NDAC 43-02-02.2-50
Excursions - Sampling frequency
Cite as N.D. Admin. Code ยง 43-02-02.2-50
Throughout the time when any control parameter is present in a monitoring well, a water sample
must be taken at least two times a week from the well. The samples must be analyzed for all control
parameters within one week after the sample is taken.