NDAC 33.1-24-05-135
Closure and postclosure care
Cite as N.D. Admin. Code § 33.1-24-05-135
1.
At closure, the owner or operator must remove or decontaminate all waste residue,
contaminated containment system components (liners, etc.), contaminated subsoils, and
structures and equipment contaminated with waste and leachate, and manage them as
hazardous waste unless subsection 4 of section 33.1-24-02-03 applies.
2.
If, after removing or decontaminating all residues and making all reasonable efforts to affect
removal or decontamination of contaminated components, subsoils, structures, and
equipment as required in subsection 1, the owner or operator finds that not all contaminated
subsoils can be practicably removed or decontaminated, the owner or operator shall close the
facility and perform postclosure care in accordance with the closure and postclosure care
requirements that apply to landfills (section 33.1-24-05-180).
3.
In addition:
a.
The owner or operator of a waste pile that does not comply with the liner requirements of
subdivision a of subsection 1 of section 33.1-24-05-131 and is not exempt from them in
accordance with subsection 3 of section 33.1-24-05-130 or subsection 6 of section
33.1-24-05-131, shall:
(1)
Include in the closure plan for the pile under section 33.1-24-05-61 both a plan for
complying with subsection 1 and a contingent plan for complying with subsection 2
in case not all contaminated subsoil can be practicably removed at closure; and
(2)
Prepare a contingent postclosure plan under section 33.1-24-05-67 for complying
with subsection 2 in case not all contaminated subsoil can be practicably removed
at closure.
b.
The cost estimates calculated under section 33.1-24-05-76 for closure and postclosure
care of a pile subject to this subsection must include the cost of complying with the
contingent closure plan and the contingent postclosure plan, but are not required to
include the cost of expected closure under subsection 1.