NDAC 33.1-24-05-76
Cost estimates for closure and postclosure care
Cite as N.D. Admin. Code ยง 33.1-24-05-76
1.
The cost estimates for closure.
a.
The owner or operator must have a detailed written estimate, in current dollars, of the
cost of closing the facility in accordance with the requirements in sections 33.1-24-05-60
through 33.1-24-05-64 and applicable closure requirements in sections 33.1-24-05-97,
33.1-24-05-110, 33.1-24-05-122, 33.1-24-05-135, 33.1-24-05-151, 33.1-24-05-167,
33.1-24-05-180, sections 33.1-24-05-301 through 33.1-24-05-303, and section
33.1-24-05-477.
(1)
The estimate must equal the cost of final closure at the point in the facility's active
life when the extent and manner of its operation would make closure the most
expensive, as indicated by its closure plan (see subsection 2 of section
33.1-24-05-61).
(2)
The closure cost estimate must be based on the costs to the owner or operator of
hiring a third party to close the facility. A third party is a party who is neither a parent
nor a subsidiary of the owner or operator. (See definition of parent corporation in
subsection 4 of section 33.1-24-05-75.) The owner or operator may use costs for
onsite disposal if the owner or operator can demonstrate that onsite disposal
capacity will exist at all times over the life of the facility.
(3)
The closure cost estimate may not incorporate any salvage value that may be
realized with the sale of hazardous wastes, facility structures or equipment, land, or
other assets associated with the facility at the time of partial or final closure.
(4)
The owner or operator may not incorporate a zero cost for hazardous wastes that
might have economic value.
b.
During the active life of the facility, the owner or operator shall adjust the closure cost
estimate for inflation within sixty days prior to the anniversary date of the establishment
of the financial instruments used to comply with section 33.1-24-05-77. For owners and
operators using the financial test or corporate guarantee, the closure cost estimate must
be updated for inflation within thirty days after the close of the firm's fiscal year and
before submission of updated information to the department as specified in subdivision c
of subsection 6 of section 33.1-24-05-77. The adjustment may be made by recalculating
the maximum costs of closure in current dollars, or by using an inflation factor derived
from the most recent implicit price deflator for gross national product published by the
United States department of commerce in its survey of current business as specified in
paragraphs 1 and 2. The inflation factor is the result of dividing the latest published
annual deflator by the deflator for the previous year.
(1)
The first adjustment is made by multiplying the closure cost estimates by the
inflation factor. The result is the adjusted closure cost estimate.
(2)
Subsequent adjustments are made by multiplying the latest adjusted closure cost
estimates by the latest inflation factor.
c.
During the active life of the facility, the owner or operator shall revise the closure cost
estimate no later than thirty days after the department has approved the request to
modify the closure plan, if the change in the closure plan increases the cost of closure.
The revised closure cost estimate must be adjusted for inflation as specified in
subdivision b.
d.
The owner or operator shall keep the following at the facility during the operating life of
the facility: the latest closure cost estimate prepared in accordance with subdivisions a
and c and, when this estimate has been adjusted in accordance with subdivision b, the
latest adjusted closure cost estimate.
2.
Cost estimate for postclosure care.
a.
The owner or operator of a disposal surface impoundment, disposal miscellaneous unit,
land treatment, or landfill unit, or a surface impoundment or waste pile required under
sections 33.1-24-05-122 and 33.1-24-05-135 to prepare a contingent closure and
postclosure plan, shall have a detailed written estimate in current dollars, of the annual
cost of postclosure monitoring and maintenance of the facility in accordance with the
applicable postclosure rules in sections 33.1-24-05-66 through 33.1-24-05-69, sections
33.1-24-05-122, 33.1-24-05-135, 33.1-24-05-167, 33.1-24-05-180, and 33.1-24-05-303.
(1)
The postclosure cost estimate must be based on the cost to the owner or operator
of hiring a third party to conduct postclosure care activities. A third party is a party
who is neither a parent or subsidiary of the owner or operator. (See definition of
parent corporation in subsection 4 of section 33.1-24-05-75.)
(2)
The postclosure cost estimate is calculated by multiplying the annual postclosure
cost estimate by the number of years of postclosure care required under section
33.1-24-05-66.
b.
During the active life of the facility, the owner or operator shall address the postclosure
cost estimate for inflation within sixty days prior to the anniversary date of the
establishment of the financial instruments used to comply with section 33.1-24-05-77. For
owners or operators using the financial test or corporate guarantee, the postclosure cost
estimate must be updated for inflation within thirty days after the close of the firm's fiscal
year and before the submission of updated information to the department as specified in
subdivision e of subsection 6 of section 33.1-24-05-77. The adjustment may be made by
recalculating the postclosure cost estimate in current dollars or by using an inflation
factor derived from the most recent implicit price deflator for gross national product
published by the United States department of commerce in a survey of current business
as specified in paragraphs 1 and 2. The inflation factor is the result of dividing the latest
annual published deflator by the deflator for the previous year.
(1)
The first adjustment is made by multiplying the postclosure cost estimate by the
inflation factor. The result is the adjusted postclosure cost estimate.
(2)
Subsequent adjustments are made by multiplying the latest adjusted postclosure
cost estimate by the latest inflation factor.
c.
During the active life of the facility, the owner or operator shall revise the postclosure cost
estimate within thirty days after the department has approved a request to modify the
postclosure plan, if the change in the postclosure plan increases the cost of postclosure
care. The revised postclosure cost estimate must be adjusted for inflation as specified in
subdivision b.
d.
The owner or operator shall keep the following at the facility during the operating life of
the facility: the latest postclosure cost estimate prepared in accordance with subdivisions
a and c and, when this estimate has been adjusted in accordance with subdivision b, the
latest adjusted postclosure cost estimate.