MAC Pt. 18, R. 3.1.10
Procedures and Protocol
Cite as Miss. Admin. Code Pt. 18, R. 3.1.10
Procedures and Protocol.
1.
Once all required information is submitted, the Division of On-site Wastewater shall
complete the review of the development or request additional information within thirty
calendar days.
2.
The review of the proposed project for determination of the requirement for a feasibility
study will be made utilizing the steps outlined in a flow chart.
3.
Subdivisions will be considered feasible for central collection if the cost of a central
system does not exceed 150 percent of the aggregate cost of an individual on-site
wastewater disposal system on each lot.