20 CSR 4240-3.205
Filing Requirements for Gas Utility Applications for Certificates of Convenience and Necessity
PURPOSE: Applications to the commission requesting that the
commission grant a certificate of convenience and necessity must
meet the requirements set forth in this rule. As noted in the rule,
additional requirements pertaining to such applications are set
forth in 4 CSR 240-2.060(1).
(1) In addition to the requirements of 4 CSR 240-2.060(1), applications for a certificate of convenience and necessity by a gas
company shall include the following information:
(A) If the application is for a service area—
1. A statement as to the same or similar utility service,
regulated and nonregulated, available in the area requested;
2. If there are ten (10) or more residents or landowners, the
name and address of no fewer than ten (10) persons residing in
AND INSURANCE
the proposed service area or of no fewer than ten (10) landowners in the event there are no residences in the area, or, if there
are fewer than ten (10) residents or landowners, the name and
address of all residents and landowners;
3. The legal description of the area to be certificated;
4. A plat drawn to a scale of one-half inch (1/2") to the mile
on maps comparable to county highway maps issued by the
Missouri Department of Transportation or a plat drawn to a
scale of two thousand feet (2,000') to the inch; and
5. A feasibility study containing plans and specifications
for the utility system and estimated cost of the construction of
the utility system during the first three (3) years of construction; plans for financing; proposed rates and charges and an
estimate of the number of customers, revenues and expenses
during the first three (3) years of operations;
(B) If the application is for gas transmission lines—
1. A description of the route of construction and a list of
all electric and telephone lines of regulated and nonregulated
utilities, railroad tracks or any underground facility, as defined
in section 319.015, RSMo, which the proposed construction will
cross;
2. The plans and specifications for the complete construction project and estimated cost of the construction project or a
statement of the reasons the information is currently unavailable and a date when it will be furnished; and
3. Plans for financing;
(C) When no evidence of approval of the affected governmental bodies is necessary, a statement to that effect;
(D) When approval of the affected governmental bodies is
required, evidence must be provided as follows:
1. When consent or franchise by a city or county is required, approval shall be shown by a certified copy of the document granting the consent or franchise, or an affidavit of the
applicant that consent has been acquired; and
2. A certified copy of the required approval of other governmental agencies; and
(E) The facts showing that the granting of the application is
required by the public convenience and necessity.
(2) If any of the items required under this rule are unavailable
at the time the application is filed, they shall be furnished prior
to the granting of the authority sought.
AUTHORITY: section 386.250, RSMo 2000.* This rule originally
filed as 4 CSR 240-3.205. Original rule filed Aug. 16, 2002, effective
April 30, 2003. Moved to 20 CSR 4240-3.205, effective Aug. 28,
2019.