NDAC 43-05-01-11.3
Injection well operating requirements
Cite as N.D. Admin. Code ยง 43-05-01-11.3
1.
Except during stimulation, the storage operator shall ensure that injection pressure does not
exceed ninety percent of the fracture pressure of the injection zone so as to ensure that the
injection does not initiate new fractures or propagate existing fractures in the injection zone.
Injection pressure must never initiate fractures in the confining zone or cause the movement
of injection or formation fluids that endanger an underground source of drinking water. All
stimulation programs are subject to the commission's approval as part of the storage facility
permit application and incorporated into the permit.
2.
Injection between the outermost casing protecting underground sources of drinking water and
the well bore is prohibited.
3.
The storage operator shall fill the annulus between the tubing and the long string casing with a
noncorrosive fluid approved by the commission. The storage operator shall maintain on the
annulus a pressure that exceeds the operating injection pressure, unless the commission
determines that such requirement might harm the integrity of the well or endanger
underground sources of drinking water.
4.
Other than during periods approved by the commission in which the sealed tubing-casing
annulus is disassembled for maintenance or corrective procedures, the storage operator shall
maintain mechanical integrity of the injection well at all times.
5.
The storage operator shall install and use:
a.
Continuous recording devices to monitor the injection pressure; the rate, volume or
mass, and temperature of the carbon dioxide stream; and the pressure on the annulus
between the tubing and the long string casing and annulus fluid volume; and
b.
Alarms and automatic surface shutoff systems or, at the discretion of the commission,
down-hole shutoff systems (e.g., automatic shutoff, check valves) or, other mechanical
devices that provide equivalent protection that are designed to alert the operator and
shut-in the well when operating parameters diverge beyond permitted ranges or
gradients specified in the permit.
6.
If a shutdown (down-hole or at the surface) is triggered or a loss of mechanical integrity is
discovered, the storage operator shall immediately investigate and identify the cause as
expeditiously as possible. If, upon such investigation, the well appears to be lacking
mechanical integrity, or if monitoring required under subsection 5 indicates that the well may
lack mechanical integrity, the storage operator shall:
a.
Immediately cease injection;
b.
Take all steps reasonably necessary to determine whether there may have been a
release of the injected carbon dioxide stream or formation fluids into any unauthorized
zone;
c.
Notify the commission within twenty-four hours;
d.
Restore and demonstrate mechanical integrity to the satisfaction of the commission prior
to resuming injection; and
e.
Notify the commission when injection can be expected to resume.
7.
If any monitoring indicates the movement of injection or formation fluids into underground
sources of drinking water, the commission shall prescribe such additional requirements for
construction, corrective action, operation, monitoring, or reporting as are necessary to prevent
such movement. These additional requirements must be imposed by modifying or terminating
the permit in accordance with section 43-05-01-12 if the commission determines that cause
exists, or appropriate enforcement action may be taken if the permit has been violated.