19 MAC Pt. 7, R. 5.02.3

-1: Scheduling of the Inspection

Year: 2026Length: 332 wordsOfficial source

Cite as 19 Miss. Admin. Code Pt. 7, R. 5.02.3

-1: Scheduling of the Inspection D. For all new or used residential Factory-Built homes involving a retailer, the retailer is required to, within three (3) business days of the completion of the installation and prior to the installation of any porches or decks at the entrances to the home, or installation of any skirting around the home submit by e-mail, facsimile, or priority mail, a properly completed and signed Property Locator/Certificate of Installation form and the required photographs of the end walls of the multi-section home showing the serial number of the home and the measured width of the marriage line gap at the widest point to the Factory-Built Home Division of the State Fire Marshal’s Office. Directions included on or with the Property Locator form will provide information on the exact location where the home has been installed. E. For secondary sitings not involving a retailer, the installer/transporter is required to submit, within three (3) business days of the completion of the installation and prior to the installation of any porches or decks at the entrances to the home, the installation of any skirting around the home, submit by email, facsimile, or priority mail, the properly completed and signed Property Locator/Certificate of Installation form and the required photographs of the end walls of the multi-section home showing the serial number of the home and the measured width of the marriage line gap at the widest point to the Factory-Built Home Division of the State Fire Marshal’s Office, for all Factory-Built homes. Directions included on or with the Property Locator form will provide information on the exact location where the home has been installed. F. Inspections of the installed factory-built home shall be scheduled to occur within seven (7) to ten (10) business days following the receipt of the Property Locator/Certificate of Installation from the retailer, the developer and/or the installer/transporter. Resource and manpower shortages within the Division will require adjustments to the time frame for completing the received and assigned inspections.
19 MAC Pt. 7, R. 5.02.3: -1: Scheduling of the Inspection | Justis AI