ARM 17.36.802
ARM 17.36.802. FEE SCHEDULES
Cite as Mont. Admin. R. 17.36.802
(1) An applicant for approval of a division of land into one or more parcels, condominiums, mobile home/trailer courts, recreational camping vehicle spaces, and tourist campgrounds shall pay the following fees:
UNIT
UNIT COST
TYPE OF LOTS
Subdivision lot
lot/parcel
$125
Condominium/trailer court/recreational camping vehicle campground
unit/space
$50
Resubmittal fee – previously approved lot, boundaries are not changed
lot/parcel
$75
TYPE OF WATER SYSTEM
Individual or shared water supply system (existing and proposed)
unit
$85
Multiple user system (non-public)
- new system
each
$ 315 (plus $105/hour for review in excess of four hours)
- new distribution system design
lineal foot
$0.50
- connection to distribution system
lot/unit
$70
Public water system
New system per DEQ-1
component
per ARM 17.38.106 fee schedule
- new distribution system design
lineal foot
$0.50
- connection to distribution system
lot/structure
$70
TYPE OF WASTEWATER DISPOSAL
Existing systems
unit
$75
New gravity fed system
drainfield
$95
New pressure-dosed, elevated sand mound, ET systems, intermittent sand filter, ETA systems, recirculating sand filter, recirculating trickling filter, aerobic treatment unit, nutrient removal, and whole house subsurface drip irrigation systems
design
$ 190 (plus $105/hour for review in excess of two hours)
New pressure-dosed, elevated sand mound, ET systems, intermittent sand filter, ETA systems, recirculating sand filter, recirculating trickling filter, aerobic treatment unit, nutrient removal, and whole house subsurface drip irrigation systems
drainfield
$50
Gray water reuse systems. This is a stand-alone fee and all gray water reuse systems will be reviewed at the unit cost
unit
$ 95 (plus $105/hour in excess of two hours)
Multiple user wastewater system (non-public)
- new collection system design
lineal foot
$0.50
- connection to collection system
lot/unit
$70
New public wastewater system per DEQ-2
component
per ARM 17.38.106 fee schedule
- new collection system design
lineal foot
$0.50
- connection to collection system
lot/structure
$70
OTHER
Deviation from circular
request or per design
$ 200 (plus $105/hour for review in excess of two hours)
Waiver from rule
request
$ 200 (plus $105/hour for review in excess of two hours)
Reissuance of original approval statement
request
$60
Review of revised lot layout document
request
$125
Municipal facilities exemption checklist (former master plan exemption)
application
$100
Nonsignificance determinations/categorical exemption reviews
- individual/shared systems
drainfield
$60
- multiple-user non-public systems
lot/structure
$30
- public systems
drainfield
per ARM 17.38.106 fee schedule
Storm drainage plan review
- plans exempt from Circular DEQ-8
lot
$40
- Circular DEQ-8 review
design
$180
lot
$ 40 (plus $105/hour for review in excess of 30 minutes per lot)
Preparation of environmental
----
actual cost
assessments/environmental
impact statements