Nebraska ยท Regulations
Chapter 4 โ TRANSMISSION LINES
3 sections
3 sections
- 17 NAC 4-00117 NAC 4-001. Upon the filing of an application for permission to construct or alter any overhead wire, cable or pipeline as provided in Neb
- 17 NAC 4-00217 NAC 4-002. The requirement which must be met by an applicant to obtain approval is as follows:
- 17 NAC 4-00317 NAC 4-003. When a proposed structure is near an airport, the Division may require the applicant to furnish an FAA determination in regards to FAR Part 77