33 MAC Pt. 204, R. 14.1

Implementation

Year: 2026Length: 37 wordsOfficial source

Cite as 33 Miss. Admin. Code Pt. 204, R. 14.1

Implementation. After the traffic impact analysis report has been reviewed and approved by the General Manager or his designee, the Developer can then proceed with the construction drawings and specifications for required roadway and traffic control modifications/enhancements.