ARM 17.36.802

ARM 17.36.802. FEE SCHEDULES

SupersededLast amended: 2013Length: 447 wordsOfficial source

Cite as Mont. Admin. R. 17.36.802

(1) An applicant for approval of a division of land into one or more parcels, condominiums, mobile home/trailer courts, recreational camping vehicle spaces, and tourist campgrounds shall pay the following fees: UNIT UNIT COST TYPE OF LOTS Subdivision lot lot/parcel $ 125 Condominium/trailer court/recreational camping vehicle campground unit/space $ 50 Resubmittal fee – previously approved lot, boundaries are not changed lot/parcel $ 75 TYPE OF WATER SYSTEM Individual or shared water supply system (existing and proposed) unit $ 85 Multiple user system (non-public) - new system - new distribution system design - connection to distribution system each lineal foot lot/unit $ 315 (plus $105/hour for review in excess of four hours) $ 0.50 $ 70 Public water system New system per DEQ-1 - new distribution system design - connection to distribution system component lineal foot lot/structure per ARM 17.38.106 fee schedule $ 0.50 $ 70 TYPE OF WASTEWATER DISPOSAL Existing systems unit $ 75 New gravity fed system drainfield $ 95 New pressure-dosed, elevated sand mound, ET systems, intermittent sand filter, ETA systems, recirculating sand filter, recirculating trickling filter, aerobic treatment unit, nutrient removal, and whole house subsurface drip irrigation systems design $ 190 (plus $105/hour for review in excess of two hours) New pressure-dosed, elevated sand mound, ET systems, intermittent sand filter, ETA systems, recirculating sand filter, recirculating trickling filter, aerobic treatment unit, nutrient removal, and whole house subsurface drip irrigation systems drainfield $ 50 UNIT UNIT COST Gray water reuse systems. This is a stand-alone fee and all gray water reuse systems will be reviewed at the unit cost unit $ 95 (plus $105/hour in excess of two hours) Multiple user wastewater system (non-public) - new collection system design - connection to collection system lineal foot lot/unit $ 0.50 $ 70 New public wastewater system per DEQ-2 - new collection system design - connection to collection system component lineal foot lot/structure per ARM 17.38.106 fee schedule $ 0.50 $ 70 OTHER Deviation from circular request or per design $ 200 (plus $105/hour for review in excess of two hours) Waiver from rule request $ 200 (plus $105/hour for review in excess of two hours) Reissuance of original approval statement request $ 60 Municipal facilities exemption checklist (former master plan exemption) application $ 100 UNIT UNIT COST Nonsignificance determinations/categorical exemption reviews - individual/shared systems - multiple-user non-public systems - public systems drainfield lot/structure drainfield $ 60 $ 30 per ARM 17.38.106 fee schedule Storm drainage plan review - plans exempt from Circular DEQ-8 - Circular DEQ-8 review lot design lot $ 40 $ 180 $ 40 (plus $105/hour for review in excess of 30 minutes per lot) Preparation of environmental assessments/environmental impact statements ---- actual cost
ARM 17.36.802: ARM 17.36.802. FEE SCHEDULES | Justis AI