20 CSR 4240-22.045
Transmission and Distribution Analysis
PURPOSE: This rule specifies the minimum
standards for the scope and level of detail
required for transmission and distribution
network analysis and reporting.
(1) The electric utility shall describe and document its consideration of the adequacy of the
transmission and distribution networks in fulfilling the fundamental planning objective set
out in 4 CSR 240-22.010. Each utility shall
consider, at a minimum, improvements to the
transmission and distribution networks that—
(A) Reduce transmission power and energy
losses. Opportunities to reduce transmission
network losses are among the supply-side
resources evaluated pursuant to 4 CSR 24022.040(3). The utility shall assess the age,
condition, and efficiency level of existing
transmission and distribution facilities and
shall analyze the feasibility and cost-effectiveness of transmission and distribution network loss-reduction measures. This provision
shall not be construed to require a detailed
line-by-line analysis of the transmission and
distribution systems, but is intended to
require the utility to identify and analyze
opportunities for efficiency improvements in
a manner that is consistent with the analysis
of other supply-side resource options;
(B) Interconnect new generation facilities.
The utility shall assess the need to construct
transmission facilities to interconnect any
new generation pursuant to 4 CSR 24022.040(3) and shall reflect those transmission
facilities in the cost benefit analyses of the
resource options;
(C) Facilitate power purchases or sales.
The utility shall assess the transmission
upgrades needed to purchase or sell pursuant
to 4 CSR 240-22.040(3). An estimate of the
portion of costs of these upgrades that are
allocated to the utility shall be reflected in the
analysis of preliminary supply-side candidate
resource options; and
(D) Incorporate advanced transmission
and distribution network technologies affecting supply-side resources or demand-side
resources. The utility shall assess transmission and distribution improvements that may
become available during the planning horizon that facilitate or expand the availability
and cost effectiveness of demand-side
resources or supply-side resources. The costs
and capabilities of these advanced transmission and distribution technologies shall be
reflected in the analyses of each resource
option.
(2) Avoided Transmission and Distribution
Cost. The utility shall develop, describe,
and document an avoided transmission
capacity cost and an avoided distribution
capacity cost. The avoided transmission and
distribution capacity costs are components
of the avoided demand cost pursuant to 4
CSR 240-22.050(5)(A).
(3) Transmission Analysis. The utility shall
compile information and perform analyses of
the transmission networks pertinent to the
selection of a resource acquisition strategy.
The utility and the Regional Transmission
Organization (RTO) to which it belongs both
participate in the process for planning transmission upgrades.
(A) The utility shall provide, and describe
and document, its—
1. Assessment of the cost and timing of
transmission upgrades to reduce congestion
and/or losses, to interconnect generation, to
facilitate power purchases and sales, and to
otherwise maintain a viable transmission network;
2. Assessment of transmission upgrades
to incorporate advanced technologies;
3. Estimate of avoided transmission
costs;
4. Estimate of the portion and amount of
costs of proposed regional transmission
upgrades that would be allocated to the utility, and if such costs may differ due to plans
for the construction of facilities by an affiliate
of the utility instead of the utility itself, then
an estimate, by upgrade, of this cost difference;
5. Estimate of any revenue credits the
utility will receive in the future for previously built or planned regional transmission
upgrades; and
6. Estimate of the timing of needed
transmission and distribution resources and
any transmission resources being planned by
the RTO primarily for economic reasons that
may impact the alternative resource plans of
the utility.
(B) The utility may use the RTO transmission expansion plan in its consideration of the
factors set out in subsection (3)(A) if all of
the following conditions are satisfied:
1. The utility actively participates in the
development of the RTO transmission plan;
2. The utility reviews the RTO transmission overall expansion plans each year to
assess whether the RTO transmission expansion plans, in the judgment of the utility decision-makers, are in the interests of the utility’s Missouri customers;
3. The utility reviews the portion of RTO
transmission expansion plans each year within its service territory to assess whether the
RTO transmission expansion plans pertaining
to projects that are partially- or fully-driven
by economic considerations (i.e., projects
that are not solely or primarily based on reliability considerations), in the judgment of the
utility decision-makers, are in the interests of
the utility’s Missouri customers;
4. The utility documents and describes
its review and assessment of the RTO overall
and utility-specific transmission expansion
plans; and
5. If any affiliate of the utility intends to
build transmission within the utility’s service
territory where the project(s) are partially- or
fully-driven by economic considerations, then
the utility shall explain why such affiliatebuilt transmission is in the best interest of the
utility’s Missouri customers and describe and
document the analysis performed by the utility to determine whether such affiliate-built
transmission is in the interest of the utility’s
Missouri customers.
(C) The utility shall provide copies of the
RTO expansion plans, its assessment of the
plans, and any supplemental information
developed by the utility to fulfill the requirements in subsection (3)(B) of this rule.
(D) The utility shall provide a report for
consideration in 4 CSR 240-22.040(3) that
identifies the physical transmission upgrades
needed to interconnect generation, facilitate
power purchases and sales, and otherwise
maintain a viable transmission network,
including:
1. A list of the transmission upgrades
needed to physically interconnect a generation source within the RTO footprint;
2. A list of the transmission upgrades
needed to enhance deliverability from a point
of delivery within the RTO including requirements for firm transmission service from the
point of delivery to the utility’s load and
requirements for financial transmission rights
from a point of delivery within the RTO to the
utility’s load;
3. A list of transmission upgrades needed to physically interconnect a generation
source located outside the RTO footprint;
4. A list of the transmission upgrades
needed to enhance deliverability from a generator located outside the RTO including
requirements for firm transmission service to
a point of delivery within the RTO footprint
and requirements for financial transmission
rights to a point of delivery within the RTO
footprint;
5. The estimated total cost of each transmission upgrade; and
6. The estimated fraction of the total
cost and amount of each transmission
upgrade allocated to the utility.
(4) Analysis Required for Transmission and
Distribution Network Investments to Incorporate Advanced Technologies.
(A) The utility shall develop, and describe
and document, plans for transmission
upgrades to incorporate advanced transmission technologies as necessary to optimize
the investment in the advanced technologies
for transmission facilities owned by the utility. The utility may use the RTO transmission
expansion plan in its consideration of
advanced transmission technologies if all of
the conditions in paragraphs (3)(B)1. through
(3)(B)3. are satisfied.
(B) The utility shall develop, and describe
and document, plans for distribution network
upgrades as necessary to optimize its investment in advanced distribution technologies.
(C) The utility shall describe and document its optimization of investment in
advanced transmission and distribution technologies based on an analysis of—
1. Total costs and benefits, including:
A. Costs of the advanced grid investments;
B. Costs of the non-advanced grid
investments;
C. Reduced resource costs through
enhanced demand response resources and
enhanced integration of customer-owned generation resources; and
D. Reduced supply-side production
costs;
2. Cost effectiveness, including:
A. The monetary values of all incremental costs of the energy resources and
delivery system based on advanced grid technologies relative to the costs of the energy
resources and delivery system based on nonadvanced grid technologies;
B. The monetary values of all incremental benefits of the energy resources and
delivery system based on advanced grid technologies relative to the costs and benefits of
the energy resources and delivery system
based on non-advanced grid technologies;
and
C. Additional non-monetary factors
considered by the utility;
3. Societal benefit, including:
A. More consumer power choices;
B. Improved utilization of existing
resources;
C. Opportunity to reduce cost in
response to price signals;
D. Opportunity to reduce environmental impact in response to environmental
signals;
4. Any other factors identified by the
utility; and
5. Any other factors identified in the
special contemporary issues process pursuant
to 4 CSR 240-22.080(4) or the stakeholder
group process pursuant to 4 CSR 24022.080(5).
(D) Before the utility includes nonadvanced transmission and distribution grid
technologies in its triennial compliance filing
or annual update filing, the utility shall—
1. Conduct an analysis which demonstrates that investment in each non-advanced
transmission and distribution upgrade is more
beneficial to consumers than an investment in
the
equivalent
upgrade
incorporating
advanced grid technologies. The utility may
rely on a generic analysis as long as it verifies its applicability; and
2. Describe and document the analysis.
(E) The utility shall develop, describe, and
document the utility’s cost benefit analysis
and implementation of advanced grid technologies to include:
1. A description of the utility’s efforts at
incorporating advanced grid technologies into
its transmission and distribution networks;
2. A description of the impact of the
implementation of distribution advanced grid
technologies on the selection of a resource
acquisition strategy; and
3. A description of the impact of the
implementation of transmission advanced
grid technologies on the selection of a
resource acquisition strategy.
(5) The electric utility shall identify and
describe any affiliate or other relationship
with transmission planning, designing, engineering, building, and/or construction management companies that impact or may be
impacted by the electric utility. Any description and documentation requirements in sections (1) through (4) also apply to any affiliate
transmission
planning,
designing,
engineering, building, and/or construction
management company or other transmission
planning, designing, engineering, building,
and/or construction management company
currently participating in transmission works
or transmission projects for and/or with the
electric utility.
(6) The electric utility shall identify and
describe any transmission projects under consideration by an RTO for the electric utility’s
service territory.
AUTHORITY: sections 386.040, 386.250,
386.610, and 393.140, RSMo 2000.* This
rule originally filed as 4 CSR 240-22.045.
Original rule filed Oct. 25, 2010, effective
June 30, 2011. Moved to 20 CSR 424022.045, effective Aug. 28, 2019.