Oregon · Regulations
Division 105 — WELDED REPAIR OF LOG TRUCK REACHES; EQUIPMENT: LOGS, POLES OR PILING
19 sections
19 sections
- OAR 740-105-0010OAR 740-105-0010. General Information
- OAR 740-105-0100OAR 740-105-0100. General
- OAR 740-105-0110OAR 740-105-0110. Joint Design
- OAR 740-105-0120OAR 740-105-0120. Approved Repair Splice Configuration Diagram
- OAR 740-105-0130OAR 740-105-0130. Welding Procedure
- OAR 740-105-0140OAR 740-105-0140. Filler Metals
- OAR 740-105-0150OAR 740-105-0150. Electrical Characteristics of Power Sources
- OAR 740-105-0160OAR 740-105-0160. Preparation of Base Metals
- OAR 740-105-0170OAR 740-105-0170. Groove Welds and Weld Profiles
- OAR 740-105-0180OAR 740-105-0180. Arc Strikes
- OAR 740-105-0190OAR 740-105-0190. Interpass Cleaning
- OAR 740-105-0200OAR 740-105-0200. Weld Deposition Techniques
- OAR 740-105-0210OAR 740-105-0210. Methods of Preheating
- OAR 740-105-0220OAR 740-105-0220. Inclement Weather Protection
- OAR 740-105-0230OAR 740-105-0230. Visual Inspection
- OAR 740-105-0240OAR 740-105-0240. Safety Precautions
- OAR 740-105-0250OAR 740-105-0250. Welder Qualification
- OAR 740-105-0260OAR 740-105-0260. Records of Repair
- OAR 740-105-0270OAR 740-105-0270. Reach Repair Identification