NDAC 43-05-01-11.2
Logging, sampling, and testing prior to injection well operation
Cite as N.D. Admin. Code ยง 43-05-01-11.2
1.
During the drilling and construction of an injection well, the storage operator shall run
appropriate logs, surveys, and tests to determine or verify the depth, thickness, porosity,
permeability, lithology, and salinity of any formation fluids in all relevant geologic formations to
ensure conformance with the injection well construction requirements under section
43-05-01-11, and to establish accurate baseline data against which future measurements may
be compared. The storage operator shall submit to the commission a descriptive report
prepared by a log analyst that includes an interpretation of the results of such logs and tests.
At a minimum, such logs and tests must include:
a.
Deviation checks during drilling on all holes constructed by drilling a pilot hole which is
enlarged by reaming or another method. Such checks must be at sufficiently frequent
intervals to determine the location of the borehole and to ensure that vertical avenues for
fluid movement in the form of diverging holes are not created during drilling.
b.
Before and upon installing the surface casing:
(1)
Resistivity, spontaneous potential, and caliper logs before the casing is installed;
and
(2)
A cement bond and variable density log to evaluate cement quality radially and a
temperature log after the casing is set and cemented.
c.
Before and upon installation of the long string casing:
(1)
Resistivity, spontaneous potential, porosity, caliper, gamma ray, fracture finder logs,
and any other logs the commission requires for the given geology before the casing
is installed; and
(2)
A cement bond and variable density log, and a temperature log after the casing is
set and cemented.
d.
A series of tests designed to demonstrate the internal and external mechanical integrity
of injection wells, which may include:
(1)
A pressure test with liquid or gas;
(2)
A tracer survey;
(3)
A temperature or noise log;
(4)
A casing inspection log; and
e.
Any alternative methods that provide equivalent or better information and that the
commission requires or approves.
2.
The storage operator shall take whole cores or sidewall cores of the injection zone and
confining zone and formation fluid samples from the injection zone, and shall submit to the
commission a detailed report prepared by a log analyst that includes well log analyses
(including well logs), core analyses, and formation fluid sample information. The commission
may accept information on cores from nearby wells if the storage operator can demonstrate
that core retrieval is not possible and that such cores are representative of conditions at the
well. The commission may require the storage operator to core other formations in the
borehole.
3.
The storage operator shall record the fluid temperature, pH, conductivity, reservoir pressure,
and static fluid level of the injection zone.
4.
At a minimum, the storage operator shall determine or calculate the following information
concerning the injection and confining zone:
a.
Fracture pressure;
b.
Other physical and chemical characteristics of the injection and confining zone; and
c.
Physical and chemical characteristics of the formation fluids in the injection zone.
5.
Upon completion, but prior to operation, the storage operator shall conduct the following tests
to verify hydrogeologic characteristics of the injection zone:
a.
Pressure fall-off test; and
b.
Pump test; or
c.
Injectivity test.
6.
The storage operator shall provide the commission with the opportunity to witness all logging
and testing carried out under this section. The storage operator shall submit a schedule of
such activities to the commission thirty days prior to conducting the first test and submit any
changes to the schedule thirty days prior to the next scheduled test.