39 MAC Pt. 101, Ch. 13, R. 11.3

Work that results in lowering of the elevation of the roadbed, adjacent shoulder or

Year: 2026Length: 37 wordsOfficial source

Cite as 39 Miss. Admin. Code Pt. 101, Ch. 13, R. 11.3

Work that results in lowering of the elevation of the roadbed, adjacent shoulder or drainage culverts or ditches, except as allowed in 11.2 above, shall be considered Construction and not Routine Maintenance for purposes of these rules.
39 MAC Pt. 101, Ch. 13, R. 11.3: Work that results in lowering of the elevation of the roadbed, adjacent shoulder or | Justis AI