NDAC 33.1-24-05-63
Disposal or decontamination of equipment, structures, and soils
Cite as N.D. Admin. Code § 33.1-24-05-63
During the partial and final closure periods, all contaminated equipment, structures, and soils must
be properly disposed of or decontaminated unless otherwise specified in sections 33.1-24-05-110,
33.1-24-05-122, 33.1-24-05-135, 33.1-24-05-167, or 33.1-24-05-180. By removing any hazardous
wastes or hazardous constituents during partial and final closure, the owner or operator may become a
generator of hazardous waste and shall handle that waste in accordance with all applicable
requirements of chapter 33.1-24-03.