NDAC 43-02-02.2-69

General postclosure inspection, annual report, and maintenance activities

Last amended: 2009Year: 2026Length: 203 wordsOfficial source

Cite as N.D. Admin. Code ยง 43-02-02.2-69

During the postclosure period, the operator shall conduct site maintenance and other activities in accordance with the approved postclosure plan, including the following, as applicable: 1. Conduct quarterly inspections of the entire mine site to monitor the following: a. Condition of vegetation; b. Erosion and sediment controls; c. Wellheads; d. Subsidence; e. Impoundments; f. Safety hazards; and g. Other potential problems; 2. Maintain vegetation and repair damage to vegetation by taking such steps as adding topsoil, seeding, planting, fertilizing, and mulching; 3. Control noxious weeds; 4. Maintain erosion and sediment control structures. If sediment and erosion controls in an area become unnecessary the structures may be removed for aesthetic purposes; 5. Repair leaking wellheads and replug wells as necessary; 6. Maintain and repair impoundments to ensure stability; 7. Monitor areas of subsidence, fencing subsidence areas as necessary, or undertaking slope reduction as necessary; 8. Maintain locking gates, fences, and warning signs to limit access to the site; 9. Remove or dispose of trash and other waste; 10. Maintain fire protection; 11. Provide equipment, tools, and power to conduct maintenance activities; and 12. As required by the department, all maintenance and repair work must be documented in annual postclosure reports submitted to the department.
NDAC 43-02-02.2-69: General postclosure inspection, annual report, and maintenance activities | Justis AI