OAR 918-020-0470
OAR 918-020-0470. Statewide Master Builder Program — Assumption of Responsibility
(1) When waiving government performance of plan review or required inspections, a building official shall require the master builder to sign a form that specifically identifies each waiver and that states that the master builder accepts the duty of performing the review and verifications.
(2) A master builder who accepts the duty of performing a review or verification remains responsible for that duty unless released by written and signed permission of the building official. A building official may release a master builder from a review or verification by a written and signed assumption of the review or inspection duty by the building official or written and signed assumption of the review and verification duty by another master builder.