20 CSR 4240-40.020
Incident, Annual, and Safety-Related Condition Reporting Requirements
PURPOSE: This rule prescribes requirements and procedures
for reporting certain gas-related incidents and safety-related
conditions and for filing annual reports. It applies to gas systems
subject to the safety jurisdiction of the Public Service Commission.
PUBLISHER’S NOTE: The secretary of state has determined that
publication of the entire text of the material that is incorporated by
reference as a portion of this rule would be unduly cumbersome or
expensive. This material as incorporated by reference in this rule
shall be maintained by the agency at its headquarters and shall
be made available to the public for inspection and copying at no
more than the actual cost of reproduction. This note applies only
to the reference material. The entire text of the rule is printed here.
AGENCY NOTE: This rule is similar to the Minimum Federal
Safety Standards contained in 49 CFR part 191, Code of Federal
Regulations. Parallel citations to Part 191 are provided for gas
operator convenience and to promote public safety.
(1) Scope. (191.1)
(A) This rule prescribes requirements for the reporting of
incidents, safety-related conditions, annual pipeline summary
data, National Operator Registry information, and other miscellaneous conditions by operators of gas pipeline facilities
and underground natural gas storage facilities located in Missouri and under the jurisdiction of the commission. This rule
applies to onshore gathering lines, including Type R gathering
lines as determined in 20 CSR 4240-40.030(1)(E)1.
(B) Subsections (11)(B) and (11)(C) and section (12) do not apply
to the onshore gathering of gas—
1. Through a pipeline that operates at less than zero (0)
pound per square inch gauge (psig) (0 kPa); or
2. Through a pipeline that is not a regulated onshore gathering line.
(2) Definitions. (191.3) As used in this rule and in the PHMSA
forms referenced in this rule—
(A) Administrator means the administrator of PHMSA or his
AND INSURANCE
or her delegate;
(B) Commission means the Public Service Commission.
Designated commission personnel means the Pipeline Safety
Program Manager at the address contained in subsection (5)
(E) for correspondence and means the list of staff personnel
supplied to operators for telephonic notices;
(C) Confirmed discovery means when it can be reasonably
determined, based on information available to the operator at
the time a reportable event has occurred, even if only based on
a preliminary evaluation;
(D) Federal incident means any of the following events:
1. An event that involves a release of gas from a pipeline,
gas from an underground natural gas storage facility (UNGSF),
liquefied natural gas (LNG), liquefied petroleum gas, refrigerant
gas, or gas from an LNG facility, and that results in one (1) or
more of the following consequences:
A. A death or personal injury necessitating inpatient
hospitalization; or
B. Estimated property damage of one hundred forty-five
thousand four hundred dollars ($145,400) or more, including
loss to the operator and others, or both, but excluding the cost
of gas lost; or
C. Unintentional estimated gas loss of three (3) million
cubic feet or more;
2. An event that results in an emergency shutdown of
an LNG facility or an UNGSF. Activation of an emergency
shutdown system for reasons other than an actual emergency
does not constitute an incident; or
3. An event that is significant, in the judgment of the operator, even though it did not meet the criteria of paragraph (2)
(D)1. or (2)(D)2.
(E) Gas means natural gas, flammable gas, manufactured
gas, or gas which is toxic or corrosive;
(F) LNG facility means a pipeline facility that is used for
liquefying natural gas or synthetic gas or transferring, storing,
or vaporizing liquefied natural gas;
(G) LNG plant means an LNG facility or system of LNG
facilities functioning as a unit;
(H) Master meter system means a pipeline system for
distributing gas within, but not limited to, a definable area,
such as a mobile home park, housing project, or apartment
complex, where the operator purchases metered gas from an
outside source for resale through a gas distribution pipeline
system. The gas distribution pipeline system supplies the
ultimate consumer who either purchases the gas directly
through a meter or by other means, for instance, by rents;
(I) Municipality means a city, village, or town;
(J) Operator means a person who engages in the transportation
of gas;
(K) Person means any individual, firm, joint venture,
partnership,
corporation,
association,
county,
state,
municipality, political subdivision, cooperative association,
or joint stock association, and includes any trustee, receiver,
assignee, or personal representative of them;
(L) Pipeline or pipeline system means all parts of those
physical facilities through which gas moves in transportation
including, but not limited to, pipe, valves, and other
appurtenances attached to pipe, compressor units, metering
stations, regulator stations, delivery stations, holders, and
fabricated assemblies;
(M) PHMSA means the Pipeline and Hazardous Materials
Safety Administration of the United States Department of
Transportation;
(N) Regulated onshore gathering means a Type A, Type B, or
Type C gas gathering pipeline system as determined in 20 CSR
4240-40.030(1)(E)1.;
(O) Reporting-regulated gathering means a Type R gathering
line as determined in 20 CSR 4240-40.030(1)(E)1. A Type R gathering line is subject only to this rule;
(P) Transportation of gas means the gathering, transmission,
or distribution of gas by pipeline, or the storage of gas, in or
affecting intrastate, interstate, or foreign commerce; and
(Q) Underground natural gas storage facility (UNGSF)
means a gas pipeline facility that stores natural gas in an
underground facility incidental to the transportation of natural
gas, including—
1. A depleted hydrocarbon reservoir, an aquifer reservoir,
or a solution-mined cavern; and
2. In addition to the reservoir or cavern, a UNGSF includes
injection, withdrawal, monitoring, and observation wells;
wellbores and downhole components; wellheads and associated wellhead piping; wing-valve assemblies that isolate the
wellhead from connected piping beyond the wing-valve assemblies; and any other equipment, facility, right-of-way, or
building used in the underground storage of natural gas.
(3) Immediate Notice of Federal Incidents. (191.5)
(A) At the earliest practicable moment following discovery,
but no later than one (1) hour after confirmed discovery, each
operator shall give notice, in accordance with subsection (3)(B),
of each federal incident as defined in section (2).
(B) Each notice required by subsection (3)(A) must be made to
the National Response Center either by telephone to (800) 4248802 or electronically at www.nrc.uscg.mil and must include
the following information:
1. Names of operator and person making report and their
telephone numbers;
2. Location of the incident;
3. Time of the incident;
4. Number of fatalities and personal injuries, if any; and
5. All other significant facts known by the operator that are
relevant to the cause of the incident or extent of the damages.
(C) Within forty-eight (48) hours after the confirmed
discovery of an incident, to the extent practicable, an operator
must revise or confirm its initial telephonic notice required
in subsection (3)(B) with an estimate of the amount of gas
released, an estimate of the number of fatalities and injuries,
and all other significant facts that are known by the operator
that are relevant to the cause of the incident or extent of the
damages. If there are no changes or revisions to the initial
report, the operator must confirm the estimates in its initial
report.
(4) Immediate Notice of Missouri Incidents.
(A) Within two (2) hours following discovery by the operator,
or as soon thereafter as practicable if emergency efforts to
protect life and property would be hindered, each gas operator
must notify designated commission personnel by telephone of
the following events within areas served by the operator:
1. An event that involves a release of gas involving the
operator’s actions or pipeline system, or where there is a
suspicion by the operator that the event may involve a release
of gas involving the operator’s actions or pipeline system, and
results in one (1) or more of the following consequences:
A. A death;
B. A personal injury involving medical care administered
in an emergency room or health care facility, whether inpatient
or outpatient, beyond initial treatment and prompt release
after evaluation by a health care professional; or
C. Estimated property damage of nineteen thousand
two hundred dollars ($19,200) or more, including loss to the gas
operator or others, or both, and including the cost of gas lost;
2. An event that is significant, in the judgement of the
operator, even though it did not meet the criteria of paragraph
(4)(A)1.; or
3. An event that is reported as a federal incident under
section (3).
(B) Exceeding the two- (2-) hour notification time period in
subsection (4)(A) requires submission of a written explanation
of reasons with the operator’s incident report when submitting
the report to designated commission personnel. See section (5)
for report submission requirements.
(5) Report Submission Requirements. (191.7)
(A) Reports to PHMSA.
1. An operator must submit each report required by
sections (6)–(11) electronically to the Pipeline and Hazardous
Materials Safety Administration at http://portal.phmsa.dot.gov/
pipeline unless an alternative reporting method is authorized
in accordance with subsection (5)(D).
2. A copy of each online submission to PHMSA must also be
submitted concurrently to designated commission personnel.
The copy submitted to designated commission personnel must
be clearly marked to indicate the date of the online submission
to PHMSA.
(B) Missouri incident reports.
1. This subsection applies to events that meet the criteria
in subsection (4)(A) but are not a federal incident reported
under subsection (5)(A). Within thirty (30) days of a telephone
notification made under subsection (4)(A), each gas operator
must submit the applicable U.S. Department of Transportation
Form PHMSA F 7100.1, PHMSA F 7100.2, or PHMSA F 7100.3 to
designated commission personnel. Additional information
required in subsections (6)(B) and (9)(B) for federal incidents is
also required for these events.
2. The incident report forms for gas distribution systems
(PHMSA F 7100.1), gas transmission pipeline systems, gas
gathering pipeline systems, and underground natural gas
storage facilities (PHMSA F 7100.2), Type R (reporting-regulated)
gas gathering pipeline systems (PHMSA F 7100.2.2), and LNG
facilities (PHMSA F 7100.3) are incorporated by reference in
subsection (5)(G).
(C) Safety-related conditions. An operator must submit concurrently to PHMSA and designated commission personnel a
safety-related condition report required by section (12). A safety-related condition report can be submitted by electronic mail
or telefacsimile (fax) as provided for in section (13).
(D) Alternative reporting method.
1. If electronic reporting imposes an undue burden and
hardship, an operator may submit a written request for an
alternative reporting method to the Information Resources
Manager, Office of Pipeline Safety, Pipeline and Hazardous
Materials Safety Administration, PHP-10, 1200 New Jersey Avenue
SE, Washington DC 20590-0001. The request must describe the
undue burden and hardship. PHMSA will review the request and
may authorize, in writing, an alternative reporting method. An
authorization will state the period for which it is valid, which
may be indefinite. An operator must contact PHMSA at (202)
366-8075, or electronically to informationresourcesmanager@
dot.gov or make arrangements for submitting a report that is
due after a request for alternative reporting is submitted, but
before an authorization or denial is received.
2. A copy of each report using an alternate reporting
method must also be submitted concurrently to designated
commission personnel. The copy submitted to designated
commission personnel must be clearly marked to indicate the
date of submission to PHMSA.
(E) Address for designated commission personnel. The
address for the designated commission personnel is Pipeline
Safety Program Manager, Missouri Public Service Commission,
PO Box 360, Jefferson City, MO 65102. The email address
for designated commission personnel is PipelineSafetyProgramManager@psc.mo.gov.
(F) National Pipeline Mapping System (NPMS). An operator
must provide the NPMS data to the address identified in the
NPMS Operator Standards manual available at www.npms.
phmsa.dot.gov or by contacting the PHMSA geographic
information systems manager at (202) 366–4595.
(G) Forms incorporated by reference.
1. The following forms are incorporated by reference and
made part of this rule.
A. U.S. Department of Transportation Form PHMSA F
1000.1, revised March 2022. The PHMSA F 1000.1 form is the
Operator Identification (OPID) Assignment Request form and
does not include any amendments or additions to the March
2022 version.
B. U.S. Department of Transportation Form PHMSA F
1000.2, revised March 2022. The PHMSA F 1000.2 form is the
National Registry Notification form for reporting changes
including operator name change, change in entity operating,
shared safety program change, change in ownership for gas
facilities, construction or rehabilitation of gas facilities, change
in ownership for LNG, and construction for LNG. The PHMSA F
1000.2 form does not include any amendments or additions to
the March 2022 version.
C. U.S. Department of Transportation Form PHMSA F
7100.1, revised September 2023. The PHMSA F 7100.1 form is the
incident report form for gas distribution systems and does not
include any amendments or additions to the September 2023
version.
D. U.S. Department of Transportation Form PHMSA F
7100.1-1, revised June 2023. The PHMSA F 7100.1-1 form is the
annual report form for gas distribution systems and does not
include any amendments or additions to the June 2023 version.
E. Reserved.
F. U.S. Department of Transportation Form PHMSA F
7100.2, revised September 2023. The PHMSA F 7100.2 form is
the incident report form for gas transmission pipeline systems,
gas gathering pipeline systems, and underground natural gas
storage facilities and does not include any amendments or
additions to the September 2023 version.
G. U.S. Department of Transportation Form PHMSA F
7100.2-1, revised August 2023. The PHMSA F 7100.2-1 form is
the annual report form for gas transmission and gathering
pipeline systems and does not include any amendments or
additions to the August 2023 version.
H. U.S. Department of Transportation Form PHMSA F
7100.3, revised September 2023. The PHMSA F 7100.3 form is
the incident report form for LNG facilities and does not include
any amendments or additions to the September 2023 version.
I. U.S. Department of Transportation Form PHMSA F
7100.3-1, revised October 2014. The PHMSA F 7100.3-1 form is the
annual report form for LNG facilities and does not include any
amendments or additions to the October 2014 version.
J. U.S. Department of Transportation Form PHMSA F
7100.4-1, approved March 1, 2022. The PHMSA F 7100.4-1 form
is the annual report form for underground natural gas storage
facilities and does not include any amendments or additions to
the March 1, 2022, version.
K. U.S. Department of Transportation Form PHMSA F
AND INSURANCE
7100.2.2, approved March 2022. The PHMSA F 7100.2.2 form
is the incident report form for Type R (reporting-regulated)
gas gathering pipeline systems and does not include any
amendments or additions to the March 2022 version.
L. U.S. Department of Transportation Form PHMSA F
7100.2-3, approved March 2022. The PHMSA F 7100.2-3 form
is the annual report form for Type R (reporting-regulated)
gas gathering pipeline systems and does not include any
amendments or additions to the March 2022 version.
2. The forms listed in paragraph (5)(G)1. are published by
the U.S. Department of Transportation Office of Pipeline Safety,
PHP-10, 1200 New Jersey Avenue SE, Washington, DC 205900001. The forms are available at https://www.phmsa.dot.gov/
forms/operator-reports-submitted-phmsa-forms-and-instructions or upon request from the pipeline safety program manager at the address given in subsection (5)(E).
(6) Distribution System—Federal Incident Report. (191.9)
(A) Except as provided in subsection (6)(C), each operator of
a distribution pipeline system must submit U.S. Department of
Transportation Form PHMSA F 7100.1 as soon as practicable but
not more than thirty (30) days after detection of an incident
required to be reported under section (3). See the report submission requirements in subsection (5)(A). The incident report
form is incorporated by reference in subsection (5)(G).
(B) When additional relevant information is obtained after
the report is submitted under subsection (6)(A), the operator
shall make supplementary reports, as deemed necessary, with
a clear reference by date and subject to the original report.
(C) The incident report required by this section need not be
submitted with respect to master meter systems.
(7) Distribution System—Annual Report.
(A) Annual report. (191.11)
1. Except as provided in paragraph (7)(A)3., each operator
of a distribution pipeline system must submit an annual report
for that system on U.S. Department of Transportation Form
PHMSA F 7100.1-1. This report must be submitted each year, not
later than March 15, for the preceding calendar year. See the
report submission requirements in subsection (5)(A).
2. The annual report form is incorporated by reference in
subsection (5)(G).
3. The annual report requirement in this subsection does
not apply to a master meter system, a petroleum gas system
that serves fewer than one hundred (100) customers from a single source, or an individual service line directly connected to a
production pipeline or a gathering line other than a regulated
gathering line as determined in 20 CSR 4240-40.030(1)(E)1.
(B) Reserved.
(8) Distribution Systems Reporting Transmission Pipelines—
Transmission or Gathering Systems Reporting Distribution
Pipelines. (191.13) Each operator primarily engaged in gas
distribution who also operates gas transmission or gathering
pipelines shall submit separate reports for these pipelines
as required by sections (9) and (10). Each operator primarily
engaged in gas transmission or gathering who also operates
gas distribution pipelines shall submit separate reports for
these pipelines as required by sections (6) and (7).
(9) Transmission Systems; Gathering Systems; Liquefied
Natural Gas Facilities; and Underground Natural Gas Storage
Facilities—Federal Incident Report. (191.15)
(A) Transmission or gathering.
1. Each operator of a transmission or a regulated onshore
gathering pipeline system must submit U.S. Department of
Transportation Form PHMSA F 7100.2 as soon as practicable but
not more than thirty (30) days after detection of an incident
required to be reported under section (3). See the report
submission requirements in subsection (5)(A). The incident
report form is incorporated by reference in subsection (5)(G).
2. Each operator of a reporting-regulated gathering
pipeline system must submit U.S. Department of Transportation
Form PHMSA F 7100.2.2 as soon as practicable but not more
than thirty (30) days after detection of an incident required to
be reported under section (3) that occurs after May 16, 2022. See
the report submission requirements in subsection (5)(A). The
incident report form is incorporated by reference in subsection
(5)(G).
(B) LNG. Each operator of a liquefied natural gas plant or
facility must submit U.S. Department of Transportation Form
PHMSA F 7100.3 as soon as practicable but not more than thirty
(30) days after detection of an incident required to be reported
under section (3). See the report submission requirements in
subsection (5)(A). The incident report form is incorporated by
reference in subsection (5)(G).
(C) Underground natural gas storage facility. Each operator
of an UNGSF must submit U.S. Department of Transportation
Form PHMSA F 7100.2 as soon as practicable but not more than
thirty (30) days after detection of an incident required to be
reported under section (3). See the report submission requirements in subsection (5)(A). The incident report form is incorporated by reference in subsection (5)(G).
(D) Supplemental report. Where additional related information is obtained after an operator submits a report under
subsection (9)(A), (9)(B), or (9)(C), the operator must make a supplemental report as soon as practicable with a clear reference
by date to the original report.
(10) Transmission Systems; Gathering Systems; Liquefied
Natural Gas Facilities; and Underground Natural Gas Storage
Facilities—Annual Report. (191.17)
(A) Transmission or gathering.
1. Each operator of a transmission or a regulated onshore
gathering pipeline system must submit an annual report for
that system on U.S. Department of Transportation Form PHMSA
F 7100.2-1. This report must be submitted each year, not later
than March 15, for the preceding calendar year. See the report
submission requirements in subsection (5)(A). The annual
report form is incorporated by reference in subsection (5)(G).
2. Type R gathering. Beginning with an initial annual
report submitted in March 2023 for the 2022 calendar year,
each operator of a reporting-regulated gas gathering pipeline
system must submit an annual report for that system on U.S.
Department of Transportation Form PHMSA F 7100.2-3. This
report must be submitted each year, not later than March 15,
for the preceding calendar year. See the report submission
requirements in subsection (5)(A). The annual report form is
incorporated by reference in subsection (5)(G).
(B) LNG. Each operator of a liquefied natural gas facility must
submit an annual report for that system on U.S. Department
of Transportation Form PHMSA F 7100.3-1. This report must be
submitted each year, not later than March 15, for the preceding
calendar year. See the report submission requirements in
subsection (5)(A). The annual report form is incorporated by
reference in subsection (5)(G).
(C) Underground natural gas storage facility. Each operator
of an UNGSF must submit an annual report through U.S.
Department of Transportation Form PHMSA F 7100.4-1. This
report must be submitted each year, no later than March 15,
for the preceding calendar year. See the report submission
requirements in subsection (5)(A). The annual report form is
incorporated by reference in subsection (5)(G).
(11) National Registry of Pipeline and LNG Operators. (191.22)
(A) OPID request.
1. Effective January 1, 2012, each operator of a gas pipeline,
gas pipeline facility, UNGSF, LNG plant, or LNG facility must
obtain from PHMSA an Operator Identification Number
(OPID). An OPID is assigned to an operator for the pipeline,
pipeline facility, or pipeline system for which the operator has
primary responsibility. To obtain an OPID, an operator must
complete an OPID Assignment Request (U.S. Department of
Transportation Form PHMSA F 1000.1) through the National
Registry of Operators at https://portal.phmsa.dot.gov unless an
alternative reporting method is authorized in accordance with
subsection (5)(D). A copy of each submission to PHMSA must
also be submitted concurrently to designated commission
personnel—see addresses in subsection (5)(E).
2. The OPID Assignment Request form is incorporated by
reference in subsection (5)(G).
(B) OPID validation. An operator who has already been
assigned one (1) or more OPIDs by January 1, 2011, must
validate the information associated with each OPID through
the National Registry of Operators at https://portal.phmsa.dot.
gov, and correct that information as necessary, no later than
September 30, 2012 (PHMSA Advisory Bulletin ADB-2012-04
extended the deadline from June 30, 2012, to September 30,
2012).
(C) Changes. Each operator of a gas pipeline, gas pipeline
facility, UNGSF, LNG plant, or LNG facility must notify PHMSA
electronically through the National Registry of Operators
at https://portal.phmsa.dot.gov of certain events. A copy of
each online notification must also be submitted concurrently
to designated commission personnel—see addresses in
subsection (5)(E).
1. An operator must notify PHMSA of any of the following
events not later than sixty (60) days before the event occurs:
A. Construction or any planned rehabilitation, replacement, modification, upgrade, uprate, or update of a facility,
other than a section of line pipe, that costs ten (10) million
dollars or more. If sixty- (60-) day notice is not feasible because
of an emergency, an operator must notify PHMSA as soon as
practicable;
B. Construction of ten (10) or more miles of a new
pipeline;
C. Construction of a new LNG plant, LNG facility, or
UNGSF;
D. Maintenance of an UNGSF that involves the plugging
or abandonment of a well, or that requires a workover rig and
costs two hundred thousand dollars ($200,000) or more for
an individual well, including its wellhead. If sixty- (60-) day
notice is not feasible due to an emergency, an operator must
promptly respond to the emergency and notify PHMSA as soon
as practicable;
E. Reversal of product flow direction when the reversal
is expected to last more than thirty (30) days. This notification
is not required for pipeline systems already designed for bidirectional flow; or
F. A pipeline converted for service under 20 CSR 424040.030(1)(H), or a change in commodity as reported on the
annual report as required by section (10).
2. An operator must notify PHMSA of any of the following
events not later than sixty (60) days after the event occurs:
A. A change in the primary entity responsible (i.e., with
an assigned OPID) for managing or administering a safety
program required by this rule covering pipeline facilities
operated under multiple OPIDs;
B. A change in the name of the operator;
C. A change in the entity (e.g., company, municipality)
responsible for an existing pipeline, pipeline segment, pipeline
facility, UNGSF, or LNG facility;
D. The acquisition or divestiture of fifty (50) or more
miles of a pipeline or pipeline system subject to 20 CSR 424040.030; or
E. The acquisition or divestiture of an existing UNGSF, or
an LNG plant, or LNG facility subject to 49 CFR Part 193.
(D) Reporting. An operator must use the OPID issued by
PHMSA for all reporting requirements covered under 20 CSR
4240-40.020, 20 CSR 4240-40.030, 20 CSR 4240-40.033, and 20
CSR 4240-40.080, and for submissions to the National Pipeline
Mapping System.
(12) Reporting Safety-Related Conditions. (191.23)
(A) Except as provided in subsection (12)(B), each operator
must report in accordance with section (13) the existence of any
of the following safety-related conditions involving facilities in
service:
1. In the case of the pipeline (other than an LNG facility)
that operates at a hoop stress of twenty percent (20%) or more
of its specified minimum yield strength, general corrosion
that has reduced the wall thickness to less than that required
for the maximum allowable operating pressure and localized
corrosion pitting to a degree where leakage might result;
2. In the case of a UNGSF, general corrosion that has
reduced the wall thickness of any metal component to less
than that required for the well’s maximum operating pressure,
or localized corrosion pitting to a degree where leakage might
result;
3. Unintended movement or abnormal loading by
environmental causes, such as an earthquake, landslide, or
flood, that impairs the serviceability of a pipeline or the
structural integrity or reliability of a UNGSF, or an LNG facility
that contains, controls, or processes gas or LNG;
4. Any crack or other material defect that impairs the
structural integrity or reliability of a UNGSF or an LNG facility
that contains, controls, or processes gas or LNG;
5. Any material defect or physical damage that impairs
the serviceability of a pipeline that operates at a hoop stress of
twenty percent (20%) or more of its specified minimum yield
strength or a UNGSF;
6. Any malfunction or operating error that causes the
pressure, plus the margin (build-up) allowed for operation
of pressure limiting or control devices, to exceed either the
maximum allowable operating pressure of a distribution
or gathering line, the maximum well allowable operating
pressure of a UNGSF, or the maximum allowable working
pressure of an LNG facility that contains or processes gas or
LNG;
7. A leak in a pipeline, UNGSF, or LNG facility that contains
or processes gas or LNG that constitutes an emergency;
8. Inner tank leakage, ineffective insulation, or frost heave
that impairs the structural integrity of an LNG storage tank;
9. Any safety-related condition that could lead to an
imminent hazard and causes (either directly or indirectly
by remedial action of the operator), for purposes other than
abandonment, a twenty percent (20%) or more reduction in
operating pressure or shutdown of operation of a pipeline,
UNGSF, or an LNG facility that contains or processes gas or LNG;
10. For transmission pipelines only, each exceedance of
the maximum allowable operating pressure that exceeds the
AND INSURANCE
margin (build-up) allowed for operation of pressure-limiting
or control devices as specified in the applicable requirements
of 20 CSR 4240-40.030(4)(FF) and (13)(R). The reporting
requirement of this paragraph is not applicable to gathering
lines, distribution lines, LNG facilities, or underground natural
gas storage facilities (see paragraph (12)(A)6.); and
11. Any malfunction or operating error that causes the
pressure of a UNGSF using a salt cavern for natural gas storage
to fall below its minimum allowable operating pressure, as
defined by the facility’s state or federal operating permit or
certificate, whichever pressure is higher.
(B) A report is not required for any safety-related condition
that—
1. Exists on a master meter system, a reporting-regulated
gathering pipeline, a Type C gas gathering pipeline with an
outside diameter of 12.75 inches or less, a Type C gathering
pipeline covered by the exception in 20 CSR 4240-40.030(1)
(E)2.E.(I), or a customer-owned service line;
2. Is an incident or results in an incident before the
deadline for filing the safety-related condition report;
3. Exists on a pipeline (other than a UNGSF or an LNG
facility) that is more than two hundred twenty (220) yards (two
hundred (200) meters) from any building intended for human
occupancy or outdoor place of assembly, except that reports
are required for conditions within the right-of-way of an active
railroad, paved road, street, or highway;
4. Exists on a UNGSF, where a well or wellhead is isolated,
allowing the reservoir or cavern and all other components
of the facility to continue to operate normally and without
pressure restriction; or
5. Is corrected by repair or replacement in accordance
with applicable safety standards before the deadline for
filing the safety-related condition report. Notwithstanding this
exception, a report must be filed for—
A. Conditions under paragraph (12)(A)1., unless the
condition is localized corrosion pitting on an effectively coated
and cathodically protected pipeline; and
B. Any condition under paragraph (12)(A)10.
(13) Filing Safety-Related Condition Reports. (191.25)
(A) Each report of a safety-related condition under
paragraphs (12)(A)1.-9. must be filed (received by the Associate
Administrator, Office of Pipeline Safety at PHMSA and
designated commission personnel) in writing within five
(5) working days (not including Saturday, Sunday, or federal
holidays) after the day a representative of the operator first
determines that the condition exists, but not later than ten
(10) working days after the day a representative of the operator
discovers the possibility of a condition. Separate conditions
may be described in a single report if they are closely related.
Reporting methods and report requirements are described in
subsection (13)(C).
(B) Each report of a maximum allowable operating pressure
exceedance meeting the requirements of criteria in paragraph
(12)(A)10. for a gas transmission pipeline must be filed (received
by the Associate Administrator, Office of Pipeline Safety at
PHMSA and designated commission personnel) in writing
within five (5) calendar days of the exceedance using the
reporting methods and report requirements described in
subsection (13)(C).
(C)
Reports
must
be
filed
by
email
to
InformationResourcesManager@dot.gov or by facsimile to
(202) 366–7128 for the Office of Pipeline Safety, and by email
to PipelineSafetyProgramManager@psc.mo.gov or by facsimile
to (573) 522-1946 for designated commission personnel. For a
report made pursuant to paragraphs (12)(A)1.-9., the report must
be headed “Safety-Related Condition Report.” For a report made
pursuant to paragraph (12)(A)10., the report must be headed
“Maximum Allowable Operating Pressure Exceedances.” All
reports must provide the following information:
1. Name, principal address, and operator identification
number (OPID) of the operator;
2. Date of report;
3. Name, job title, and business telephone number of the
person submitting the report;
4. Name, job title, and business telephone number of the
person who determined that the condition exists;
5. Date the condition was discovered and date the
condition was first determined to exist;
6. Location of the condition, with reference to the state
(and town, city, or county), and as appropriate, nearest street
address, survey station number, milepost, landmark, or name
of pipeline;
7. Description of the condition, including circumstances
leading to its discovery, any significant effects of the condition
on safety, and the name of the commodity transported or
stored; and
8. The corrective action taken (including reduction of
pressure or shutdown) before the report is submitted and the
planned follow-up or future corrective action, including the
anticipated schedule for starting and concluding such action.
(14) National Pipeline Mapping System (NPMS). (191.29)
(A) Each operator of a gas transmission pipeline or liquefied
natural gas facility must provide the following geospatial data
to PHMSA for that pipeline or facility:
1. Geospatial data, attributes, metadata, and transmittal
letter appropriate for use in the National Pipeline Mapping
System. Acceptable formats and additional information are
specified in the NPMS Operator Standards Manual available
at www.npms.phmsa.dot.gov or by contacting the PHMSA
geographic information systems manager at (202) 366-4595;
2. The name of and address for the operator; and
3. The name and contact information of a pipeline
company employee, to be displayed on a public website, who
will serve as a contact for questions from the general public
about the operator’s NPMS data.
(B) The information required in subsection (14)(A) must be
submitted each year, on or before March 15, representing assets
as of December 31 of the previous year. If no changes have
occurred since the previous year’s submission, the operator
must comply with the guidance provided in the NPMS Operator
Standards manual available at www.npms.phmsa.dot.gov or
contact the PHMSA geographic information systems manager
at (202) 366-4595.
(C) This section does not apply to gathering pipelines.
AUTHORITY: sections 386.250, 386.310, and 393.140, RSMo 2016.*
This rule originally filed as 4 CSR 240-40.020. Original rule filed
Feb. 5, 1970, effective Feb. 26, 1970. Amended: Filed Dec. 19, 1975,
effective Dec. 29, 1975. Amended: Filed Feb. 8, 1985, effective Aug.
11, 1985. Rescinded and readopted: Filed May 17, 1989, effective
Dec. 15, 1989. Amended: Filed Oct. 7, 1994, effective May 28, 1995.
Amended: Filed April 9, 1998, effective Nov. 30, 1998. Amended:
Filed Dec. 14, 2000, effective May 30, 2001. Amended: Filed Oct.
15, 2007, effective April 30, 2008. Amended: Filed Nov. 29, 2012,
effective May 30, 2013. Amended: Filed Nov. 14, 2016, effective
June 30, 2017. Amended: Filed June 4, 2018, effective Jan. 30, 2019.
Moved to 20 CSR 4240-40.020, effective Aug. 28, 2019. Amended:
Filed Dec. 12, 2019, effective July 30, 2020. Amended: Filed June
29, 2021, effective Jan. 30, 2022. Amended: Filed July 29, 2022,
effective Feb. 28, 2023. Amended: Filed March 19, 2025, effective
Nov. 30, 2025.
*Original authority: 386.250, RSMo 1939, amended 1963, 1967, 1977, 1980, 1987, 1988,
1991, 1993, 1995, 1996; 386.310, RSMo 1939, amended 1979, 1989, 1996; and 393.140,
RSMo 1939, amended 1949, 1967.