OAR 918-400-0630
OAR 918-400-0630. Provisional Permits for Elevators Under Construction
(1) A construction-use (workman's) permit is only issued to an elevator contractor while the elevator is under construction and may be granted under the following conditions:
(a) The elevator must only be used for transportation of workers and materials necessary for the physical construction and inspection of the site and may not be used by the general public;
(b) Notification must be given to the division before making any elevator changes, except those necessary to complete construction of the elevator;
(c) The installation meets all requirements of the Oregon Elevator Specialty Code;
(d) An operator is provided for all elevator operations unless the elevator meets all requirements for normal operations; and
(e) The provisional permit must be:
(A) Specific to a particular elevator; and
(B) Attached to the car enclosure in plain view.
(2) Notwithstanding any expiration date placed on a provisional permit, the permit automatically terminates upon issuance of an operating permit.
[Publications: Publications referenced are available from the agency.]