ARM 17.36.802
ARM 17.36.802. FEE SCHEDULES
Cite as Mont. Admin. R. 17.36.802
(1) An applicant for approval of a division of land into one or more parcels, condominiums, mobile home/trailer courts, recreational camping vehicle spaces, and tourist campgrounds shall pay the following fees:
UNIT
UNIT COST
TYPE OF LOTS
Subdivision lot
lot/parcel
$75
Condominium/trailer court/recreational camping vehicle campground
unit/space
$30
Resubmittal fee – previously approved lot, boundaries are not changed
lot/parcel
$50
TYPE OF WATER SYSTEM
Individual or shared water supply system (existing and proposed)
unit
$50
UNIT
UNIT COST
Multiple user system
- new system
- connection to approved
existing distribution
system
- extension to existing
distribution system
- new distribution system
each
lot/unit
lot/unit
lot/unit
$250 (plus $50/hour for review in excess of five hours)
$ 15
$ 30
$ 30
Public water system
New system per DEQ-1
- connection to existing system
- extension of existing system
- new distribution system
component
lot/structure
lot/structure
lot/structure
per ARM 17.38.106 fee schedule
$ 15
$ 30
$ 30
TYPE OF WASTEWATER DISPOSAL
Existing systems
unit
$ 50
New subsurface system
drainfield
$ 60
New pressure-dosed, elevated sand mound, ET systems, intermittent sand filter, ETA systems, recirculating sand filter, recirculating trickling filter, aerobic treatment unit, and nutrient removal
design
$150 (plus $50/hour for review in excess of three hours)
UNIT
UNIT COST
Drainfields for pressured-dosed, intermittent sand filter, recirculating sand filter, recirculating trickling filter, aerobic treatment unit, and nutrient removal
drainfield
$ 30
Multiple user wastewater system
- connection
- extension
- new collection system
lot/unit
lot/unit
lot/unit
$ 15
$ 30
$ 30
New public wastewater system per DEQ-2
- New connection to existing
system
- New extension to existing
public wastewater system
- New public wastewater
collection system
component
lot/structure
lot/structure
lot/structure
per ARM 17.38.106 fee schedule
$ 15
$ 30
$ 30
OTHER
Deviation from circular
request or per design
$100
(plus $50/hour for review in excess of two hours)
Waiver from rule
request
$100 (plus $50/hour for review in excess of two hours)
UNIT
UNIT COST
Reissuance of original approval statement
request
$ 50
Municipal facilities exemption checklist (former master plan exemption)
application
$ 75
Nonsignificance determinations/categorical exemption reviews
- individual/shared systems
- multiple-user and public systems
drainfield
lot/structure
$ 40
$ 20
Storm drainage plan review
- plans exempt from Circular DEQ-8
- Circular DEQ-8 review
plan
plan
$ 25
$ 50 (plus $50/hour for review in excess of one hour)
Preparation of environmental
assessments/environmental
impact statements
----
actual cost