19 MAC Pt. 8, Ch. 1, R. 1.27
Plan Review – Required
Cite as 19 Miss. Admin. Code Pt. 8, Ch. 1, R. 1.27
Plan Review – Required
(1)
Prior to beginning the installation or alteration of equipment at any individual
location, the contractor shall submit and have approved an application and plans
describing the installation or alteration.
(2)
The contractor shall submit two (2) copies of the plans to be reviewed to the
department. These copies shall be submitted in a manner prescribed by the
department.