NDAC 33.1-24-08-31
Release detection requirements for petroleum underground storage tank systems
Cite as N.D. Admin. Code ยง 33.1-24-08-31
Owners and operators of petroleum underground storage tank systems must provide release
detection for tanks and piping as follows:
1.
Tanks. Tanks must be monitored for releases as follows:
a.
Tanks installed on or before September 28, 2018, must be monitored for releases at least
every thirty days using one of the methods listed in subsections 4 through 9 of section
33.1-24-08-33 except that:
(1)
Underground storage tank systems that meet the performance standards in section
33.1-24-08-10 or 33.1-24-08-11, and the monthly inventory control requirements in
subsection 1 or 2 of section 33.1-24-08-33, may use tank tightness testing
(conducted in accordance with subsection 3 of section 33.1-24-08-33) at least every
five years until ten years after the tank was installed and tanks with capacity of five
hundred fifty gallons [2081.98 liters] or less and tanks with a capacity of five
hundred fifty-one to one thousand gallons which meet the tank diameter criteria in
subsection 2 of section 33.1-24-08-33 may use manual tank gauging (conducted in
accordance with subsection 2 of section 33.1-24-08-33).
(2)
Tanks installed after September 28, 2018, must be monitored for releases at least
every thirty days in accordance with subsection 7 of section 33.1-24-08-33.
2.
Piping. Underground piping that routinely contains regulated substances must be monitored
for releases in a manner that meets one of the following requirements:
a.
Piping installed on or before September 28, 2018, must meet one of the following:
(1)
Pressurized piping. Underground piping that conveys regulated substances under
pressure must:
(a)
Be equipped with an automatic line leak detector conducted in accordance with
subsection 1 of section 33.1-24-08-34; and
(b)
Have an annual line tightness test conducted in accordance with subsection 2
of section 33.1-24-08-34 or have monthly monitoring conducted in accordance
with subsection 3 of section 33.1-24-08-34.
(2)
Suction piping. Underground piping that conveys regulated substances under
suction must either have a line tightness test conducted at least every three years
and in accordance with subsection 2 of section 33.1-24-08-34, or use a monthly
monitoring method conducted in accordance with subsection 3 of section
33.1-24-08-34. No release detection is required for suction piping that is designed
and constructed to meet the following standards:
(a)
The below-grade piping operates at less than atmospheric pressure;
(b)
The below-grade piping is sloped so that the contents of the pipe will drain
back into the storage tank if the suction is released;
(c)
Only one check valve is included in each suction line;
(d)
The check valve is located directly below and as close as practical to the
suction pump; and
(e)
A method is provided that allows compliance with subparagraphs b through d
to be readily determined.
b.
Piping installed or replaced after September 28, 2018, must meet one of the following:
(1)
Pressurized piping must be monitored for releases at least every thirty days in
accordance with subsection 7 of section 33.1-24-08-33 and be equipped with an
automatic line leak detector in accordance with subsection 1 of section
33.1-24-08-34; or
(2)
Suction piping must be monitored for releases at least every thirty days in
accordance with subsection 7 of section 33.1-24-08-33. No release detection is
required for suction piping that meets subparagraphs a through e of paragraph 2 of
subdivision a of subsection 2.