20 CSR 4240-22.040
Supply-Side Resource Analysis
PURPOSE: This rule establishes minimum
standards for the scope and level of detail
required in supply-side resource analysis.
(1) The utility shall evaluate all existing supply-side resources and identify a variety of
potential supply-side resource options which
the utility can reasonably expect to use, develop, implement, or acquire, and, for purposes
of integrated resource planning, all such supply-side resources shall be considered as
potential supply-side resource options. These
potential supply-side resource options include
full or partial ownership of new plants using
existing generation technologies; full or partial ownership of new plants using new generation technologies, including technologies
expected to become commercially available
within the twenty (20)-year planning horizon;
renewable energy resources on the utility-side
of the meter, including a wide variety of
renewable generation technologies; technologies for distributed generation; life extension
and refurbishment at existing generating
plants; enhancement of the emission controls
at existing or new generating plants; purchased power from bi-lateral transactions and
from organized capacity and energy markets;
generating plant efficiency improvements
which reduce the utility’s own use of energy;
and upgrading of the transmission and distribution systems to reduce power and energy
losses. The utility shall collect generic cost
and performance information sufficient to
fairly analyze and compare each of these
potential supply-side resource options,
including at least those attributes needed to
assess capital cost, fixed and variable operation and maintenance costs, probable environmental costs, and operating characteristics.
(2) The utility shall describe and document
its analysis of each potential supply-side
resource option referred to in section (1). The
utility may conduct a preliminary screening
analysis to determine a short list of preliminary supply-side candidate resource options,
or it may consider all of the potential supplyside resource options to be preliminary supply-side candidate resource options pursuant
to subsection (2)(C). All costs shall be
expressed in nominal dollars.
(A) Cost rankings of each potential supplyside resource option shall be based on estimates of the installed capital costs plus fixed
and variable operation and maintenance costs
levelized over the useful life of the potential
supply-side resource option using the utility
discount rate. The utility shall include the
costs of ancillary and/or back-up sources of
supply required to achieve necessary reliability levels in connection with intermittent
and/or uncontrollable sources of generation
(i.e., wind and solar).
(B) The probable environmental costs of
each potential supply-side resource option
shall be quantified by estimating the cost to
the utility to comply with additional environmental legal mandates that may be imposed at
some point within the planning horizon. The
utility shall identify a list of environmental
pollutants for which, in the judgment of the
utility decision-makers, legal mandates may
be imposed during the planning horizon
which would result in compliance costs that
could significantly impact utility rates. The
utility shall specify a subjective probability
that represents utility decision-maker’s judgment of the likelihood that legal mandates
requiring additional levels of mitigation will
be imposed at some point within the planning
horizon. The utility, based on these probabilities, shall calculate an expected mitigation
cost for each identified pollutant.
(C) The utility shall indicate which potential supply-side resource options it considers
to be preliminary supply-side candidate
resource options. Any utility using the preliminary screening analysis to identify preliminary supply-side candidate resource
options shall rank all preliminary supply-side
candidate resource options based on estimates of the utility costs and also on utility
costs plus probable environmental costs. The
utility shall—
1. Provide a summary table showing
each potential supply-side resource option
and the utility cost and the probable environmental cost for each potential supply-side
resource option and an assessment of whether
each potential supply-side resource option
qualifies as a utility renewable energy
resource; and
2. Explain which potential supply-side
resource options are eliminated from further
consideration and the reasons for their elimination.
(3) The utility shall describe and document
its analysis of the interconnection and any
other transmission requirements associated
with the preliminary supply-side candidate
resource options identified in subsection
(2)(C).
(A) The analysis shall include the identification of transmission constraints, as estimated pursuant to 4 CSR 240-22.045(3),
whether within the Regional Transmission
Organization’s (RTO’s) footprint, on an interconnected RTO, or a transmission system that
is not part of an RTO. The purpose of this
analysis shall be to ensure that the transmission network is capable of reliably supporting
the
preliminary
supply-side
candidate
resource options under consideration, that the
costs of the transmission system investments
associated with preliminary supply-side candidate resource options, as estimated pursuant to 4 CSR 240-22.045(3), are properly
considered and to provide an adequate foundation of basic information for decisions to
include, but not be limited to, the following:
1. Joint ownership or participation in
generation construction projects;
2. Construction of wholly-owned generation facilities;
3. Participation in major refurbishment,
life extension, upgrading, or retrofitting of
existing generation facilities;
4. Improvements on its transmission and
distribution system to increase efficiency and
reduce power losses;
5. Acquisition of existing generating
facilities; and
6. Opportunities for new long-term
power purchases and sales, and short-term
power purchases that may be required for
bridging the gap between other supply
options, both firm and nonfirm, that are likely to be available over all or part of the planning horizon.
(B) This analysis shall include the identification of any output limitations imposed on
existing or new supply-side resources due to
transmission and/or distribution system
capacity constraints, in order to ensure that
supply-side candidate resource options are
evaluated in accordance with any such constraints.
(4) All preliminary supply-side candidate
resource options which are not eliminated
shall be identified as supply-side candidate
resource options. The supply-side candidate
resource options that the utility passes on for
further evaluation in the integration process
shall represent a wide variety of supply-side
resource options with diverse fuel and generation technologies, including a wide range of
renewable technologies and technologies suitable for distributed generation.
(A) The utility shall describe and document its process for identifying and analyzing
potential supply-side resource options and
preliminary supply-side candidate resource
options and for choosing its supply-side candidate resource options to advance to the integration analysis.
(B) The utility shall indicate which, if any,
of the preliminary supply-side candidate
resource options identified in subsection
(2)(C) are eliminated from further consideration on the basis of the interconnection and
other transmission analysis and shall explain
the reasons for their elimination.
(C) The utility shall include the cost of
interconnection and any other transmission
requirements, in addition to the utility cost
and probable environmental cost, in the cost
of supply-side candidate resource options
advanced for purposes of developing the
alternative resource plans required by 4 CSR
240-22.060(3).
(5) The utility shall develop, and describe
and document, ranges of values and probabilities for several important uncertain factors
related to supply-side candidate resource
options identified in section (4). These cost
estimates shall include at least the following
elements, as applicable to the supply-side
candidate resource option:
(A) Fuel price forecasts, including fuel
delivery costs, over the planning horizon for
the appropriate type and grade of primary
fuel and for any alternative fuel that may be
practical as a contingency option;
(B) Estimated capital costs including engineering design, construction, testing, startup,
and certification of new facilities or major
upgrades, refurbishment, or rehabilitation of
existing facilities;
(C) Estimated annual fixed and variable
operation and maintenance costs over the
planning horizon for new facilities or for
existing facilities that are being upgraded,
refurbished, or rehabilitated;
(D) Forecasts of the annual cost or value of
emission allowances to be used or produced
by each generating facility over the planning
horizon;
(E) Annual fixed charges for any facility to
be included in the rate base, or annual payment schedule for leased or rented facilities;
and
(F) Estimated costs of interconnection or
other transmission requirements associated
with each supply-side candidate resource
option.
AUTHORITY: sections 386.040, 386.250,
386.610, and 393.140, RSMo 2000.* This
rule originally filed as 4 CSR 240-22.040.
Original rule filed June 12, 1992, effective
May 6, 1993. Amended: Filed Oct. 25, 2010,
effective June 30, 2011. Moved to 20 CSR
4240-22.040, effective Aug. 28, 2019.