10 CSR 60-15.020
Applicability of Corrosion Control Treatment Steps to Small, Medium-Size, and Large Water Systems
PURPOSE: This rule establishes deadlines
for public water systems to complete corrosion control treatment required in 10 CSR 6015.030 and to conduct associated monitoring.
(1) A large system (serving more than fifty
thousand (50,000) persons) shall complete
the corrosion control treatment steps as follows unless it is deemed to have optimized
corrosion control under paragraph (1)(B)1. or
2. of this rule.
(A) Treatment Steps and Deadlines for
Large Systems.
1. The system shall conduct initial monitoring (10 CSR 60-15.070(4)(A) and 10 CSR
60-15.080(2)) during two (2) consecutive six-
(6-) month monitoring periods by January 1,
1993.
2. The system shall complete corrosion
control studies (10 CSR 60-15.030(3)) by
July 1, 1994.
3. The department shall designate optimal corrosion control treatment (10 CSR 6015.030(4)) by January 1, 1995.
4. The system shall install optimal corrosion control treatment (10 CSR 6015.030(6)) by January 1, 1997.
5. The system shall complete follow-up
sampling (10 CSR 60-15.070(4)(B) and 10
CSR 60-15.080(3)) by January 1, 1998.
6. The department shall review installation of treatment and designate optimal water
quality control parameters (10 CSR 6015.030(7)) by July 1, 1998.
7. The system shall operate in compliance with the department-specified optimal
water quality control parameters (10 CSR 6015.030(8)) and continue to conduct tap
sampling (10 CSR 60-15.070(4)(C) and 10
CSR 60-15.080(4)).
(B) A large system is deemed to have optimized corrosion control and is not required to
complete the applicable corrosion control
treatment steps identified in this section if the
system satisfies one (1) of the following criteria. Any such large system deemed to have
optimized corrosion control, and which has
treatment in place, shall continue to operate
and maintain optimal corrosion control treatment and meet any requirements that the
department determines appropriate to ensure
optimal corrosion control treatment is maintained.
1. The system demonstrates to the satisfaction of the department that it has conducted activities equivalent to the corrosion control steps applicable to large systems. If the
department makes this determination, it shall
provide the system with written notice
explaining the basis for its decision and shall
specify the water quality control parameters
representing optimal corrosion control in
accordance with 10 CSR 60-15.030(7). Water
systems deemed to have optimized corrosion
control shall operate in compliance with the
department-designated optimal water quality
control parameters in accordance with 10
CSR 60-15.030(8) and continue to conduct
lead and copper tap and water quality parameter sampling in accordance with 10 CSR 6015.070(4)(C) and 10 CSR 60-15.080(4). A
system shall provide the department with the
following information in order to support this
determination:
A. The results of all test samples collected for each of the water quality parameters in 10 CSR 60-15.030(3)(C);
B. A report explaining the test methods used by the water system to evaluate the
corrosion control treatments listed in 10 CSR
60-15.030(3)(A), the results of all tests conducted, and the basis for the system’s selection of optimal corrosion control treatment;
C. A report explaining how corrosion
control has been installed and how it is being
maintained to insure minimal lead and copper
concentrations at consumers’ taps; and
D. The results of tap water samples
collected in accordance with 10 CSR 6015.070 at least once every six (6) months for
one (1) year after corrosion control has been
installed.
2. The water system submits results of
tap water monitoring conducted in accordance with 10 CSR 60-15.070 and source
water monitoring conducted in accordance
with 10 CSR 60-15.090 that demonstrates for
two (2) consecutive six- (6-) month monitoring periods that the difference between the
ninetieth percentile tap water lead level, computed under 10 CSR 60-15.010(3)(C), and
the highest source water lead concentration is
less than the practical quantitation level for
lead specified in 10 CSR 60-5.010(8)(B).
A. Those systems whose highest
source water lead level is below the method
detection limit may also be deemed to have
optimized corrosion control under this paragraph if the ninetieth percentile tap water lead
level is less than or equal to the practical
quantitation level for lead for two (2) consecutive six- (6-) month monitoring periods.
B. Any water system deemed to have
optimized corrosion control in accordance
with this paragraph (1)(B)2. shall continue
monitoring for lead and copper at the tap no
less frequently than once every three (3) calendar years using the reduced number of sites
specified in 10 CSR 60-15.070(3) and collecting the samples at times and locations
specified in 10 CSR 60-15.070(4)(D)4.
C. Any water system deemed to have
optimized corrosion control pursuant to this
paragraph (1)(B)2. shall notify the department in writing pursuant to 10 CSR 607.020(1)(C) of any upcoming long-term
changes in treatment or the addition of a new
source as described in that subsection. The
department must review and approve the
addition of a new source or long-term change
in water treatment before it is implemented
by the water system.
D. A system is not deemed to have
optimized corrosion control pursuant to this
paragraph (1)(B)2. and shall implement corrosion control treatment pursuant to subparagraph (1)(B)2.E. of this rule unless it meets
the copper action level.
E. Any system triggered into corrosion control because it is no longer deemed to
have optimized corrosion control under paragraph (1)(B)2. shall implement corrosion
control treatment in accordance with the
deadlines in subsection (2)(A) of this rule.
Any such large system shall adhere to the
schedule specified in subsection (2)(A) of this
rule for medium-size systems, with the time
periods for completing each step being triggered by the date the system is no longer
deemed to have optimized corrosion control
under paragraph (1)(B)2. of this rule.
(2) A small system (serving fewer than three
thousand three hundred (3,300) persons) and
a medium-size system (serving three thousand three hundred one to fifty thousand
(3,301–50,000) persons) shall complete the
corrosion control treatment steps specified as
follows unless it is deemed to have optimized
corrosion control under paragraph (2)(B)1.,
2., or 3. of this rule:
(A) Treatment Steps and Deadlines for
Small and Medium-Size Systems.
1. The system shall conduct initial tap
sampling (10 CSR 60-15.070(4)(A) and 10
CSR 60-15.080(2)) until the system either
exceeds the lead or copper action level or
becomes eligible for reduced monitoring
under 10 CSR 60-15.070(4)(D). A system
exceeding the lead or copper action level
shall recommend optimal corrosion control
treatment (10 CSR 60-15.030(1)) within six
(6) months after the end of the monitoring
period during which it exceeds one (1) of the
action levels.
2. Within twelve (12) months after the
end of the monitoring period during which a
system exceeds the lead or copper action
level, the department may require the system
to perform corrosion control studies (10 CSR
60-15.030(2)). If the department does not
require the system to perform such studies,
the department shall specify optimal corrosion control treatment within the following
time frames:
A. For medium-size systems, within
eighteen (18) months after the end of the
monitoring period during which that system
exceeds the lead or copper action level; or
B. For small systems, within twentyfour (24) months after the end of the monitoring period that system exceeds the lead or
copper action level.
3. If the department requires a system to
perform corrosion control studies under paragraph (2)(A)2. of this rule, the system shall
complete the studies (10 CSR 60-15.030(3))
within eighteen (18) months after the department requires that those studies be conducted.
4. If the system has performed corrosion
control studies under paragraph (2)(A)2. of
this rule, the department shall designate optimal corrosion control treatment (10 CSR 6015.030(4)) within six (6) months after completion of paragraph (2)(A)3. of this rule.
5. The system shall install optimal corrosion control treatment (10 CSR 60-15.030(6))
within twenty-four (24) months after the
department designates that treatment.
6. The system shall complete follow-up
sampling (10 CSR 60-15.070(4)(B) and 10
CSR 60-15.080(3)) within thirty-six (36)
months after the department designates optimal corrosion control treatment.
7. The department shall review the system’s installation of treatment and designate
optimal water quality control parameters (10
CSR 60-15.030(7)) within six (6) months
after completion of paragraph (2)(A)6. of this
rule.
8. The system shall operate in compliance with the department-designated optimal
water quality control parameters (10 CSR 6015.030(8)) and continue to conduct tap sampling as specified in 10 CSR 60-15.070(4)(C)
and 10 CSR 60-15.080(4);
(B) A small- or medium-size water system
is deemed to have optimized corrosion control and is not required to complete the applicable corrosion control treatment steps identified in this section if the system satisfies one
(1) of the following criteria. Any such system
deemed to have optimized corrosion control,
and which has treatment in place, shall continue to operate and maintain optimal corrosion control treatment and meet any requirements that the department determines appropriate to ensure optimal corrosion control
treatment is maintained.
1. The system meets the lead and copper
action levels during each of two (2) consecutive six- (6-) month monitoring periods conducted in accordance with 10 CSR 6015.070.
2. The system demonstrates to the satisfaction of the department that it has conducted activities equivalent to the corrosion control steps applicable to medium-size or small
systems under this section. If the department
makes this determination, it shall provide the
system with written notice explaining the
basis for its decision and shall specify the
water quality control parameters representing
optimal corrosion control in accordance with
10 CSR 60-15.030(7). Water systems deemed
to have optimized corrosion control under
this paragraph shall operate in compliance
with the department-designated optimal water
quality control parameters in accordance with
10 CSR 60-15.030(8) and shall continue to
conduct lead and copper tap and water quality parameter sampling in accordance with 10
CSR 60-15.070(4)(C) and 10 CSR 6015.080(4). The system shall provide the
department with the following information in
order to support a determination:
A. The results of all test samples collected for each of the water quality parameters in 10 CSR 60-15.030(3)(C);
B. A report explaining the test methods used by the water system to evaluate the
corrosion control treatments listed in 10 CSR
60-15.030(3)(A), the results of all tests conducted and the basis for the system’s selection
of optimal corrosion control treatment;
C. A report explaining how corrosion
control has been installed and how it is being
maintained to insure minimal lead and copper
concentrations at consumers’ taps; and
D. The results of tap water samples
collected in accordance with 10 CSR 6015.070 at least once every six (6) months for
one (1) year after corrosion control has been
installed.
3. Any water system is deemed to have
optimized corrosion control if it submits
results of tap water monitoring conducted in
accordance with 10 CSR 60-15.070 and
source water monitoring conducted in accordance with 10 CSR 60-15.090 that demonstrates for two (2) consecutive six- (6-) month
monitoring periods that the difference
between the ninetieth percentile tap water
lead level computed under 10 CSR 6015.010(3)(C) and the highest source water
lead concentration is less than the practical
quantitation level for lead specified in 10
CSR 60-5.010(5)(H).
A. Those systems whose highest
source water lead level is below the method
detection limit may also be deemed to have
optimized corrosion control under this paragraph if the ninetieth percentile tap water lead
level is less than or equal to the practical
quantitation level for lead for two (2) consecutive six- (6-) month monitoring periods.
B. Any water system deemed to have
optimized corrosion control in accordance
with this paragraph (2)(B)3. shall continue
monitoring for lead and copper at the tap no
less frequently than once every three (3) calendar years using the reduced number of sites
specified in 10 CSR 60-15.070(3) and collecting the samples at times and locations
specified in 10 CSR 60-15.070(4)(D)4.
C. Any water system deemed to have
optimized corrosion control pursuant to this
paragraph (2)(B)3. shall notify the department in writing pursuant to 10 CSR 607.020(1)(C) of any change in treatment or the
addition of a new source. The department
may require any such system to conduct additional monitoring or to take other action the
department deems appropriate to ensure that
such systems maintain minimal levels of corrosion in the distribution system.
D. A system is not deemed to have
optimized corrosion control pursuant to this
paragraph (2)(B)3., and shall implement corrosion control treatment pursuant to subparagraph (2)(B)3.E. of this rule unless it meets
the copper action level.
E. Any system triggered into corrosion control because it is no longer deemed to
have optimized corrosion control under paragraph (2)(B)3. shall implement corrosion
control treatment in accordance with the
deadlines in subsection (2)(A) of this rule.
Any such large system shall adhere to the
schedule specified in subsection (2)(A) of this
rule for medium-size systems, with the time
periods for completing each step being triggered by the date the system is no longer
deemed to have optimized corrosion control
under paragraph (2)(B)3. of this rule; and
(C) Any small- or medium-size water system that is required to complete the corrosion
control steps due to its exceedance of the lead
or copper action level may cease completing
the treatment steps whenever the system
meets both action levels during each of two
(2) consecutive monitoring periods conducted
pursuant to 10 CSR 60-15.070 and submits
the results to the department. If any such
water system after that exceeds the lead or
copper action level during any monitoring
period, the system (or the department, as the
case may be) shall recommence completion
of the applicable treatment steps, beginning
with the first treatment step which was not
previously completed in its entirety. The
department may require a system to repeat
treatment steps previously completed by the
system where the department determines that
this is necessary to implement properly the
treatment requirements of this section. The
department shall notify the system in writing
of the determination and explain the basis for
its decision. The requirement for any small-
or medium-size system to implement corrosion control treatment steps (including systems deemed to have optimized corrosion
control) is triggered whenever any small- or
medium-size system exceeds the lead or copper action level.
AUTHORITY: section 640.100, RSMo 2016.*
Original rule filed Aug. 4, 1992, effective
May 6, 1993. Amended: Filed Aug. 14, 2001,
effective April 30, 2002. Amended: Filed Oct.
17, 2011, effective May 30, 2012. Amended:
Filed March 15, 2019, effective Nov. 30,
2019.
*Original authority: 640.100, RSMo 1939, amended 1978,
1981, 1982, 1988, 1989, 1992, 1993, 1995, 1996, 1998,
1999, 2002, 2006, 2012, 2014.