OAC 252:626-3-2
Applications
Cite as Okla. Admin. Code § 252:626-3-2
(a) Submit legible applications on forms provided by the DEQ and include:
(1) the type of entity that is applying
(2) the legal description,
(3) a minimum of 2 sets of plans and specifications, with at least one set of construction
plans printed on 11" x 17" paper and one set of specifications loosely bound that is suitable
for scanning,
(4) a final design analysis. Provided, an authorized design-build project may use the flexible
permitting process upon approval by DEQ as provided in these rules. If design-build is used,
the final design package must encompass the entire completed project,
(5) all appropriate fees, and
(6) engineering report approved by the DEQ for major waterworks projects, or smaller
projects utilizing non-conventional processes.
(b) Public entities other than municipalities must provide certified copies of the results of the last
election or appointment of the members of the governing body. Public entities must provide a
citation of legal authority to own and operate the proposed facility.
(c) Applicants other than public entities must provide copies of documents that created them and
provide a citation to their statutory authority.