11 MAC Pt. 2, R. 2.3

Application for Permit to Construct and State Permit to Operate New Stationary

Year: 2026Length: 128 wordsOfficial source

Cite as 11 Miss. Admin. Code Pt. 2, R. 2.3

Application for Permit to Construct and State Permit to Operate New Stationary Source. A. All engineering plans and specifications required by DEQ must bear the signature, registration number, and seal of a professional engineer registered in the State of Mississippi. B. Information Required. (1) The Permit Board may require each application for a permit to construct a new stationary source be accompanied by two (2) complete sets of site drawings, construction drawings, design calculations and specifications. (2) Upon request by the Permit Board, the applicant shall furnish any additional information necessary to evaluate the design adequacy of the new stationary source. (3) The Permit Board may require the applicant to predict the impact of emissions on air quality using air quality models as referenced in Rule 2.5.B. herein.
11 MAC Pt. 2, R. 2.3: Application for Permit to Construct and State Permit to Operate New Stationary | Justis AI