6 MAC Pt. 4, R. 12.17

Limitation on Grant Amount Designated for Engineering or Architectural Costs

Year: 2026Length: 41 wordsOfficial source

Cite as 6 Miss. Admin. Code Pt. 4, R. 12.17

Limitation on Grant Amount Designated for Engineering or Architectural Costs. Up to 8% of the principal grant amount may be used for design work, i.e., engineer or architect. Engineering and/or architectural costs above 8% must be paid from other funding sources.
6 MAC Pt. 4, R. 12.17: Limitation on Grant Amount Designated for Engineering or Architectural Costs | Justis AI