19 MAC Pt. 8, Ch. 1, R. 1.28
Plan Review – New Equipment
Cite as 19 Miss. Admin. Code Pt. 8, Ch. 1, R. 1.28
Plan Review – New Equipment
(1)
A contractor must submit for review an application and plans for the installation
of new equipment.
(2)
To apply for a plan review for the installation of new equipment, a contractor
must:
(a)
submit a completed application on a department-approved form;
(b)
pay the fee required by this Regulation; and
(c)
submit layout drawings as specified in this Regulation for the specific type
of equipment to be installed. These layout drawings shall also include:
(i)
the rated speed of the equipment in feet per minute;
(ii)
the rated capacity of the equipment in pound;
(iii)
the total travel of the equipment in feet and inches;
(iv)
elevation drawings of the hoistway, runway, or wellway; and
(v)
plan drawings indicating the arrangement of the equipment in a
machine room, machine space, control room, or control space.