19 MAC Pt. 7, R. 5.06.1

-4: Raised Soil Pad

Year: 2026Length: 312 wordsOfficial source

Cite as 19 Miss. Admin. Code Pt. 7, R. 5.06.1

-4: Raised Soil Pad If the installation site is flat or is in a low area, compactable soil material must be brought to the site to create the proper grading under the home. The fill material for the pad of soil must be placed on each home installation site such that the dimensions of the pad will extend a minimum distance of 10 ft beyond each side of the home. The location where the soil pad fill material will be placed must be free of any organic debris (such as vegetation, wood, roots, twigs, dead branches, grass and brush). The soil pad material is to be applied in thin consistent layers, not exceeding 8 inches, with each layer compacted to at least 90 percent of its maximum relative density before the next layer is placed. This method should provide the proper load bearing capacity for the support pier footings. Layers exceeding eight (8) inches can result in inadequate compaction and future settlement. Loose sand, gravel or other non- compactable materials are not to be used as the fill material for the pad. The soil under the home shall be adequately crowned and sloped from the centerline of the home providing a minimum slope of ½ inch per foot from the center of the soil pad to the distance 10 ft away from each side and end of the home (see Figure 5). Exceptions to these requirements may be allowed where property lines, retaining walls, slopes, mature trees or other physical conditions prohibit achieving the minimum distance from the sides and ends of the home. All depressions in the soil pad resulting from the use of the transportation equipment moving the home onto the installation site shall be properly filled and graded by the installer/transporter before departing the installation site. Figure 5. Slope of pad and distance of slope beyond edges of home.
19 MAC Pt. 7, R. 5.06.1: -4: Raised Soil Pad | Justis AI