North Dakota ยท Regulations
Chapter 43-02-02.2 โ In Situ Leach Mineral Mining Rules
87 sections
87 sections
- NDAC 43-02-02.2-01Definitions
- NDAC 43-02-02.2-02Scope of chapter
- NDAC 43-02-02.2-03Permit required
- NDAC 43-02-02.2-04Submission of permit application
- NDAC 43-02-02.2-05Review for completeness
- NDAC 43-02-02.2-06Review period
- NDAC 43-02-02.2-07Permit application and annual operating fees
- NDAC 43-02-02.2-08Notice of hearing
- NDAC 43-02-02.2-09Information added after filing date
- NDAC 43-02-02.2-10Notice to agencies
- NDAC 43-02-02.2-11Summary document
- NDAC 43-02-02.2-12Permit approval or denial
- NDAC 43-02-02.2-13Bond
- NDAC 43-02-02.2-14Permit application - General requirements
- NDAC 43-02-02.2-15Permit application - General contents
- NDAC 43-02-02.2-16Permit application - Additional baseline information
- NDAC 43-02-02.2-17Permit application - Mine operations plan
- NDAC 43-02-02.2-18Permit application - Reclamation plan
- NDAC 43-02-02.2-19Determination of ground water restoration demonstration
- NDAC 43-02-02.2-20Ground water restoration values
- NDAC 43-02-02.2-21Establishing baseline water quality and control parameters in new mining areas
- NDAC 43-02-02.2-22Technical revisions to an in situ leach mine permit
- NDAC 43-02-02.2-23Designation of exempted aquifers
- NDAC 43-02-02.2-24Injection wells subject to this chapter
- NDAC 43-02-02.2-25Well location and protection
- NDAC 43-02-02.2-26Well construction requirements - General
- NDAC 43-02-02.2-27Well construction requirements - Injection wells
- NDAC 43-02-02.2-28Monitoring wells - Minimum requirements
- NDAC 43-02-02.2-29Disposal of drill cuttings
- NDAC 43-02-02.2-30Mechanical integrity
- NDAC 43-02-02.2-31Supervision of well construction and testing
- NDAC 43-02-02.2-32Requirements for plugging drill holes and repair, conversion, and plugging wells
- NDAC 43-02-02.2-33Corrective actions for improperly sealed wells
- NDAC 43-02-02.2-34Authorizing new injection wells within permit area boundary
- NDAC 43-02-02.2-35Design and construction of surface facilities
- NDAC 43-02-02.2-36Construction quality assurance plan
- NDAC 43-02-02.2-37Pipeline design and construction requirements
- NDAC 43-02-02.2-38Radioactive element recovery plant and satellite facility design and construction requirements
- NDAC 43-02-02.2-39Radioactive element byproduct material handling and disposal systems
- NDAC 43-02-02.2-40Disposal of liquid waste
- NDAC 43-02-02.2-41Disposal of nonradioactive solid waste
- NDAC 43-02-02.2-42Prohibitions - Injection volumes and pressure
- NDAC 43-02-02.2-43Production area operational monitoring requirements
- NDAC 43-02-02.2-44Production area monitoring well location and spacing requirements
- NDAC 43-02-02.2-45Nonproduction zone monitoring
- NDAC 43-02-02.2-46Subsidence monitoring
- NDAC 43-02-02.2-47Confinement of recovery fluid
- NDAC 43-02-02.2-48Excursions - Reporting requirement
- NDAC 43-02-02.2-49Excursions - Verifying analysis
- NDAC 43-02-02.2-50Excursions - Sampling frequency
- NDAC 43-02-02.2-51Excursions - Remedial action
- NDAC 43-02-02.2-52Excursions - Controlled
- NDAC 43-02-02.2-53Excursions - Not controlled
- NDAC 43-02-02.2-54Criteria for determination of adequacy of remedial action plan
- NDAC 43-02-02.2-55General reporting requirements
- NDAC 43-02-02.2-56Well construction records
- NDAC 43-02-02.2-57Well plugging records
- NDAC 43-02-02.2-58Maintenance and retention of records
- NDAC 43-02-02.2-59Ground water restoration requirements
- NDAC 43-02-02.2-60Restoration sampling procedure
- NDAC 43-02-02.2-61Restoration progress reports
- NDAC 43-02-02.2-62Final restoration - Restoration values achieved
- NDAC 43-02-02.2-63Restoration values not achieved
- NDAC 43-02-02.2-64Closure of mine site following restoration
- NDAC 43-02-02.2-65Postclosure plan - Postclosure bond - Estimated costs for postclosure care
- NDAC 43-02-02.2-66Reclamation of surface facilities
- NDAC 43-02-02.2-67Radiation survey of surface facilities at mine closure
- NDAC 43-02-02.2-68Radiation standards for closure of surface facilities
- NDAC 43-02-02.2-69General postclosure inspection, annual report, and maintenance activities
- NDAC 43-02-02.2-70Postclosure operation of monitoring systems
- NDAC 43-02-02.2-71Ground water contamination during the postclosure period
- NDAC 43-02-02.2-72Approval of the end of the postclosure period
- NDAC 43-02-02.2-73Available information on in situ leach mines
- NDAC 43-02-02.2-74Final bond release
- NDAC 43-02-02.2-75Additional information may be required
- NDAC 43-02-02.2-76Application for hearing
- NDAC 43-02-02.2-77Hearing participants by telephone
- NDAC 43-02-02.2-78Hearings - Complaint proceedings - Emergency proceedings - Other proceedings
- NDAC 43-02-02.2-79Investigatory hearings
- NDAC 43-02-02.2-80Official notice
- NDAC 43-02-02.2-81Notice of order by mail
- NDAC 43-02-02.2-82Record of proceedings
- NDAC 43-02-02.2-83Designation of examiners
- NDAC 43-02-02.2-84Powers and duties of examiner
- NDAC 43-02-02.2-85Examiner's recommended findings, conclusions, and proposed order
- NDAC 43-02-02.2-86Commission order
- NDAC 43-02-02.2-87Prehearing motion practice