2 CSR 90-60.050
Use of Missouri State Plane Coordinate System
PURPOSE: This rule sets forth the requirements for referencing
land boundary corners to the Missouri State Plane Coordinate
System.
(1) When the professional land surveyor is specifically requested or required to reference land boundary corners to the
Missouri State Plane Coordinate System, the professional land
surveyor shall comply with the following requirements:
(A) The position of the corner shall be based upon a geodetic
control station having a horizontal accuracy of second order (as
defined in 20 CSR 2030-18.020) or higher order;
(B) The survey connecting the corner to the geodetic
control station shall meet the accuracy standards for property
boundary surveys set forth in this chapter; and
(C) The plat or other publication of results shall identify the
geodetic control station(s) that were used to determine the
position of the corner(s), along with a list of the coordinates
of those control station(s); the appropriate adjustment date or
realization designation and Datum/Terrestrial Reference Frame,
along with the epoch date when applicable. Epoch date refers
to Reference Epoch Coordinates (RECs). Coordinates estimated
by National Geodetic Survey (NGS) for one of the official
reference epochs NGS will define (every five (5) or ten (10) years,
as currently planned). As these coordinates are computed by
NGS they are considered part of the National Spatial Reference
System (NSRS); a brief statement of the method used to obtain
those positions; and the grid factor used (if applicable).
AUTHORITY: sections 60.550 and 448.2-109, RSMo 2016, and
section 60.510(7), RSMo Supp. 2024.* Material in this rule was
originally covered in 10 CSR 30-2.050. Original rule filed Dec. 1,
2016, effective June 30, 2017. Amended: Filed Jan. 8, 2025, effective
Aug. 30, 2025.
*Original authority: 60.510, RSMo 1969, amended 2012, 2013, 2023; 60.550, RSMo
1969, amended 2013; and 448.2-109, RSMo 1983, amended 1988.