15 MAC Pt. 10, R. 2.9.1
Special Inspectors shall, within one year of the effective date of these rules and
Cite as 15 Miss. Admin. Code Pt. 10, R. 2.9.1
Special Inspectors shall, within one year of the effective date of these rules and
regulations for power boilers and high pressure, high temperature water boilers
and two years for other installations, submit to the Chief Inspector an inspection
report on a Standard Form for states operating under the ASME Code, Boiler and
Pressure Vessel Data Report -- First Internal Inspection, for each boiler and
pressure vessel subject to inspection in this state. Complete data shall be
submitted on this Standard Form for each nonstandard boiler or pressure vessel.