OAR 740-105-0210

OAR 740-105-0210. Methods of Preheating

Last amended: 1996Length: 99 wordsOfficial source
(1) Preheating may be accomplished by flame or electrical resistance method. (2)(a) Preheat parameters. (b) All preheating performed under the conditions of this procedure must comply with the following preheat parameters. (A) In cases where no preheat is specified, and the ambient temperature is below 32°F, the base metal must be preheated to at least 70°F prior to welding and/or tack welding. (B) Preheating will be done at least three (3) inches laterally and in advance of the welding. (C) Welding will not be performed on surfaces that are wet or under high wind conditions without proper weather protection.
OAR 740-105-0210: OAR 740-105-0210. Methods of Preheating | Justis AI