ARM 17.36.802

ARM 17.36.802. FEE SCHEDULES

SupersededLast amended: 2009Length: 448 wordsOfficial source

Cite as Mont. Admin. R. 17.36.802

(1) An applicant for approval of a division of land into one or more parcels, condominiums, mobile home/trailer courts, recreational camping vehicle spaces, and tourist campgrounds shall pay the following fees: UNIT UNIT COST TYPE OF LOTS Subdivision lot lot/parcel $ 100 Condominium/trailer court/recreational camping vehicle campground unit/space $ 40 Resubmittal fee – previously approved lot, boundaries are not changed lot/parcel $ 60 TYPE OF WATER SYSTEM Individual or shared water supply system (existing and proposed) unit $ 60 Multiple user system - new system - connection to approved existing distribution system - extension to existing distribution system - new distribution system each lot/unit lot/unit lot/unit $250 (plus $75/ hour for review in excess of four hours) $ 20 $ 50 $ 50 Public water system New system per DEQ-1 - connection to existing system - extension of existing system - new distribution system component lot/structure lot/structure lot/structure per ARM 17.38.106 fee schedule $ 20 $ 40 $ 40 TYPE OF WASTEWATER DISPOSAL Existing systems unit $ 60 New subsurface system drainfield $ 75 New pressure-dosed, elevated sand mound, ET systems, intermittent sand filter, ETA systems, recirculating sand filter, recirculating trickling filter, aerobic treatment unit, nutrient removal, and whole house subsurface drip irrigation systems design $150 (plus $75/ hour for review in excess of two hours) Drainfields for pressured-dosed, intermittent sand filter, recirculating sand filter, recirculating trickling filter, aerobic treatment unit, and nutrient removal drainfield $ 40 UNIT UNIT COST Gray water reuse systems. This is a stand- alone fee and all gray water reuse systems will be reviewed at the unit cost unit $75 (plus $75/hour in excess of two hours) Multiple user wastewater system - connection - extension - new collection system lot/unit lot/unit lot/unit $ 20 $ 50 $ 50 New public wastewater system per DEQ-2 - New connection to existing system - New extension to existing public wastewater system - New public wastewater collection system component lot/structure lot/structure lot/structure per ARM 17.38.106 fee schedule $ 20 $ 50 $ 50 OTHER Deviation from circular request or per design $150 (plus $75/ hour for review in excess of two hours) Waiver from rule request $150 (plus $75/ hour for review in excess of two hours) Reissuance of original approval statement request $ 50 Municipal facilities exemption checklist (former master plan exemption) application $ 100 UNIT UNIT COST Nonsignificance determinations/categorical exemption reviews - individual/shared systems - multiple-user and public systems drainfield lot/structure $ 50 $ 25 Storm drainage plan review - plans exempt from Circular DEQ-8 - Circular DEQ-8 review lot lot $ 30 $30 (plus $75/ hour for review in excess of 30 minutes per lot) Preparation of environmental assessments/environmental impact statements ---- actual cost
ARM 17.36.802: ARM 17.36.802. FEE SCHEDULES | Justis AI