authority in accordance with section (6) of
this rule. Due to the various pretreatment
methods and appurtenances and lack of
extensive experience, drip soil absorption
systems must be viewed as experimental, and
back-up design for another system shall be
approved in case of failure of the drip soil
absorption system.
1. Drip lines shall be placed two feet
(2') apart in a parallel arrangement. Emitters
shall be placed in the drip lines every two feet
(2') so there will be a two-foot by two-foot
(2'×2') grid pattern. Other configurations
and spacings of the drip line and emitters may
be used; however, each emitter will be considered to cover four square feet (4 sq. ft.) of
absorption area.
2. The application rate shall not exceed
the values as shown in Table 7 for low pressure pipe systems in subparagraph (6)(C)3.A.
of this rule.
3. Drip soil absorption systems may be
allowed at sites where the soil is classified as
being in group IVb. A minimum separation
distance of twelve inches (12") shall be maintained between the drip lines and emitters and
a high ground water table or other limiting
condition. The maximum application rate for
IVb soils shall be from five-hundredths to
one-tenth gallons per day per square foot
(0.05 0.10 gpd/sq. ft.) of absorption field
(I) Wetlands. Constructed wetlands
provide secondary levels of treatment, which
means that some form of pretreatment (septic
tank, aeration tank, lagoon, etc.) must be
used prior to the wetland, as wetlands cannot
withstand large influxes of suspended solids.
The pretreatment used must be capable of
removing a large portion of these solids.
Effluent from wetlands must be contained on
the owner’s property with the same set-back
distances as required for lagoons in Table 1,
located in subsection (1)(D) of this rule.
1. Free water surface wetlands are shallow beds or channels with a depth less than
twenty-four inches (24") and filled with
emergent aquatic plants. This type of wetland
shall not be allowed.
2. Submerged flow wetlands are similar to free water surface wetlands except that
the channels are filled with shallow depths of
rock, gravel or sand. The depth of the porous
media is usually less than eighteen inches
(18”). The porous media supports the root
systems of the emergent aquatic vegetation.
The water level is to be maintained below the
top of the porous media so that there is no
open water surface.
3. The surface area of wetlands shall be
determined by using the following equation:
As= [Q(inCo — InCe)]/(kT × f × d)
where: As = wetland surface area, sq. ft.
Q = daily flow rate to wetland,
cu.ft./day([gallons/day]÷7.5);
Co = influent BOD5 concentration,
mg/L;
Ce = effluent BOD5 concentration,
mg/L;
kT = temperature dependent rate
constant, per day;
d = water depth in wetland, ft; and
f = void fraction of rock media,
decimal.
4. After a surface area has been determined, a cross-sectional area shall be calculated against hydraulic loading by using the
following equation:
Ah = Q/(Kh × S)
where:Ah = cross-sectional area (hydraulic
loading), sq. ft.;
Kh = hydraulic conductivity of rock
media, ft./day*; and
S = slope of wetland bottom, deci-
mal
* A value of eight hundred feet per day (800
ft./day) may be used for the hydraulic conductivity for rock of one inch (1") diameter.
AND SENIOR SERVICES
Public Health
** Values for slope should range between
twenty-five hundredths and one percent (0.25
–1%).
5. After the hydraulic loading has been
determined, an organic loading shall be calculated using the following equation:
Ao = OGL/0.05
where:Ao = cross-sectional area (organic
loading), sq. ft.; and
OGL = organic loading, lbs BOD5/day.
6. The larger of the two (2) calculations,
the hydraulic loading or the organic loading,
shall be used to determine the wetland dimensions. Wetlands should not be long and narrow.
7. The width of the wetland shall be calculated by dividing the larger cross-sectional
area by the water depth. The calculated width
should not be less than one-third (1/3) of the
length (a length: width ratio of three to one
(3:1)). Should it be necessary to construct a
wetland with a ratio greater than three to one
(3:1), step-loading along the length of the
wetland shall be considered.
8. The configuration of a wetland for an
individual home can be a one (1) cell or two
(2) cells in series, depending upon the soil
properties at the site. Larger systems may
consist of multiple cells in parallel or series
in order to provide more management
options.
A. Single cells may be used where
there will be no percolation of water through
the bottom of the wetland. Water movement
properties of the soil at the wetland construction site must be determined either by use of
properly performed percolation tests or a
thorough soil profile analysis performed by a
qualified person meeting the criteria of 19
CSR 20-3.080.
B. For soils with percolation rates of
sixty minutes per inch (60 min./in.) or less
and where geological limitations are not
severe, a two (2)-cell wetland may be used.
The first cell shall be lined, allowing no percolation. The second cell may be unlined and
filled with sand (not rock) to promote some
percolation from the bottom of the wetland.
The second cell shall not be larger than the
first cell.
9. Crushed limestone or other rock with
sharp edges shall not be used for a porous
media as this type of rock will compact with
time. Rock with rounded edges, such as creek
gravel, shall be used. Rock must be thoroughly washed to remove fines which may
cause plugging. Rock substrate size should be
one inch (1") diameter, while rock to be used
around inlet and outlet pipes may be two to
four inches (2–4") diameter to reduce potential clogging. A three to four inch (3–4")
layer of washed pea gravel may be used on
top of the one inch (1") substrate for decorative purposes.
10. All piping shall be SDR 35 sewer
pipe, Schedule 40 polyvinyl chloride (PVC)
DWV pipe, or material of equivalent or
stronger construction. Piping shall be a four
inch (4”) diameter.
11. Influent shall be distributed and
effluent collected by header pipes running the
width of the wetland. Perforated sewer pipe
can be used for the headers. For unperforated
pipe, a one and one-half inch (1 1/2”) hole
shall be drilled every twelve inches (12”)
along the header. Headers shall be placed at
the bottom of the wetland on a bed of rock
and covered with two to four inch (2–4”)
rock. A cleanout shall be placed before the
influent header.
A. If effluent from the septic tank
flows to the wetland by gravity and there are
parallel cells in the wetland, a distribution
box shall be placed ahead of the wetland so
that flow can be controlled to individual cells.
B. If effluent is pumped, the pumping
rate shall not exceed twenty-five gallons per
minute (25 gpm) and no more than one-third
(1/3) of the daily design flow shall be
pumped at one (1) time.
12. Water level in a wetland shall be
controllable. The range of control shall be
from two inches (2") above the surface of the
rock to complete draining of the wetland.
Maximum water level in the wetland shall be
a minimum of twelve inches (12") below the
outlet of the septic tank so that water does not
back up into the septic tank.
A. To conveniently check the water
level relative to the gravel surface, a four inch
(4") diameter perforated pipe may be placed
in the bottom of the wetland, through the
channel embankment, and then elbowed up to
the elevation of the top of the channel.
B. Water level control may be
obtained by use of swivel standpipes or collapsible tubing.
13. Surface water shall be kept out of
the wetland. This may be accomplished by
diverting runoff away from the wetland or
constructing an earthen berm around the wetland. Berms shall be a minimum of six inches (6") above the surface of the porous media.
14. Emergent plants shall be selected by
the ability of the plants to: root and grow in
the wastewater-rock environment, treat
wastewater to acceptable levels, produce
biomass in amounts that can be controlled
and aesthetics. Reference may be made to
Tables 11 and 12 in selecting desired plants.
(J) Privy. A privy will be allowed only
under limited conditions and will not be recognized as a method of sewage disposal for a
continuously occupied dwelling, business or
other structure. A privy will only be considered for remote area not served by a piped
water source. Example of these areas may be
rural cemetery, a rural church with a small
congregation and where hand-washing facilities are available, or a river access point provided by the Department of Conservation.
Plans and construction of a privy will need to
meet the approval of the administrative
authority.
1. The privy shall be use to receive only
human excreta and toilet paper. The privy
shall not be used as a depository for other
wastes.
2. A pit shall be provided for the privy.
The sides of the pit shall be curbed to prevent
cave-in. If the pit has an earth bottom, the
bottom shall be at least three feet (3') above
saturated soil conditions. If this separation
distance cannot be achieved in the location of
the privy, then the pit shall be liquid tight.
AND SENIOR SERVICES
Public Health
AND SENIOR SERVICES
Public Health
3. The pit shall be periodically pumped
out by someone who services septic tank systems. At no time shall the pit contents be
allowed to accumulate to within one foot (1')
of the pit top. The pit contents shall then be
transported and disposed into a community
sewer system that is in compliance with
Chapter 644, RSMo.
4. Both the pit and the privy shall be
vented, Inspect-proof openings shall be
placed in the walls, below the seat. A vent
shall extend from the underside of the seat
board through the roof or up to a horizontal
vent open to the sides of the toilet. This vent
must be flush with the underside of the seat
board and shall not extend down into the pit.
All vent openings to the outside shall be
properly screened to keep out insects. The
top of the privy shall have a screened opening
on each side. It is preferable the opening be
all the way around the top of the privy in
order to allow to allow air to pass through
and to carry away any odors which may seep
into the upper part of the structure. If a crescent-shaped opening is cut into the door or
wall of the privy, it shall also be screened.
5. The inside of the privy shall be of
durable, smooth, nonabsorbent material. If
wood is used, the inside of the structure shall
be coated with a polyurethane-type coating so
as to minimize the penetration of liquids and
odors into the wood.
6. A tight-fitting door, preferably with a
self-closing feature, such as a door spring,
shall be used.
7. A privy shall be set back from surface
waters, buildings, property lines and water
supply wells the same distance as required for
soil treatment areas. This information may be
found in subsection (1)(D), Table 1 of this
rule.
8. The privy shall be of sufficient capacity for the facility it serves, but shall have at
least fifty cubic feet (50 cu. ft.) of capacity.
9. Abandoned pits shall have the contents removed, transported and disposed into
a community sewer system that is in compliance with Chapter 644, RSMo. This activity
shall be performed by someone who services
septic tank systems. The pit shall then be
filled with clean earth and slightly mounded
to allow for settling.
(K) Other Systems. Where unusual conditions exist, special systems of treatment and
disposal, other than those specifically mentioned in this rule, may be employed provided—
1. Reasonable assurance of performance
of the system is presented to the administrative authority;
2. The engineering design of the system
is first approved by the administrative authority;
3. Adequate substantiating data indicate
that the effluent will not contaminate any
drinking water supply, groundwater used for
drinking water or any surface water;
4. Treatment and disposal of the wastes
will not deteriorate the public health and general welfare;
5. Discharge of effluent, if any, shall be
within set-back distances as described in
Table 1, located in subsection (1)(D) of this
rule; and
6. These systems comply with all applicable requirements of this rule, with all local
codes and ordinances, and all applicable
requirements of sections 701.025–701.055
and Chapter 644, RSMo.
(L) Variances. Variances may be considered and granted by the administrative
authority concerning repair to on-site sewage
disposal systems existing prior to January 1,
1996 with site limitations or for property
platted prior to January 1, 1996 with site limitations. Where variances have been allowed
from the standards, the administrative authority may require that a higher level of pretreatment than that of a septic tank be provided. At the discretion of the administrative
authority and with relative assurance for protection of the public health and preservation
of the quality of surface and ground waters,
variances may be allowed for the following:
1. Setbacks as specified in Table 1,
located in subsection (1)(D) of this rule.
2. Minimum distance between the infiltrative surface and restrictive feature or
bedrock.
3. Minimum areas for infiltrative surfaces as shown in Table 5 (see (5)(A)4.),
Table 6 (see (5)(A)16.C.), Table 7 (see
(6)(C)3.A.), Table 8 (see (6)(E)3.), Table 9
(see (6)(E)7.) and Tables 13 and 14 (see
(7)(M)) of this rule.
4. A written application for a variance
shall be provided to the administrative
authority and shall provide the following:
A. An explicit description explaining
why the requirements of this rule cannot be
complied with, including a description of
specific sections of this rule for which a variance is being requested;
B. A design of the proposed system.
The design shall show that as much soil
absorption as is practically possible will be
installed;
C. The existing and maximum occupancy pattern and the existing water usage
records, if any;
D. Potential impact, if any, on neighboring property owners and the names and
mailing addresses of these property owners;
and
E. Adequate substantiating data to
indicate that the effluent will not contaminate
any drinking water supply, groundwater used
for drinking water or any surface water.
5. These systems shall comply with all
applicable requirements of these standards
except where variances have been granted.
6. No variance will be granted for any
system that would result in noncompliance
with Chapter 644, RSMo Missouri Clean
Water law and subsequent rules. On-site
sewage disposal systems with a discharge,
other than a system serving a single family
residence lot, must be referred to the
Department of Natural Resources and comply
with Chapter 644, RSMo, Missouri Clean
Water Law and subsequent rules.
7. If effluent can not meet the minimum
separation distances as described in Table 1
of subsection (1)(D), then the effluent must
be disposed of into a soil absorption system.
Set-back distances for lagoons will be considered applicable to alternative systems. The
required footage of the soil absorption system
following alternative systems may be reduced
by up to one-third (1/3) of that required for a
conventional soil absorption system. Shallow
bury designs should be utilized whenever
possible to achieve the best absorption rates.
8. All adjacent and/or affected property
owners shall be notified in writing by the
administrative authority whenever consideration for granting a variance is likely to result
in effluent crossing property lines. The party
requesting the variance shall be responsible
for supplying the names and addresses of all
adjacent and/or affected property owners to
the administrative authority. Adjacent and/or
affected property owners shall be allowed
thirty (30) days from the date of the written
notification to contact the administrative
authority to express comments concerning
the consideration of granting a variance.
9. In cases of complaint abatement,
where effluent cannot be maintained on the
owner’s property, within the required setback distances and presents a nuisance or
threat to public health or surface or ground
water quality, the administrative authority
may require a holding tank be placed at the
optimum location within the sewage system,
in order to abate the complaint. The owner
shall be responsible for assuring the holding
tank is pumped as needed, with the contents
being disposed of in a Department of Natural
Resources permitted facility.
(7) Detailed Soils Evaluation.
(A) General. The intent of this section is to
provide minimum standards for site evaluations
based upon evaluation of the soil characteristics, namely texture, color, structure,
drainage and depth. Criteria are also given
for sizing standard systems and some alternative systems.
(B) Adoption and Use. Where this rule is
administered by an administrative authority,
those administrative authorities may adopt
this section, in whole or in part, as part of a
local code or ordinance. Nothing in this rule
or section shall require any administrative
authority to allow an installation based upon
the criteria contained in this section. The
administrative authority may require percolation tests in addition to evaluation of soil
characteristics. Whenever percolation tests
and these criteria are used, the size of the
proposed system or suitability of a site should
be based upon which criteria produce the
most conservative system. This type evaluation should be conducted by a professional
soil scientist, engineer, sanitarian or registered geologist with special training in determining soil morphological characteristics in
the field.
(C) Site Evaluation. An investigation of a
proposed soil absorption site shall consider
the following factors:
1. Topography and landscape position;
2. Soil characteristics (morphology)
which includes texture, structure, porosity,
consistence, color and other physical, mineral and biological properties of various horizons, and the thickness and arrangement of
the horizons in the soil profile;
3. Soil drainage, which includes both
external (surface) and internal (soil);
4. Soil depth;
5. Restrictive horizons; and
6. Available space.
(D) Site evaluations shall be made in
accordance with subsections (7)(E)–(M) of
this rule. Based on this evaluation, each of
the factors listed in subsection (7)(C) of this
rule shall be classified as suitable, provisionally suitable or unsuitable.
(E) Topography and Landscape Position.
Uniform slopes under fifteen percent (15%)
shall be considered suitable with respect to
topography. When slopes are less than two
percent (2%), provisions shall be made to
insure adequate surface drainage. When
slopes are greater than four percent (4%), the
absorption lines shall follow the contour of
the ground.
1. Uniform slopes between fifteen percent (15%) and thirty percent (30%) shall be
considered provisionally suitable with respect
to topography, if the soils are thirty-six inches (36") or more thick. Slopes within this
range may require installation of interceptor
drains upslope from the soil absorption system to remove all excess water that might be
moving laterally through the soil during wet
period. Usable areas larger than minimum
are ordinarily required in this slope range.
2. Slopes greater than thirty percent
(30%) shall be considered unsuitable except
when a thorough study of the soil characteristics indicates that a soil absorption system
will function satisfactorily and sufficient
ground area is available to properly install
such a system. Slopes greater than thirty percent (30%) may be classified as provisionally
suitable when all of the following conditions
are met:
A. The slope can be terraced or otherwise graded or the absorption lines located
in naturally occurring soil to maintain a minimum ten-foot (10') horizontal distance from
the absorption trench and the top edge of the
fill embankment;
B. The soil characteristics can be
classified as suitable or provisionally suitable
to a depth of at least one foot (1') below the
bottom of the absorption trench;
C. Surface water runoff is diverted
around the absorption field so that there will
be no scouring or erosion of the soil over the
field;
D. If necessary, groundwater flow is
intercepted and diverted to prevent the water
from running into or saturating the soil
absorption system; and
E. There is sufficient ground area
available to install the septic tank system with
these modifications.
3. Complex slope patterns and slopes
dissected by gullies and ravines shall be considered unsuitable to topography.
4. Areas subject to frequent flooding
shall be considered unsuitable to landscape
positions.
5. Depressions shall be considered
unsuitable with respect to landscape positions
except when the site complies essentially with
the requirements of this section and is specifically approved by the administrative authority.
6. If directed by the administrative
authority, the surface area on or around a
ground absorption system sewage treatment
and disposal system shall be landscaped to
provide adequate drainage. The interception
of perched or lateral groundwater movement
shall be provided where necessary to prevent
soil saturation on or around the ground
absorption sewage treatment and disposal system.
(F) Soil Characteristics (Morphology).
Soil borings or pits shall be taken at the site
to be used for soil absorption systems. These
borings shall be taken to a depth of fortyeight inches (48") or as required to determine
the soil characteristics. Soil borings or pits
and core samples shall be evaluated and a
determination made on the suitability of the
soil to treat and absorb septic tank effluent.
The important soil characteristics which shall
be reviewed by the administrative authority
are as follows:
1. The relative amounts of the different
sizes of mineral particles in a soil are referred
to as soil texture. All mineral soils are composed of sand, two to five hundredths millimeters (2–.05 mm) in size; silt, which
includes intermediate-sized particles that cannot be seen with the naked eye but feel like
flour when pressed between the fingers, five
hundredths to two thousandths millimeter
(0.05–0.002 mm) in size; or clay, which is
extremely small in size and is the mineral
particle that gives cohesion to a soil, less than
two thousandths millimeters (0.002 mm) in
size or a combination of these. The texture of
the different horizons of soils may be classified into five (5) general groups and shall be
used for determining the application rates
shown in Tables 6 and 7 of this rule.
A. Soil Group I. Sandy texture soils
contain more than seventy percent (70%)
sand-sized particles in the soil mass. These
soils do not have enough clay to be cohesive.
Sandy soils have favorable sewage application
rates, but may have a low filtering capacity
leading to malfunction due to contamination
of groundwater. The sandy group includes the
sand and loamy sand soil textural classes and
shall generally be considered suitable in texture.
(I) Sand. Sand has a gritty feel,
does not stain the fingers and does not form
a ribbon or ball when wet or moist.
(II) Loamy sand. Loamy sand has a
gritty feel, stains the fingers (silt and clay),
forms a weak ball and cannot be handled
without breaking.
B. Soil group II. Coarse loamy texture
soils contain more than thirty percent (30%)
sand-sized particles and fewer than twenty
percent (20%) clay-sized particles in the soil
mass. They exhibit slight or no stickiness.
The coarse loamy group includes sandy loam
and loam soil textural classes and shall generally be considered suitable in texture.
(I) Sandy loam. Sandy loam feels
gritty and forms a ball that can be picked up
with the fingers and handled with care without breaking.
(II) Loam. Loam may feel slightly
gritty but does not show a fingerprint and
forms only short ribbons ranging from twenty-five hundredths to fifty hundredths inch
(.25–.50") in length. Loam will form a ball
that can be handled without breaking.
AND SENIOR SERVICES
Public Health
C. Soil group III. These fine loamy
texture soils contain fewer than forty percent
(40%) clay-sized particles and not more than
thirty percent (30%) sand-sized particles in a
soil mass. Also this group is limited to less
than thirty-five percent (35%) clay when the
clay minerals exhibit high shrink/swell characteristic and exhibit slight to moderate stickiness. The fine loamy group includes sandy
clay loam, silt loam, clay loam and silty clay
loam textural classes and shall generally be
considered provisionally suitable in texture.
(I) Silt loam. Silt loam feels floury
when moist and will show a fingerprint but
will not ribbon and forms only a weak ball.
(II) Silt. Silt has a floury feel when
moist and sticky when wet but will not ribbon
and forms a ball that will tolerate some handling.
(III) Sandy clay loam. Sandy clay
loam feels gritty but contains enough clay to
form a firm ball and may ribbon to form seventy-five hundredths to one-inch (.75–1")
pieces.
(IV) Silty clay loam. Silty clay
loam is sticky when moist and will ribbon
from one to two inches (1–2"). Rubbing silty
clay loam with the thumbnail produces a
moderate sheen. Silty clay loam produces a
distinct fingerprint.
(V) Clay loam. Clay loam is sticky
when moist. Clay loam forms a thin ribbon of
one to two inches (1– 2") in length and produces a slight sheen when rubbed with the
thumbnail. Clay loam produces a non-distinct
fingerprint.
D. Soil group IV. These clayey texture soils contain forty percent (40%) or
more clay-sized particles and include sandy
clay, silty clay and clay. This group may also
include clay loam and silty clay loam when
the clay fraction is greater than thirty-five
percent (35%) and of a high shrink/swell
nature. There are two (2) major types of clays
nonexpandable and expandable. The nonexpandable clays, when wet, are slightly sticky
to sticky; when moist, are friable to firm; and
when dry, they are slightly hard to hard. The
nonexpandable clays (Group IVa) shall generally be considered provisionally suitable in
texture. The expandable clays, when wet, are
very sticky and very plastic and when moist,
these clays are very firm to extremely firm
and when dry, are very hard to extremely
hard. The expandable clays (Group IVb) shall
be considered unsuitable in texture.
(I) Sandy clay. Sandy clay is plastic, gritty and sticky when moist and forms a
firm ball and produces a thin ribbon to over
two inches (2") in length.
(II) Silty clay. Silty clay is both
plastic and sticky when moist and lacks any
gritty feeling. Silty clay forms a firm ball and
readily ribbons to over two inches (2") in
length.
(III) Clay. Clay is both sticky and
plastic when moist, produces a thin ribbon
over two inches (2") in length, produces a
high sheen when rubbed with the thumbnail
and forms a strong ball resistant to breaking.
E. Soil group V. This soil group may
be of any texture, however, the most predominant are cherty and very cherty clays, silt
loams and silty clay loams. The amount of
rock fragments in these soils is of a concern
in areas of residual soils overlying highly permeable bedrock where groundwater could
become contaminated. In general, soils with
less than fifty percent (50%) rock fragments
will be considered suitable. In general, soils
with greater than fifty percent (50%) rock
fragments over highly permeable bedrock
will be considered unsuitable. Soils with
greater than fifty percent (50%) rock fragments will be considered provisionally suitable if geological limitations are not severe.
F. The soil texture shall be estimated
by field testing; and
2. Soil consistency. Soil consistency is
comprised of the attributes of soil material,
typically clay, that are expressed by the
degree and kind of cohesion and adhesion or
by the resistance to deformation or rupture.
A. Soil consistency when wet shall be
considered as follows:
(I) Stickiness. Stickiness is the
quality of adhesion to other objects. For field
evaluation of stickiness, wet soil material is
pressed between thumb and finger and its
adherence noted. Degrees of stickiness are
described as follows:
(a) Slightly sticky. After pressure, soil material adheres to both thumb and
finger but comes off one or the other cleanly.
It is not appreciably stretched when the digits
are separated;
(b) Sticky. After pressure, soil
material adheres to both thumb and finger
and tends to stretch somewhat and pull apart
rather than pulling free from either digit; and
(c) Very sticky. After pressure,
soil material adheres to both thumb and finger and is decidedly stretched when they are
separated; and
(II) Plasticity. Plasticity is the ability to change shape continuously under the
influence of an applied stress and to retain the
impressed shape on removal of the stress. For
field determination of plasticity, the soil
material shall be rolled between the thumb
and finger to observe whether or not a wire
or thin rod of soil can be formed. Degree of
resistance to deformation at or slightly above
field capacity is as follows:
(a)
Slightly
plastic.
Wire
formable but soil mass easily deformable;
(b) Plastic. Wire formable and
moderate pressure required for deformation
of the soil mass; and
(c) Very plastic. Wire formable
and much pressure required for deformation
of the soil mass.
B. Soil consistency when moist.
Consistence when moist is determined at a
moisture content approximately midway
between air dry and field capacity. At this
moisture content, most soil materials exhibit
a form of consistency—characterized by tendency to break into smaller masses rather
than into powder; some deformation prior to
rupture; absence of brittleness; and ability of
the material after disturbance to cohere again
when pressed together. To evaluate this consistency, a mass that appears slightly moist
shall be selected and attempt made to crush in
the hand.
(I) Friable. Soil material crushes
easily under gentle to moderate pressure
between thumb and finger, and coheres when
pressed together.
(II) Firm. Soil material crushes
under moderate pressure between thumb and
finger but resistance is distinctly noticeable.
(III) Very firm. Soil material crushes under strong pressure; barely crushable
between thumb and finger.
(IV) Extremely firm. Soil material
crushes only under very strong pressure; cannot be crushed between thumb and finger and
must be broken apart bit by bit.
C. Soil consistency when dry. The
consistency of soil materials when dry is
characterized by rigidity, brittleness, maximum resistance to pressure, more or less tendency to crush to a powder or to fragments
with rather sharp edges, and inability of
crushed material to cohere again when
pressed together. For evaluation, the air-dry
mass shall be selected and broken in the
hand.
(I) Slightly hard. Weakly resistant
to pressure, easily broken between thumb and
finger.
(II) Hard. Moderately resistant to
pressure; can be broken in the hands without
difficulty but is barely breakable between
thumb and finger.
(III) Very hard. Very resistant to
pressure; can be broken in the hands only
with difficulty; not breakable between thumb
and finger.
(IV) Extremely hard. Extremely
resistant to pressure; cannot be broken in the
hands.
3. Soil structure. In many soils, the
sand, silt and clay particles tend to cling or
stick to one another to form a ped or a clump
of soil. This is known as soil structure. Soil
structure may have a significant effect on the
movement of effluent through a soil.
Structure is usually not important in soil
groups I and II, and these types of soils shall
generally be considered suitable as to structure. The three (3) kinds of soil structure that
are most significant in movement of sewage
effluent through groups III and IV soils are
block-like, platy and the absence of soil
structure or massive conditions. These kinds
of soil structure are described as follows:
A. Block-like soil structure. In groups
III and IV soils, if the soil exhibits many peds
of angular and subangular peds, then the soils
have block-like structure. The sewage effluent
may move between the cracks of these types
of peds. Block-like structure in groups III and
IV soils is frequently destroyed by mechanical excavating equipment manipulating the
soil when it is too wet. Trenches for absorption lines being placed in groups III and IV
soils with block-like structure should only be
dug when the soils are moist or dry. Blocklike soil structure in groups III and IV soils
shall be considered provisionally suitable;
B. Platy soil structure. If groups III
and IV soils fall out into plate-like sheets,
then the soil would have platy structure.
Water or effluent movement through these
soils would be extremely slow, and the structure shall be considered unsuitable; and
C. Absence of soil structure. Some
groups II, III and IV soils are massive and
exhibit no structural aggregates. In these
kinds of soils, water or effluent movement
would be negligible. This structure shall be
considered unsuitable.
(G) Soil Drainage. Soils with seasonally
high water tables are of major concern in
evaluating sites for sewage effluent disposal.
These are the soil areas that give good sewage
absorption rates during dry seasons of the
year but force sewage effluent to the surface
during the wetter seasons.
1. The depth of the seasonal high water
table can commonly be recognized by those
examining soil profiles. The criterion for
recognition of high water tables is that of soil
color. Subsurface horizons that are in colors
of reds, yellows and browns generally indicate good soil aeration and drainage throughout the year. Subsurface horizons that are in
colors of gray, olive or bluish colors indicate
poor aeration and poor soil drainage. These
dull or grayish colors may occur as a solid
mass of soil or may be in mottles of localized
spots. The volume of grayish color is indicative of the length of time that free water
stands in that soil profile. There are soils that
have light-colored mottles which are relic
from the light-colored rock from which the
soils have weathered. These soils would not
have high water tables, so one must distinguish between a true soil composed of sand,
silts and clays, or the rock material that may
still exist in the soil profile. Similarly, there
are also some soils with surface or subsurface
eluvial horizons with light colors which can
be unrelated to drainage conditions.
2. Any soil profile that has the grayish
colors of chroma 2 or less (Munsell color
chart) indicative of high water tables, or is
either subject to periodic high water, within
twenty-four inches (24") of the surface, or is
less than twelve inches (12") between the
proposed trench bottom and the high water
table, shall be considered unsuitable as to
drainage. Soils where the seasonally high
water table is less than forty-eight inches
(48") and more than twenty-four inches (24")
below the naturally occurring surface shall be
considered provisionally suitable for soil
drainage, provided there remains at least
twelve inches (12") of soil between the proposed trench bottom and the seasonally high
water table. Soils where the seasonally high
water table is greater than forty-eight inches
(48") below the naturally occurring surface
shall be considered suitable for soil drainage.
Drainage systems installed for groundwater
lowering shall be maintained so that a minimum separation of one foot (1') occurs
between the absorption trench bottom and the
seasonally high water table. For extensive
drainage systems, such as groundwater lowering in subdivisions, easements shall be
recorded and shall have adequate width for
reasonable egress and ingress for maintenance.
(H) Soil Thickness. The thickness of soils
to rock which are classified as suitable or
provisionally suitable in texture and structure
shall be at least forty-eight inches (48") when
conventional soil absorption systems at conventional depths are to be utilized. Soil thickness greater than forty-eight inches (48")
shall be considered as suitable as to soil
thickness. Soil thickness less than forty-eight
inches (48") and greater than thirty-six inches (36") shall be considered provisionally
suitable. Where special design and installation modifications can be made to provide at
least two feet (2') of naturally occurring soil
below the bottom of the absorption trench,
these soils may be reclassified as provisionally suitable in thickness.
(I) Restrictive Horizons. Restrictive horizons in soils are recognized by their apparent
resistance in excavation or in the use of a soil
auger. Restrictive horizons may occur as
fragipans or claypans. The fragipan is a layer
that owes its hardness mainly to extreme density or compactness as opposed to high clay
content or cementation. The layer is typically dense and brittle. Although fragments are
friable when removed, when in place the
material is so dense that water moves through
it very slowly. Unlike fragipans, the claypan
is a compact, slowly permeable layer in the
subsoil having a much higher clay content
than the overlying material. A sharply
defined boundary exists between the claypan
and the overlying material. Claypans are typically hard when dry and plastic and sticky
when wet.
1. Restrictive horizons that are greater
than six inches (6") thick severely restrict the
movement of water and sewage effluent and
do not adequately respond to groundwater
lowering drainage systems. Where these horizons are less than six inches (6") thick, they
do not severely restrict the movement of
water and sewage effluent, but rather indicate
the presence of a seasonally high water table
and may be modified after special investigation.
2. Soils in which restrictive horizons are
six inches (6") or more in thickness and at
depths greater than forty-eight inches (48")
below the ground surface shall be considered
suitable as to depth to restrictive horizons.
Restrictive horizons six inches (6") or more
in thickness and at depths between forty-eight
inches and twenty-four inches (48–24") shall
be considered provisionally suitable as to
depth to restrictive horizons. Restrictive horizons six inches (6") or more in thickness
encountered at depths less than twenty-four
inches (24") below the ground surface shall
be considered unsuitable as to depth to
restrictive horizons.
(J) Other Applicable Factors. The site evaluation should include consideration of any
other applicable factors involving environmental principles including:
1. The potential environmental hazard of
possible failures of soil absorption systems
involving large quantities of sewage, which
would dictate larger separation distances than
the minimums specified in subsection (1)(D)
of this rule; and
2. The potential environmental and
health hazard of possible massive failures of
soil absorption systems proposed to serve
large numbers of residences, as in residential
subdivisions or mobile home parks.
(K) Determination of Overall Site
Suitability. All of the criteria in subsections
(7)(E)–(J) of this rule shall be determined to
be suitable, provisionally suitable or unsuitable as indicated. If all criteria are classified
the same, that classification shall prevail.
Where there is a variation in classification of
the several criteria, the following shall be
used in making the overall site classification.
The lowest of the uncorrectable characteristics will determine the overall site classification. The administrative authority shall make
this determination—
1. If the topography is classified as
unsuitable, it may be reclassified provisionally suitable under the conditions outlined in
subsection (7)(E) of this rule;
2. If the soil texture is classified as
unsuitable, the overall classification will be
unsuitable regardless of the other criteria
unless the provisions of subsection (6)(K) of
this rule are met;
3. If the soil structure is classified as
unsuitable, the overall classification will be
unsuitable regardless of the other criteria
unless the provisions of subsection (6)(K) of
this rule are met;
4. When soil thickness is classified as
unsuitable, it may be reclassified as provisionally suitable under the conditions outlined in subsection (7)(H) of this rule;
5. When the restrictive horizon is
classified unsuitable, it may be reclassified as
provisionally suitable under the conditions
outlined in subsection (6)(K) of this rule; and
6. When drainage (groundwater level)
is unsuitable, it may be reclassified as provisionally suitable under the conditions outlined in subsection (7)(G) of this rule.
(L) Site Classification. Sites classified as
suitable may be utilized for a ground absorption sewage treatment and disposal system
consistent with this rule. A suitable classification generally indicates soil and site conditions favorable for the operation of a ground
absorption sewage treatment and disposal system or have slight limitations that are readily
overcome by proper design and installation.
1. Sites classified as provisionally suitable may be utilized for a ground absorption
sewage treatment and disposal system consistent with this rule but with moderate limitations. Sites classified provisionally suitable
require some modifications and careful planning, design and installation for a ground
absorption sewage treatment and disposal system to function satisfactorily.
2. Sites originally classified as unsuitable may be used for soil absorption disposal
systems, provided engineering, hydrogeologic
and soil studies indicate to the administrative
authority that a suitable septic tank system or
a suitable alternate system can reasonably be
expected to function satisfactorily. These sites
may be reclassified as provisionally suitable
upon submission to the administrative authority and meeting the department's requirements in subsection (6)(K) of this rule.
(M) Design Criteria. Tables 13 and 14
shall be used when determining application
rates for the appropriate sewage disposal system design.
1. Table 13 shall be used when determining the application rate for septic tank
systems of conventional design when using
the site evaluation criteria in this rule.
2. The construction of any conventional
or LPP system must meet the other applicable requirements as set forth in section (6) of
this rule. Soils for LPP systems must be classified as suitable or provisionally suitable to
a depth of two feet (2') from the original
ground surface. Table 14 shall be used when
determining the application rate when using
the site evaluation criteria in this rule.
AND SENIOR SERVICES
Public Health
AND SENIOR SERVICES
Public Health
AUTHORITY: sections 701.040(1) and
701.043.1., RSMo 1994.* Emergency rule
filed April 17, 1995, terminated April 26,
1995. Original rule filed April 17, 1995,
effective Dec. 30, 1995.
*Original authority: 701.040 and 701.043, RSMo 1994.