15 MAC Pt. 10, R. 2.2.2

Power boilers and high pressure, high temperature water boilers shall receive a

Year: 2026Length: 33 wordsOfficial source

Cite as 15 Miss. Admin. Code Pt. 10, R. 2.2.2

Power boilers and high pressure, high temperature water boilers shall receive a certificate inspection annually or as the Board may require and shall also be externally inspected annually while under pressure if possible.
15 MAC Pt. 10, R. 2.2.2: Power boilers and high pressure, high temperature water boilers shall receive a | Justis AI