ARM 17.24.1011

ARM 17.24.1011. HYDROLOGIC BALANCE

Last amended: 2024Length: 54 wordsOfficial source

Cite as Mont. Admin. R. 17.24.1011

(1) Prospecting must be conducted to minimize disturbance of the prevailing hydrologic balance in accordance with ARM 17.24.631 through 17.24.634, 17.24.638 through 17.24.651 and must include appropriate sediment control measures, such as those listed in ARM 17.24.638 or sedimentation ponds that comply with the requirements of ARM 17.24.639. The department may specify additional measures.
ARM 17.24.1011: ARM 17.24.1011. HYDROLOGIC BALANCE | Justis AI