33 MAC Pt. 204, R. 14.1
Implementation
Cite as 33 Miss. Admin. Code Pt. 204, R. 14.1
Implementation. After the traffic impact analysis report has been reviewed and
approved by the General Manager or his designee, the Developer can then proceed with the
construction drawings and specifications for required roadway and traffic control
modifications/enhancements.