NDAC 43-05-01-05
Storage facility permit
Cite as N.D. Admin. Code ยง 43-05-01-05
1.
An application for a permit must include the following:
a.
A site map showing the boundaries of the storage reservoir and the location of all
proposed wells, proposed cathodic protection boreholes, and surface facilities within the
carbon dioxide storage facility area;
b.
A technical evaluation of the proposed storage facility, including the following:
(1)
The name, description, and average depth of the storage reservoirs;
(2)
A geologic and hydrogeologic evaluation of the facility area, including an evaluation
of all existing information on all geologic strata overlying the storage reservoir,
including the immediate caprock containment characteristics and all subsurface
zones to be used for monitoring. The evaluation must include any available
geophysical data and assessments of any regional tectonic activity, local seismicity
and regional or local fault zones, and a comprehensive description of local and
regional structural or stratigraphic features. The evaluation must describe the
storage reservoir's mechanisms of geologic confinement, including rock properties,
regional pressure gradients, structural features, and adsorption characteristics with
regard to the ability of that confinement to prevent migration of carbon dioxide
beyond the proposed storage reservoir. The evaluation must also identify any
productive existing or potential mineral zones occurring within the facility area and
any underground sources of drinking water in the facility area and within one mile
[1.61 kilometers] of its outside boundary. The evaluation must include exhibits and
plan view maps showing the following:
(a)
All wells, including water, oil, and natural gas exploration and development
wells, and other manmade subsurface structures and activities, including coal
mines, within the facility area and within one mile [1.61 kilometers] of its
outside boundary;
(b)
All manmade surface structures that are intended for temporary or permanent
human occupancy within the facility area and within one mile [1.61 kilometers]
of its outside boundary;
(c)
Any regional or local faulting;
(d)
An isopach map of the storage reservoirs;
(e)
An isopach map of the primary and any secondary containment barrier for the
storage reservoir;
(f)
A structure map of the top and base of the storage reservoirs;
(g)
Identification of all structural spill points or stratigraphic discontinuities
controlling the isolation of stored carbon dioxide and associated fluids within
the storage reservoir;
(h)
Evaluation of the pressure front and the potential impact on underground
sources of drinking water, if any;
(i)
Structural and stratigraphic cross sections that describe the geologic
conditions at the storage reservoir;
(j)
The location, orientation, and properties of known or suspected faults and
fractures that may transect the confining zone in the area of review, and a
determination that they would not interfere with containment;
(k)
Data on the depth, areal extent, thickness, mineralogy, porosity, permeability,
and capillary pressure of the injection and confining zone, including facies
changes based on field data, which may include geologic cores, outcrop data,
seismic surveys, well logs, and names and lithologic descriptions;
(l)
Geomechanical information on fractures, stress, ductility, rock strength, and in
situ fluid pressures within the confining zone. The confining zone must be free
of transmissive faults or fractures and of sufficient areal extent and integrity to
contain the injected carbon dioxide stream;
(m)
Information on the seismic history, including the presence and depth of seismic
sources and a determination that the seismicity would not interfere with
containment;
(n)
Geologic and topographic maps and cross sections illustrating regional
geology, hydrogeology, and the geologic structure of the facility area; and
(o)
Identify and characterize additional strata overlying the storage reservoir that
will prevent vertical fluid movement, are free of transmissive faults or fractures,
allow for pressure dissipation, and provide additional opportunities for
monitoring, mitigation, and remediation.
(3)
A review of the data of public record, conducted by a geologist or engineer, for all
wells within the facility area, which penetrate the storage reservoir or primary or
secondary seals overlying the reservoir, and all wells within the facility area and
within one mile [1.61 kilometers], or any other distances deemed necessary by the
commission, of the facility area boundary. The review must include the following:
(a)
A determination that all abandoned wells have been plugged and all operating
wells have been constructed in a manner that prevents the carbon dioxide or
associated fluids from escaping from the storage reservoir;
(b)
A description of each well's type, construction, date drilled, location, depth,
record of plugging, and completion;
(c)
Maps and stratigraphic cross sections indicating the general vertical and lateral
limits of all underground sources of drinking water, water wells, and springs
within the area of review; their positions relative to the injection zone; and the
direction of water movement, where known;
(d)
Maps and cross sections of the area of review;
(e)
A map of the area of review showing the number or name and location of all
injection wells, producing wells, abandoned wells, plugged wells or dry holes,
deep stratigraphic boreholes, state-approved or United States environmental
protection agency-approved subsurface cleanup sites, surface bodies of water,
springs, mines (surface and subsurface), quarries, water wells, other pertinent
surface features, including structures intended for human occupancy, state,
county, or Indian country boundary lines, and roads;
(f)
A list of contracts, submitted to the commission, when the area of review
extends across state jurisdiction boundary lines;
(g)
Baseline geochemical data on subsurface formations, including all
underground sources of drinking water in the area of review; and
(h)
Any additional information the commission may require.
(4)
The proposed calculated average and maximum daily injection rates, daily volume,
and the total anticipated volume of the carbon dioxide stream using a method
acceptable to and filed with the commission;
(5)
The proposed average and maximum bottom hole injection pressure to be utilized at
the reservoir. The maximum allowed injection pressure, measured in pounds per
square inch gauge, shall be approved by the commission and specified in the
permit. In approving a maximum injection pressure limit, the commission shall
consider the results of well tests and other studies that assess the risks of tensile
failure and shear failure. The commission shall approve limits that, with a
reasonable degree of certainty, will avoid initiating a new fracture or propagating an
existing fracture in the confining zone or cause the movement of injection or
formation fluids into an underground source of drinking water;
(6)
The proposed preoperational formation testing program to obtain an analysis of the
chemical and physical characteristics of the injection zone and confining zone
pursuant to section 43-05-01-11.2;
(7)
The proposed stimulation program, a description of stimulation fluids to be used,
and a determination that stimulation will not interfere with containment; and
(8)
The proposed procedure to outline steps necessary to conduct injection operations.
c.
The extent of the pore space that will be occupied by carbon dioxide as determined by
utilizing all appropriate geologic and reservoir engineering information and reservoir
analysis, which must include various computational models for reservoir characterization,
and the projected response of the carbon dioxide plume and storage capacity of the
storage reservoir. The computational model must be based on detailed geologic data
collected to characterize the injection zones, confining zones, and any additional zones;
d.
An emergency and remedial response plan pursuant to section 43-05-01-13;
e.
A detailed worker safety plan that addresses carbon dioxide safety training and safe
working procedures at the storage facility pursuant to section 43-05-01-13;
f.
A corrosion monitoring and prevention plan for all wells and surface facilities pursuant to
section 43-05-01-15;
g.
A leak detection and monitoring plan for all wells and surface facilities pursuant to section
43-05-01-14. The plan must:
(1)
Identify the potential for release to the atmosphere;
(2)
Identify potential degradation of ground water resources with particular emphasis on
underground sources of drinking water; and
(3)
Identify potential migration of carbon dioxide into any mineral zone in the facility
area;
h.
A leak detection and monitoring plan to monitor any movement of the carbon dioxide
outside of the storage reservoir. This may include the collection of baseline information of
carbon dioxide background concentrations in ground water, surface soils, and chemical
composition of in situ waters within the facility area and the storage reservoir and within
one mile [1.61 kilometers] of the facility area's outside boundary. Provisions in the plan
will be dictated by the site characteristics as documented by materials submitted in
support of the permit application but must:
(1)
Identify the potential for release to the atmosphere;
(2)
Identify potential degradation of ground water resources with particular emphasis on
underground sources of drinking water; and
(3)
Identify potential migration of carbon dioxide into any mineral zone in the facility
area;
i.
The proposed well casing and cementing program detailing compliance with section
43-05-01-09;
j.
An area of review and corrective action plan that meets the requirements pursuant to
section 43-05-01-05.1;
k.
The storage operator shall comply with the financial responsibility requirements pursuant
to section 43-05-01-09.1;
l.
A testing and monitoring plan pursuant to section 43-05-01-11.4;
m.
A plugging plan that meets requirements pursuant to section 43-05-01-11.5;
n.
A postinjection site care and facility closure plan pursuant to section 43-05-01-19; and
o.
Any other information that the commission requires.
2.
Any person filing a permit application or an application to amend an existing permit shall pay a
processing fee. The fee will be based on actual processing costs, including computer data
processing costs, incurred by the commission.
a.
A record of all application processing costs incurred must be maintained by the
commission.
b.
Promptly after receiving an application, the commission shall prepare and submit to the
applicant an estimate of the processing fee and a payment billing schedule.
c.
After the commission's work on the application has concluded, a final statement will be
sent to the applicant. The full processing fee must be paid before the commission issues
its final decision on an application.
d.
The applicant must pay the processing fee regardless of whether a permit is issued or
denied, or the application withdrawn.
3.
The commission has one year from the date an application is deemed complete to issue a
final decision regarding the application.