Additional Analysis. Additional analysis may be required if the following criteria
are met:
(a)
A development generates more than 100 peak-hour, peak-direction trips
and the level of service of the adjacent street or intersections drops to a level of service
less than "C"; or the development generates more than 100 peak-hour, peak-direction
trips and roadway or traffic control modifications are necessary (i.e., turn lanes,
acceleration-deceleration lanes, traffic signal installations, etc.).
(b)
Other operational, safety, or traffic problems that will require significant
changes in roadways or traffic control measures.
3986776.1/00520.00006
(c)
If it is determined that the development may be considered a high intensity
impact site, the Developer/engineer will meet again with the General Manager or his
designee to define a study area for the entire impact analysis report.
(i)
Additional analysis that may be required for a high intensity
analysis are:
(1)
Capacity analysis of all signalized and unsignalized
intersections.
(2)
Traffic control and traffic signal warrant analysis.
(3)
Site access.
(4)
On-site circulation and parking.
(5)
Other related traffic engineering studies (i.e., gap, delay or
speed studies; accident analysis).