ARM 17.36.802

ARM 17.36.802. FEE SCHEDULES

SupersededLast amended: 2014Length: 428 wordsOfficial source

Cite as Mont. Admin. R. 17.36.802

(1) An applicant for approval of a division of land into one or more parcels, condominiums, mobile home/trailer courts, recreational camping vehicle spaces, and tourist campgrounds shall pay the following fees: UNIT UNIT COST TYPE OF LOTS Subdivision lot lot/parcel $125 Condominium/trailer court/recreational camping vehicle campground unit/space $50 Resubmittal fee – previously approved lot, boundaries are not changed lot/parcel $75 TYPE OF WATER SYSTEM Individual or shared water supply system (existing and proposed) unit $85 Multiple user system (non-public) - new system each $ 315 (plus $105/hour for review in excess of four hours) - new distribution system design lineal foot $0.50 - connection to distribution system lot/unit $70 Public water system New system per DEQ-1 component per ARM 17.38.106 fee schedule - new distribution system design lineal foot $0.50 - connection to distribution system lot/structure $70 TYPE OF WASTEWATER DISPOSAL Existing systems unit $75 New gravity fed system drainfield $95 New pressure-dosed, elevated sand mound, ET systems, intermittent sand filter, ETA systems, recirculating sand filter, recirculating trickling filter, aerobic treatment unit, nutrient removal, and whole house subsurface drip irrigation systems design $ 190 (plus $105/hour for review in excess of two hours) New pressure-dosed, elevated sand mound, ET systems, intermittent sand filter, ETA systems, recirculating sand filter, recirculating trickling filter, aerobic treatment unit, nutrient removal, and whole house subsurface drip irrigation systems drainfield $50 Gray water reuse systems. This is a stand-alone fee and all gray water reuse systems will be reviewed at the unit cost unit $ 95 (plus $105/hour in excess of two hours) Multiple user wastewater system (non-public) - new collection system design lineal foot $0.50 - connection to collection system lot/unit $70 New public wastewater system per DEQ-2 component per ARM 17.38.106 fee schedule - new collection system design lineal foot $0.50 - connection to collection system lot/structure $70 OTHER Deviation from circular request or per design $ 200 (plus $105/hour for review in excess of two hours) Waiver from rule request $ 200 (plus $105/hour for review in excess of two hours) Reissuance of original approval statement request $60 Review of revised lot layout document request $125 Municipal facilities exemption checklist (former master plan exemption) application $100 Nonsignificance determinations/categorical exemption reviews - individual/shared systems drainfield $60 - multiple-user non-public systems lot/structure $30 - public systems drainfield per ARM 17.38.106 fee schedule Storm drainage plan review - plans exempt from Circular DEQ-8 lot $40 - Circular DEQ-8 review design $180 lot $ 40 (plus $105/hour for review in excess of 30 minutes per lot) Preparation of environmental ---- actual cost assessments/environmental impact statements
ARM 17.36.802: ARM 17.36.802. FEE SCHEDULES | Justis AI